U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (as of April 3, 2020) Attachment
ML20139A191
Person / Time
Issue date: 04/03/2020
From: Kristine Svinicki
NRC/Chairman
To: Alexander L, Barrasso J, Braun M, Kaptur M, Pallone F, Rush B, Tonko P
US Congress, US HR (House of Representatives), US SEN (Senate)
Jaclyn Storch, OEDO, 415-2877
Shared Package
ML20106F152 List:
References
CORR-20-0037
Download: ML20139A191 (17)


Text

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 1 Rulemaking 2021 Edition of High 3150- NRC- N/A 12/12/2018 N/A N/A N/A N/A N/A Actions the American AK21 2018-Society of 0289 Mechanical Engineers Boiler and Pressure Vessel Code 2 Rulemaking 2022 Edition of High 3150- NRC- N/A N/A N/A N/A N/A N/A N/A Actions the American AK43 2020-Society of 0030 Mechanical Engineers Operations and Maintenance Code 3 Rulemaking 2023 Edition of High 3150- NRC- N/A 12/12/2018 N/A N/A N/A N/A N/A Actions the American AK42 2020-Society of 0029 Mechanical Engineers Boiler and Pressure Vessel Code 4 Rulemaking Advanced High 3150- NRC- N/A 3/30/2017 N/A 7/21/2020 9/22/2020 7/21/2020 9/22/2020 Actions Boiling-Water AK04 2017-Reactor (ABWR) 0090 Design Certification Renewal 1

Rulemaking activities without a Regulation Identification Number (RIN) have not been approved by the Commission for the NRC staff to begin rulemaking but are included in the table for completeness because rulemaking plans are being prepared by the staff.

Attachment 1

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 5 Rulemaking American Society High 3150- NRC- N/A 7/1/2015 N/A 10/5/2018 11/9/2018 11/5/2019 5/1/2020 Actions of Mechanical AJ74 2016-Engineers 2015 0082 2017 Code Editions Incorporation by Reference 6 Rulemaking American Society High 3150- NRC- N/A 12/12/2018 N/A 10/1/2020 10/23/2020 2/1/2022 2/16/2022 Actions of Mechanical AK22 2018-Engineers 2019 - 0290 2020 Code Editions 7 Rulemaking Approval of High 3150- NRC- N/A 5/1/2016 N/A 7/29/2020 9/23/2020 10/14/2021 12/15/2021 Actions American Society AJ94 2017-of Mechanical 0025 Engineers Code Cases, Revision 39 8 Rulemaking Approval of High 3150- NRC- N/A 12/12/2018 N/A N/A N/A N/A N/A Actions American Society AK23 2018-of Mechanical 0291 Engineers Code Cases, Revision 40 9 Rulemaking Cyber Security High 3150- NRC- N/A 3/24/2015 4/12/2016 10/4/2017 4/30/2020 4/30/2021 8/30/2021 Actions for Fuel Facilities AJ64 2015-0179 10 Rulemaking Drug and Alcohol High 3150- NRC- PRM-26-4, N/A 1/1/2021 1/1/2022 4/1/2022 1/1/2023 4/1/2023 Actions Testing: AJ15 2012- PRM-26-7, Technical Issues 0079 PRM-26-8 and Editorial Changes 2

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 11 Rulemaking Enhanced High 3150- NRC- N/A 2/8/2006 N/A 9/30/2020 12/31/2020 9/20/2021 12/30/2021 Actions Security for AJ41 2014-Special Nuclear 0118 Material2 12 Rulemaking Enhanced High 3150- NRC- N/A 8/15/2008 9/30/2020 3/26/2021 7/23/2021 3/25/2022 7/22/2022 Actions Weapons for AJ55 2015-Spent Fuel 0018 Storage Installations and Transportation Section 161A Authority 13 Rulemaking Enhanced High 3150- NRC- N/A 8/8/2005 N/A 3/16/2015 9/22/2015 5/21/2018 6/30/2020 Actions Weapons, AI49 2011-Firearms 0018

