Forwards SER Accepting Util Responses to Generic Ltr 83-28, Items 3.1.3 & 3.2.3 Re post-maint Testing.Response to Encl Request for Addl Info Requested within 30 Days of Receipt of Ltr
ML20138Q702
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 12/06/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: Richard J
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20138Q704 List:
References
GL-83-28, NUDOCS 8512270398
Download: ML20138Q702 (6)


Text

_. m. . _ _ _ _ _

e p up 8 UNITED STATES

[ g NUCLEAR REGULATORY COMMISSION

  • % > ree E WASHINGTON, D. C. 20555 4 's, ,e DEC 6 1985 Locket hos: 50-416/4D 1

Mr. Jackson B. Richard Senior Vice President, Nuclear Mississippi Power and Light Company P.O. Box 23054 Jackson, Mississippi 39205

Dear Mr. Richard:

SUBJECT:

GRAND GULF NUCLEAR STATION, UNITS 1 AND 2 - SALEM ATWS EVENTS, GENERIC LETTER C3-28 PGSITIONS 3.1 AND 3.2, REGAPDIf;G POST-MAINTENANCE TESTING Generic Letter 83-28 (GL 83-28) requested licensees of operatir.g reactors, applicants fer cperating licenses and holders of construction permits to respond to certain positions resulting fron staff's review of the anticipated transient without scram (ATWS) events at the Salem Nuclear

, Plant. By letters dated hovember 4, 1983, December 14, 1984, January 16, 1985, and September 30, 1985, Mississippi Power and Light Company provided, among other things, responses to GL 83-28 Iten 3.1 " Post-Paintenance Testing i (P.eactor Trip System Compenerts), and Item 3.2 " Post-Maintenance Testing (All Other Safety Related Components)."

The f.RR staff has completed its revio: cf these submittals. The staff concludes that the responses to Items 3.1.1, 3.1.2, 3.2.1 and 3.2.2 are inconplete. Enclosure 1 provides staff's request for additional ir. formation for Grand Gulf Unit 1: The staff turther concludes that the responses to Items 3.1.3 ano 3.2.3 are acceptable for Grand Gulf Units 1 and 2. Enclosure 2 provides staff's safety evaluation for Items 3.1.3 and 3.2.3 including the evaluation of Iten 3.1.3 for Unit I which was previcusly transmitted by letter dated August 14, 1985.

In order to meet the scheduled date for completion of our review, you are requested to provide the additional infonnation identified in Enclosure 1 within 30 days of the receipt of this letter. If you cannot meet this date, please advise the NRC Project Manager, L. L. Kintner, within 7 days of receipt of this letter.

8512270398 851206 PDR ADOCK 05000416 P PDR

l l _y_

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OttB clearance is not required under P.L.96-511. ,

Sincerely,

(),h y hv L Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See nen page

F , .

The reporting and/or recordkeeping requirements ccntained in this letter affect fewer than ten respondents; therefore, OflB clearance is not required under P.L.96-511.

Sincerely, Original Signed by Walter R. Butler, Director BKR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION

Docket File, hRC PDR Local PDR BHRFDf4 Reading 1 OELD l EJordan BGrines JPartlow LKintner ACRS(10)

BWRPD&4 BURPD#3 BWRPD#4 yd ')>

  • LKintner:dh *ltDuncan WRButler 11/27/85 12/02/85 12/.F/E5

Mr. Jackson B. Richard Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child. Steen and Caraway Attorney General

.P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Libennan, Cook, Purcell Mr. Oliver D. Kingsley, Jr.

s and Reynolds Vice President, Nuclear Operations 1200 17th Street, N.W. Mississippi Power & Light Company Washington, D. C. 20036 P.O. Box 23054 Jackson, Mississippi 39205 Mr. Ralph T. Lally

! Manager of Quality Assurance Office of the Governor l Middle South Services, Inc. State cf Mississippi i P.O. Box 61000 Jackson, Mississippi 39201 New Orleans, Louisiana 70161 Attorney General Mr. Larry F. Dale, Director Gartin Building Nuclear Licensing and Safety Jackson, Mississippi 39205 Mississippi Power & Light Company P.O. Box 23054 Mr. Jack McMillan, Director Jackson, Mississippi 39205 Solid Waste Mississippi State Board of Health Mr. R. W. Jackson, Project Engineer 880 Lakeland Bechtel Power Corporation Jackson, Mississippi 39?06 15740 Shady Grove Road Gaithersburg, Maryland 20760 Alton B. Cobb, M.D.

