I ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Docket Nos. 50-338 & 50-339 4

North Anna Unit 2 License Nos. NPF-4 & NPF-7 The following violation was identified during an inspection conducted on February 3 - March 2,1986. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification 6.8.1 requires that written procedures be

, established, implemented and maintained covering the areas recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978, which includes surveillance testing of the electrical system.

Section 4.3.2 of surveillance procedure 2-PT-83.4, dated July 25, 1985, requires that the operator maintain an electrical load between 2900-3000 kw for the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> emergency diesel generator run.

Contrary to the above, procedure 2-PT-83.4 was not fully implemented, in that, on February 23, 1986, the emergency diesel generator 2J was loaded to approximately 3200 kw for 7.5 minutes and then again to approximately 3450 kw for 1.5 minutes.

This is a Severity Level IV violation (Supplement I) and applies to Unit 2 only.

Pursuant to 10 CFR 2.201, you are required to submit to this office within thirty 4

days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.