ML20140B596

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-12 on 860221-24.No Violations or Deviations Noted
ML20140B596
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/18/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20140B600 List:
References
NUDOCS 8603240246
Download: ML20140B596 (1)


See also: IR 05000400/1986012

Text

.

_

-

MAR 181986

,e

,

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NO. 50-400/86-12

On February 21-24, 1986, NRC inspected activities authorized by NRC Construction

Permit No. CPPR-158 for your Shearon Harris facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff identi-

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

R L C. b m A-

Vinc

W. Panciera, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-400/86-12

cc w/ enc 1:

R. A. Watson, Vice President

Harris Nuclear Project

i

R. M. Parsons, Project General Manager

J. L. Willis, Plant General Manager

bec w/ enc 1:

NRC Resident Inspector

Document Control Desk

State of North Carolina

'

RII

RII

RI

RII

JLe a an:ht

FJape

ARHerdt

VWPanciera

,

J/g/86

J/ )/86

2/\\t/86

2

[)'86

A

0603240246 860318

'

PDR

ADOCK 05000400

0

PDR

f

f

3 ol

C

.

- -

-

.

-

-

-

.

.

.

- -

-

-