ML20138R532
| ML20138R532 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/24/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20138R534 | List: |
| References | |
| NUDOCS 8512310349 | |
| Download: ML20138R532 (1) | |
See also: IR 05000414/1985061
Text
o
.
-
DEC 2 41985
Dyke Power Company
%TTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: REPORT NO. 50-414/85-61
On December 2-6, 1985, NRC inspected activities authorized by NRC Construction
Permit No.' CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by
H. C. Dance)/for
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
'
Enclosure:
Inspection Report No. 50-414/85-61
cc w/ encl:
LR. L. Dick, Vice President - Construction
W . W. Hampton, Station Manager
bec w/ encl:
v'k. N. Jabbour, NRR
-
vNRC Resident Inspector
ggg23gD0g gg0ggjl4
~
,
Document Control Desk
o
j
State of South Carolina
RII _
RII
RI
RII ( /
RII
y'8He
XFFx
GJ
IV
LJackson:bhg
RWright
GBeli
e
CJuTfan
HDaf(ce
12h3/85
12b>/85
12/,23/85
12/23/85
12/g/85
.
g
x2Ol
c