Background

Checks, and Security Event Notifications 14 Rulemaking Fitness-for-Duty High 3150- NRC- N/A 9/1/2012 7/1/2013 2/22/2017 9/16/2019 2/26/2021 5/26/2021 Actions Drug Testing AI67 2009-Program 0225 Requirements 15 Rulemaking Generic High 3150- NRC- N/A 12/14/2018 N/A N/A N/A N/A N/A Actions Environmental AK32 2018-Impact for 0296 License Renewal 16 Rulemaking Greater-Than- High 3150- NRC- N/A 12/22/2015 7/22/2019 N/A N/A N/A N/A Actions Class-C and AK00 2017-Transuranic 0081 Waste 2 The NRC staff, after reconsidering the need for additional requirements, provided options and recommendations to the Commission on October 1, 2019.

3

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 17 Rulemaking Independent High 3150- NRC- PRM-72-6 N/A N/A 9/30/2020 12/28/2020 9/30/2021 12/28/2021 Actions Spent Fuel AI78 2009-Storage 0558 Installation Security Requirements3 18 Rulemaking Industrial High N/A NRC- PRM-34-6 N/A N/A N/A N/A N/A N/A Actions Radiographic 2017-Operations and 0022 Training 19 Rulemaking Integrated High N/A NRC- PRM-37-1 N/A N/A N/A N/A N/A N/A Actions Radioactive 2015-Source Security 0094 and Accountability 20 Rulemaking List of Approved High N/A N/A N/A N/A N/A N/A N/A N/A N/A Actions Spent Fuel Storage Casks

[This is a placeholder for several annually recurring rules.]

3 The NRC staff, after reconsidering the need for additional requirements, provided options and recommendations to the Commission on October 9, 2019.

4

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 21 Rulemaking List of Approved High 3150- NRC- N/A 2/7/2020 N/A 5/22/2020 6/5/2020 5/22/2020 6/5/2020 Actions Spent Fuel AK47 2020-Storage Casks: 0050 Holtec International HI-STORM Flood/Wind Multipurpose Canister Storage System, Certificate of Compliance No.

1032, Amendment No.

5 22 Rulemaking List of Approved High 3150- NRC- N/A 10/1/2019 N/A 4/30/2020 5/28/2020 4/30/2020 5/28/2020 Actions Spent Fuel AK39 2019-Storage Casks: 0202 Standardized NUHOMS System, Certificate of Compliance No.

1004, Renewed Amendment No.

16 5

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 23 Rulemaking List of Approved High 3150- NRC- N/A 12/3/2019 N/A 1/31/2020 4/3/2020 1/31/2020 4/3/2020 Actions Spent Fuel AK40 2019-Storage Casks: 0224 TN Americas LLC NUHOMS EOS Dry Spent Fuel Storage System, Certificate of Compliance No.

1042, Amendment No.

1 24 Rulemaking List of Approved High 3150- NRC- N/A 12/17/2019 N/A 3/24/2020 4/7/2020 3/24/2020 4/7/2020 Actions Spent Fuel AK41 2019-Storage Casks: 0250 Holtec International HI-STORM Flood/Wind Multipurpose Canister Storage System, Certificate of Compliance No.

1032, Amendment No.

4 25 Rulemaking Low-Level High 3150- NRC- N/A 3/18/2009 N/A 7/18/2013 3/26/2015 11/30/2020 8/31/2021 Actions Radioactive AI92 2011-Waste Disposal 0012 6

