Forwards Insp Rept 50-414/85-61 on 851202-06.No Violations or Deviations Noted
ML20138R532
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 12/24/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20138R534 List:
References
NUDOCS 8512310349
Download: ML20138R532 (1)


See also: IR 05000414/1985061

Text

o

. -

DEC 2 41985

Dyke Power Company

%TTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NO. 50-414/85-61

On December 2-6, 1985, NRC inspected activities authorized by NRC Construction

Permit No.' CPPR-117 for your Catawba facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by

H. C. Dance)/for

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

'

Enclosure:

Inspection Report No. 50-414/85-61

cc w/ encl:

LR. L. Dick, Vice President - Construction

W . W. Hampton, Station Manager

bec w/ encl:

v'k. N. Jabbour, NRR

~

-

vNRC Resident Inspector ggg23gD0g gg0ggjl4 ,

Document Control Desk

State of South Carolina

o PDR j

RII _ RII RI RII ( / RII

y'8He

LJackson:bhg

XFFx

RWright GBeli e

GJ

CJuTfan

IV

HDaf(ce

12h3/85 12b>/85 12/,23/85 12/23/85 12/g/85 . g

c x2Ol