State Health Officer Mr. Ross C. Butcher State Board of Health Senior Resident Inspector P.O. Box 1700 U.S. Nuclear Regulatory Commission Jackson, Mississippi 39205 Route 2, Box 399 Port Gibson, Mississippi 39150 President Claiborne Ccunty Board of Supervisors Regional Administrator, Region II Port Gibson, Mississippi 39150 U.S. Nuclear Regulatory Co.. mission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 4

Mr. J. E. Cross, General Manager Grand Galf Nuclear Station Mississippi Power & Light Company P.O. Box 756 1 Port Gibson, Mississippi 39150

ENCLOSURE 1 REQUEST FOR ADDITIONAL INFORMATION GRAND GULF UNIT 1 Item 3.1.1 - Incomplete 4 The licensee needs to provide a statement confirming that test and maintenance procedures and Technical Specifications have been reviewed for safety-related components in the reactor trip system (RTS) to assure that post-maintenance testing is specified in the procedures and that the testing will verify component capability to perform its intended safety functions prior to being returned to service. Your response to Item 3.1.1 states that the Grand Gulf Nuclear Station's (GGNS) Operations Manual includes Administrative Procedure 01-S-07-2,

" Test and Retest Control," which establishes the controls that are applied to testing, retesting, inspection, and special tests that are performed to verify operability of permanent plant equipment, once activities which removed the equipment from service are completed. You also stated that this procedure was recently revised by MP&L and incorporates many of the concerns addressed in the Salem kestart Evaluation, SECY 83-98E. However, you did not state that a review was made of the actual working level maintenance and test procedures to assure that post-maintenance testing is required to be conducted and that the testing specified in the procedures demonstrates that the equipment is capable of performing its intended safety functions prior to being returned to service. We request that you submit a statement confirming that this action has been completed or submit a schedule for when this review will be completed.

Item 3.1.2 - Incomplete The licensee needs to provide a statement confirming their review of vendor and engineering recommendations for safety-related components in the RTS to ensure that appropriate test guidance is included in the test and maintenance procedures or the Technical Specifications. In your response dated December 14, 1984, you stated that Procedure 01-S-07-2 contains a table which lists Technical Specifica-tions with post-maintenance testing requirements and references applicable operability tests to be performed after maintenance. You also stated that all maintenance procedures have been written to and are controlled by Procedure 07-5-01-2, " Maintenance Section Directive Author's Guide," which provides uniform guidelines for preparation of maintenance procedures. You further stated that these guidelines require the inclusion of applicable prerequisites and precautions, required material (i.e., vendor manuals or instructions), and operability requirements in each maintenance / testing procedure. However, you did not definitely state that a review was performed of those test and maintenance procedures to verify that appropriate vendor and engineering recommendations had been incorporated. We request that you submit a statement confirming that this review has been completed in accordance with Action Item 3.1.2 or submit a schedule for completing this review.

~

Enclosure 2 Item 3.2.1 - Incomplete i

The licensee needs to provide a statement confirming their review of test and maintenance procedures and Technical Specifications for all safety-related components, other than the RTS components, to assure that post-maintenace testing

'l is specified in the procedures and that the specified testing will verify component capability to perfom its intended safety functions prior to being returned to service. In your response dated September 30, 1985, you stated that Grand Gulf Nuclear Station Administrative Procedure 01-5-07-2, " Test and Retest

! Control " establishes the controls that are applied to testing, retesting, inspection, and special tests that are performed to verify the operability of permanent plant equipment, once activities which removed the equipment from service are completed. You also stated that this procedure incorporated many of the concerns addressed in the Salem Restart Evaluation, SECY 83-98E. However, 3

you did not definitely state that a review was perfomed on your maintenance and test procedures to assure that post-maintenance testing is required to be a conducted and that the testing demonstrates that the equipment is capable of 1 performing its intended safety functions prior to being returned to service. We 4

request that you submit a statement confirming that this action has been completed or submit a schedule for completing this review.

Item 3.2.2 - Incomplete i The licensee needs to provide a statement confirming their review of vendor and

! engineering recomendations for all safety-related components, other than the RTS l components, to ensure that appropriate test guidance is included in the test and i maintenance procedures or the Technical Specifications. In your response dated September 30, 1985, you stated that Procedure 01-5-07-2 contained a table which

, lists Technical Specifications with post-maintenance testing reouirements and

referenced applicable operability tests to be performed after maintenance. You also stated that maintenance procedures have been written to and are controlled by Procedure 07-5-01-1, " Maintenance Section Directive Author's Guide," which
provides unifom guidelines for preparation of maintenance procedures. You i

further stated that these guidelines require the inclusion of applicable prerequisites and precautions, required material (i.e., vendor manuals or i instructions), and operability requirements in each maintenance / testing procedure. However, you did not definitely state that a review was perfomed of

' those test and maintenance procedures to verify that appropriate vendor and engineering recomendations had been incorporated. If this review was perfomed, i we request that you submit a statement confirming that this review has been l completed. If not, we request that you submit a schedule for when this review l

will be completed.