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 26 Rulemaking NuScale Small High 3150- NRC- N/A 3/23/2017 N/A 8/3/2020 10/15/2020 4/14/2021 6/17/2021 Actions Modular Reactor AJ98 2017-Design 0029 Certification 27 Rulemaking Performance- High 3150- NRC- PRM 3/31/2003 7/31/2008 3/1/2012 3/24/2014 3/16/2016 7/17/2020 Actions Based Emergency AH42 2008- 71, PRM-Core Cooling 0332 50-84 System Acceptance Criteria 28 Rulemaking Reactor Vessel High N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Material 2018-Surveillance 0295 Testing During Period of Extended Operation 29 Rulemaking Regulatory High 3150- NRC- N/A 12/30/2014 11/27/2017 5/7/2018 7/31/2020 3/31/2021 10/15/2021 Actions Improvements AJ59 2015-for Production 0070 and Utilization Facilities Transitioning to Decommissioning 30 Rulemaking Revise High N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Enrichment 2020-Limits to Support 0034 Licensing New Fuel Designs 31 Rulemaking Revision of Fee High 3150- NRC- N/A 11/1/2018 N/A 1/12/2021 1/25/2021 5/12/2021 5/30/2021 Actions Schedules: Fee AK24 2018-Recovery for FY 0292 2021 32 Rulemaking Revision of Fee High 3150- NRC- N/A N/A N/A N/A N/A N/A N/A Actions Schedules: Fee AK44 2020-Recovery for FY 0031 2022 7

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 33 Rulemaking Revision of Fee High 3150- NRC- N/A 11/13/2019 N/A 2/3/2020 2/18/2020 5/12/2020 5/29/2020 Actions Schedules: Fee AK10 2017-Recovery for FY 0228 2020 34 Rulemaking Risk-Informed, High 3150- NRC- N/A N/A 12/15/2022 9/30/2024 4/30/2026 12/15/2026 8/31/2027 Actions Technology AK31 2019-Inclusive 0062 Regulatory Framework for Advanced Reactors 35 Rulemaking U.S. Advanced High 3150- NRC- N/A 2/29/2008 N/A N/A N/A N/A N/A Actions Pressurized AI83 2010-Water Reactor 0133 (US-APWR)

Design Certification 36 Rulemaking Updates for High N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Emerging 2018-Medical 0297 Technologies 37 Rulemaking Adjustment of Medium 3150- NRC- N/A 12/12/2018 N/A N/A N/A 11/13/2020 1/15/2021 Actions Civil Penalties for AK25 2018-Inflation for 0293 Fiscal Year 2021 38 Rulemaking Adjustment of Medium 3150- NRC- N/A N/A N/A N/A N/A N/A 1/14/2022 Actions Civil Penalties for AK45 2020-Inflation for FY 0032 2022 39 Rulemaking Alignment of Medium 3150- NRC- N/A 9/22/2015 12/16/2020 5/26/2022 8/23/2022 3/14/2024 6/19/2024 Actions Licensing AI66 2009-Processes and 0196 Lessons Learned from New Reactor Licensing 8

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 40 Rulemaking Alternative Medium 3150- NRC- N/A 11/19/2018 7/16/2019 1/19/2021 4/19/2021 5/19/2022 8/19/2022 Actions Physical Security AK19 2017-Requirements for 0227 Advanced Reactors 41 Rulemaking Categorical Medium N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Exclusions from 2018-Environmental 0300 Review 42 Rulemaking Controlled Medium 3150- NRC- N/A 1/18/2019 N/A 5/31/2021 8/31/2021 5/31/2022 8/31/2022 Actions Unclassified AK30 2019-Information 0060 43 Rulemaking Decommissioning Medium N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Financial 2017-Assurance for 0031 Germanium-68/Gallium-68 Generators Returned to Manufacturers or Distributors 44 Rulemaking Definition of Medium N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Utilization 2018-Facility for 0299 Medical Radioisotope Facilities 45 Rulemaking Emergency Medium 3150- NRC- N/A 6/22/2016 11/15/2017 10/12/2018 5/15/2020 1/31/2021 4/30/2021 Actions Preparedness AJ68 2015-Requirements for 0225 Small Modular Reactors and Other New Technologies 9

