Provides Status of Resolution of Violation Identified in IE Rept 50-400/83-29 Re Failure to Control Fastening Matl. Investigation for Acceptability of Previously Installed Fasteners & Corrective Action Completed
ML20140B551
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/08/1986
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-414 HO-860227-(O), NUDOCS 8601270041
Download: ML20140B551 (2)


Text

r mb CD&L Carolina Power &,L{ght Company

- l a d c, n.,

SHEARON HARRIS NUCLEAR PROJECT P. O. Box 165 New Hill, NC 27562 January 8, 1986 File Number: SHF/10-13510E Letter Number: HO-860227 (0)

Dr. J. Nelson Grace NRC-414 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30323

Dear Dr. Grace:

The following is the status of our progress to date on resolving the violation identified in I.E. Report 50-400/83-29, Failure to Control Fastening Material.

In our March 29, 1985, letter (NRC-342) concerning the referenced violation we stated that our investigation for acceptability of previously installed fasteners was continuing, but additional time to complete the investigation was required.

The investigation for acceptability of previously installed fastencrs included reinspection as individual documentation packages were completed and verified prior to system turnover and our previous projection of January 10, 1986 for completing this investigation was based on the, then current, fuel load and in-service dates.

To date, investigation for acceptability of previously installed fasteners and corrective action, if necessary, have been completed in disciplines where applicable except for HVAC.

Investigation and corrective action in this area are continuing and consist of a system by system walkdown to verify acceptability prior to system turnover.

Our current projected date for completing verification of previously installed fasteners is now May 16, 1986.

1 l

8601270041 860100 gDR ADOCK 0 % hO 16 NBI/OSI 1501

e e

.Dr. J. N21ccn.Cecca NRC-414 Thank you for your consideration in this matter.

i 1

Yours very truly,

[

R. A. Watson Vice President 4

Shearon Harris Nuclear Power Plant 5