Rev 1 to License Change Application 113,requesting Amend to License NPF-1,revising Tech Specs 3/4.4.1.1 & 3/4.4.1.2 Re Number of Reactor Coolant Loops Operating at Low Power & in Mode 3
ML20138R535
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/27/1985
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20138R530 List:
References
TAC-56567, NUDOCS 8512310351
Download: ML20138R535 (2)


Text

A 4

PORTLAND CENERAL ELECTRIC COMPANY EUGENE WATER & ELECTRIC BOARD AND PACIFIC POWER & LIGHT COMPANY Operating Licenae NPF-1 Docket 50-344 License Change Application 113, Revision 1 This License Change Application requests modifications to Operating License NPF-1 for the Trojan Nuclear Plant to revise Technical Specifications 3/4.4.1.1 and 3/4.4.1.2 with regard to the number of reactor coolant loops to be operating at low power and in MODE 3.

PORTLAND GENERAL ELECTRIC COMPANY By Bart D. Withers Vice President Nuclear Subscribed and sworn to before me this 27th day of December 1985.

4

~~~

DEIi/ J. SIM!CH Nota g fublic of Oregon NOTAR'i PUDLIC -OREGON vi co=nqm ev=.itN-ff...

g,gj,g P

4 S

T LCA 113. Rev. 1 Page 1 of 1 DESCRIPTION OF CHANGE Trojan Technical Specification (TTS) 3.4.1.1 is modified to require four reactor coolant loops in operation when the Plant is operating below the P-7 setpoint. TTS 3.4.1.2 is revised to require:

(1) With any control rod drive mechanism (CRDM) onergized all four

' reactor coolant loops shall be in operation.

(2) With no CRDMs energized, at least two reactor coolant loops shall be OPERABLE with one reactor coolant loop in operation.

A new Serveillance Requirement is added to TTS 4.4.1.2 to require verification that all CRDMs are de-energized every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> if less than four loops are in operation. TTS Bases 3/4.4.1 is revised to give the reason for requiring four loops in operation.

~

Additional editorial changes are made to incorporate this revision into the TTS. The proposed revision is shown in Attachment 1.

REASON FOR CHANGE TTS 3.4.1.1 requires that two reactor coolant loops be in operation when the Plant is operating below the P-7 setpoint (MODES 1 and 2).

In addition, TTS 3.4.1.2 requires tsat two reactor coolant loops be OPERABLE, with one loop actually in operation (MODE 3).

However, the bank withdrawal from suberitical and low power accident analyses assume four loopo in operation. This change ensures consisterey between the TTS and the' accident analyses.

SIGNIFICANT HAZARDS CONSIDERATION DET m INATION This change does not:

(1) increase the probability or consequences of an accident previously evaluated, (2) create a new or different kind of accident, or (3) significantly reduce a margin of safety since this change constitutes an additional limitation not presently included in the TTS.' By requiring all four reactor coolant loops operating in MODE 3 whenever the CRDMs are energized. Plant operation will be consistent with the accident analysis. Based on the, above, this change does not pose a significant hasard.

8AFETY/ ENVIRONMENTAL EVALUATION Safety and environmental evaluations were performed as required by 10 CFR 50 and the TTs. This review determined that the proposed changes do not create an unreviewed safety question.