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 46 Rulemaking Financial Medium 3150- NRC- N/A 4/24/2014 N/A 2/28/2018 5/29/2020 11/24/2020 4/29/2021 Actions Qualifications AJ43 2014-Requirements for 0161 Reactor Licensing 47 Rulemaking Geologic Medium 3150- NRC- N/A N/A 9/17/2040 3/17/2042 9/17/2042 9/17/2043 3/17/2044 Actions Repository AI38 2009-Operations Area 0089 (GROA) Fitness-For-Duty Requirements4 48 Rulemaking Geologic Medium 3150- NRC- N/A N/A 3/16/2040 9/16/2041 3/16/2042 3/16/2043 7/15/2043 Actions Repository AI06 2007-Operations Area 0670 Security and Material Control and Accounting Requirements5 49 Rulemaking Groundwater Medium 3150- NRC- N/A 3/24/2006 N/A 1/30/2021 4/30/2021 1/31/2022 4/30/2022 Actions Protection In Situ AI40 2008-Leach Uranium 0421 Recovery Facilities 4 This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the DOE license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

5 This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the DOE license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

10

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 50 Rulemaking Harmonization of Medium 3150- NRC- N/A 8/19/2016 4/12/2019 10/30/2020 3/2/2021 1/28/2022 4/29/2022 Actions Transportation AJ85 2016-Safety 0179 Requirements with IAEA Standards 51 Rulemaking Individual Medium 3150- NRC- PRM-34-7 1/4/2019 N/A N/A 3/18/2020 N/A 3/18/2020 Actions Monitoring AK29 2019-Devices 0031 52 Rulemaking Items Containing Medium 3150- NRC- PRM 8/13/2012 3/31/2021 8/31/2021 11/30/2021 8/31/2022 11/30/2022 Actions Byproduct AJ54 2015- 65 Material 0017 Incidental to Production 53 Rulemaking Miscellaneous Medium N/A N/A N/A N/A N/A N/A N/A N/A N/A Actions Administrative Rulemaking [This is a placeholder for one or more rules making administrative or corrective changes to the CFR]

54 Rulemaking Modification of Medium N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Administrative 2018-Requirements 0298 55 Rulemaking Non-power Medium 3150- NRC- N/A 8/26/2009 10/2/2012 4/7/2016 3/30/2017 6/17/2019 6/26/2020 Actions Production or AI96 2011-Utilization 0087 Facility License Renewal 11

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 56 Rulemaking Reactor Vessel Medium 3150- NRC- N/A 8/8/2014 4/3/2019 5/8/2020 8/10/2020 5/8/2020 8/10/2020 Actions Material AK07 2017-Surveillance 0151 Program Requirements (Appendix H) 57 Rulemaking Receipts-Based Medium 3150- NRC- N/A N/A N/A N/A N/A N/A N/A Actions Small Business AJ51 2014-Size Standards 0264 58 Rulemaking Reporting Medium N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Requirements for 2020- 116 Non-Emergency 0036 Events 59 Rulemaking Revision to the Medium 3150- NRC- N/A 6/1/2014 N/A N/A N/A N/A N/A Actions NRC's Acquisition AJ36 2014-Regulation 0033 (NRCAR) 60 Rulemaking Social Security Medium 3150- NRC- N/A 12/12/2018 N/A 11/22/2019 8/21/2020 11/22/2019 8/21/2020 Actions Number Fraud AK27 2018-Prevention 0303 61 Rulemaking Spent Fuel Cask Medium N/A NRC- PRM-72-7 N/A N/A N/A N/A N/A N/A Actions Certificate of 2014-Compliance 0067 Format and Content 62 Rulemaking Spent Fuel Medium 3150- NRC- N/A N/A 7/26/2021 7/26/2022 10/26/2023 7/26/2023 10/26/2024 Actions Reprocessing6 AJ53 2015-0016 63 Rulemaking Training and Medium N/A NRC- N/A N/A N/A N/A N/A N/A N/A Actions Experience 2020-Requirements for 0035 Unsealed Byproduct Materials 6 NRC staff is reconsidering the need for additional requirements and will be providing a recommendation to the Commission in 2020.

