,e
.
.
JAN 211986
Docket No. 50-412
Duquesne Light Company
ATTN: Mr. J. J. Carey
Vice President
Nuclear Group
Robinson Plaza Building No. 2
Suite #210, PA Route 60
Pittsburgh, Pennsylvania 15077
Gentlemen:
Subject:
Inspection Report No. 50-412/85-26
This refers to the routine safety inspection conducted by Messrs. G. A. Walton and
L. J. Prividy of this office on December 3,1985 - January 6,1986 at the Beaver
Valley Power Station, Unit 2, Shippingport, Pennsylvania of activities authorized
by NRC License No. CPPR-105 and to the discussions of our findings held by Mr.
Walton with Mr. Ewing and other members of your staff at the conclusion of the
inspection.
We acknowledge your response dated December 27, 1985 to the noncompliance identi-
fled in Inspection Report 85-21 regarding the Quality Control inspector error.
We will perform inspections of your corrective actions in future inspections.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter.
Within these areas, the inspection
consisted of selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
However, several
areas of concern were identified which are listed in the report results.
No reply to this letter is required.
Your cooperation with us in this matter is
appreciated.
Sincerely,
- 0rininci Sicced ByI
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report 50-412/85-26 with
Attachment 1, Interoffice Memorandum, Stone and Webster Engineering
Attachment 2, Initial Problem Report Number IPR 51126, Supplement I
8601270236 860121
ADOCK 05000412-
O
It
- ..
.A -
-
!
'
Duquesne Light Company
2
cc w/ encl:
,
E. J. Woolever, Vice President, Nuclear Construction Division
E. Ewing, Quality Assurance Manager
s
R. J. Swiderski, Manager, Startup Group
,
R. E. Martin, Manager, Engineering
-
E. F. Kurtz, Jr., Manager, Regulatory Affairs
s
P. Raysircar, Stone and Webster Engineering Corporation
\\
Public Document Room (PDR)
'
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
i
Commonwealth of Pennsylvania
bcc w/ encl:
l
Region I Docket Room (with concurrences)
'
Management Assistant, DRMA (w/o encl)
DRP Section Chief
T. Rebelowski, SRI, Millstone 3
W. Troskoski, SRI, BV-1
'
B. Singh, LPM, NRR
,
!
,
i
d
PRP
Rf RP
P
a ton /meo
ipp
We zinger
1/ /86
ulpg
)
i
.
OFlICIAL RECORD COPY