12

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 64 Rulemaking Updates and Medium 3150- NRC- N/A 9/1/2014 N/A N/A N/A 2/28/2021 5/4/2021 Actions Clarifications on AJ45 2014-the Export of 0201 Deuterium 65 Rulemaking Updates and Medium 3150- NRC- N/A 12/12/2018 N/A N/A N/A 10/16/2019 12/31/2020 Actions Clarifications on AK26 2018-the Export of 0294 Nuclear Material 66 Rulemaking Alternatives to Low 3150- NRC- N/A 9/1/2014 N/A 6/30/2021 9/30/2021 6/30/2022 9/30/2022 Actions the Use of Credit AJ92 2017-Ratings 0021 67 Rulemaking Cost Recovery Low N/A NRC- N/A N/A 1/31/2022 1/31/2023 4/30/2023 4/30/2024 8/30/2024 Actions Criteria for 2020-Research and 0071 Development Utilization Facilities 68 Rulemaking Non-Substantive Low 3150- NRC- N/A N/A N/A N/A N/A N/A N/A Actions Amendments to AK46 2020-Adjudicatory 0033 Proceeding Requirements 69 Petition Access to the N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Decommissioning 2019- 119 Trust Fund for 0083 the Disposal of Large Components 70 Petition Alternative N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Method for 2019- 120 Calculating 0180 Embrittlement for Steel Reactor Vessels 13

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 71 Petition Calculated N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Maximum Fuel 2009- 93 Element Cladding 0554 Temperature 72 Petition Calculated N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Maximum Fuel 2009- 95 Element Cladding 0554 Temperature 73 Petition Categorization of N/A N/A NRC- PRM-170- N/A N/A N/A N/A N/A N/A Actions the Licensee Fee 2018- 7 Category for Full- 0172 Cost Recovery 74 Petition Criteria to Return N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Retired Nuclear 2019- 117 Power Reactors 0063 to Operations 75 Petition Determining N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Which 2015- 112 Structures, 0213 Systems, and Components and Functions Are Important to Safety 76 Petition Elimination of N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Immediate 2018- 116 Notification 0201 Requirements for Non-Emergency Events 14

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 77 Petition Erik Erb N/A N/A NRC- PRM-26-6 N/A N/A N/A N/A N/A N/A Actions Minimum Day 2010-Off Requirement 0310 for Security Officers 78 Petition Fire Protection N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Compensatory 2017- 115 Measures 0132 79 Petition Linear No- N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Threshold Model 2015- 28 and Standards 0057 for Protection against Radiation 80 Petition Linear No- N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Threshold Model 2015- 29 and Standards 0057 for Protection against Radiation 81 Petition Linear No- N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Threshold Model 2015- 30 and Standards 0057 for Protection against Radiation 82 Petition Measurement N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions and Control of 2011- 103 Combustible Gas 0189 Generation and Dispersal 83 Petition Measurement N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Standards Used 2019- 118 at U.S. Nuclear 0071 Power Plants 15

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 84 Petition Naturally- N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Occurring and 2017- 66 Accelerator- 0159 Produced Radioactive Materials 85 Petition Nuclear Energy N/A N/A NRC- PRM-26-5 N/A N/A N/A N/A N/A N/A Actions Institute 2010-Fitness-for-Duty 0304 Programs 86 Petition Patient Release N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Criteria for 2020- 21 Radioactive 0037 Iodine 87 Petition Professional N/A N/A NRC- PRM-26-3 N/A N/A N/A N/A N/A N/A Actions Reactor Operator 2009-SocietyFitness- 0482 for-Duty Programs 88 Petition Protection of N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Digital Computer 2014- 18 and 0165 Communication Systems and Networks 89 Petition Risk-Informed N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Categorization 2015- 110 and Treatment of 0028 Structures, Systems, and Components for Nuclear Power Reactors 16

U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 3, 2020)

Item Category Title CPR RIN1 Docket Associated Rulemaking Regulatory Proposed Proposed Final Rule Final

  1. Priority ID PRM Initiation Basis Rule to Rule to Rule Numbers Date Publication Signature Publication Signature Publication Date Authority Date Authority Date 90 Petition Voluntary N/A N/A NRC- PRM N/A N/A N/A N/A N/A N/A Actions Adoption of 2020- 121 Revised Design 0055 Basis Accident Dose Criteria 17