Proposed Tech Specs,Authorizing Extensions of Allowable Intervals for Conducting Certain Type C Leak Rates Tests & Testing Certain Reactor Instrumentation Line Check Valves
ML20138M835
Person / Time
Site: Limerick Constellation icon.png
Issue date: 12/18/1985
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20138M812 List:
References
NUDOCS 8512230180
Download: ML20138M835 (4)


Text

.

j CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) i d.

Type B and C tests shall be conduc ed with gas at P,, 44.0 psig*,

{

at intervals no greater than 24 montht*except for tests involving:

I 1.

Air locks, 2.

Main steam line isolation valves, 3.

Containment isolation valves in hydrostatically tested lines which penetrate the primary containment, and e.

Air locks shall be tested and demonstrated OPERA 8LE per Surveillance Requirement 4.6.1.3.

l f.

' Main steam line isolation valves shall be leak tested at least once per 18 months.

g.

Containment isolation valves in hydrostatically tested lines which penetrate the primary containment shall be leak tested at least once.

l per 18 months. **

l h.

The provisions of Specification 4.0.2 are not appifcable to Specifica-tions 4.6.1.2a., 4.6.1.2b., 4.6.1.2c., 4.6.1.2d., and 4.6.1.2e.

i i

l l

f

  • Unless a hydrostatic test is required per Table 3.6.3-1.
    • A Type C test interval extension to May 26, 1986 is permissible for primary containment isolation valves listed in Table 3.6.3-1, Part A, which are identified in Application for Amendment of Facility i

Operating License dated December 18, 1985 that need a plant outage to test.

I B512230100 051218 PDR ADOCK 05000352 p

PDR 1

LIMERICK - UNIT,1 3/4 6-4 r

--_...,_,,,.,--y,_,,-,--,re._m

,m-,c,-ws,.-.

,,,y%.-

---m

,,,--y-,-sm-r---,-,_-w%-,-.,

JurDOMINT Page 1 of 3 r

e Samary of Valves For Mich A Change is Regoested LIR # Penetration Descripticn Valve i Test Medium Extention Restrictions Wir J Duraticn Erspticn Requested Required 131 X-13A A S/b Cmling Return W-51-11050A*

Water 9 weeks 5 days Qntairunent No W-51-151A*

hter 9 weeks 5 days

Entry, No 141 X-13B BS/DCmlingReturn W 1105(B*

Water 9 weeks 5 days No W-51-151B*

hter 9 weeks 5 days No 451 X-45A A IECI Injecticn N-51-11041A*

hter 9 weeks 5 days Omtainment No W-51-142A*

hter 9 weeks 5 days Entry, RX No W-51-IIOl7A*

Air 9 weeks 5 days Depressuriza-Yes tim 471 X-45C C IPCI Injecticn W-51-11041C*

hter 9 weeks 4 days 0:ntainment W-51-142C*

hter 9 weeks,4 days Entry, RX a

W-51-11017C*

Air 9 weeks 4 days Depressuriza-ticn Yes

~

481 X-45D D IPCI Injecticn W-51-IIO41D*

hter 9 weeks 4 days Ctntairunent W-51-142D*

mter 9 weeks 4 days Entry, RX W-51-11017D*

Air 9 weeks 4 days Depressuriza-yg tien (351 X-205A SJppressicn Pool W-51-lIO27A*

Air 8 weeks 1 day Omtairunent S ray Entry

.Yes I

  • Bpipped with thuxx;h leakage de6<+4m system.

9 9

JEEBogeur Page 3 ef 3 r

e asemary Of Valves 7br Which A. dunge is Requestad 1

(Om*i==d)

UR$ INmetMien Description Valve $

Test Medita Estartica Restricticms Agipedix J Dtration Esemption Regassted VM 521 3H!i6 EDF Return W-87-121B Air 11 weeks 2 days Omtmirem*

Yes W-87-123 Air 11 weeks 2 days Ehtry, IX3t Yes

^

W-47-124B Air 11 weeks 2 days Drained, All Yes

~

Dbt W 1imy Off 151 X-14 NCU Supply W-44-13001 Air 9 weeks 3 days Omtairusert

, Yes, W-44-11004 Air 9 weeks 3 days Ehtry, Bo Yis

  • IOCU, RK Yes.

Degressuriand Yes 532 X-61B

'B' Racire 43-1004B Air 3 weeks Omtairmert Yes Seel Purge Ehtry, 'B' Recire Off G21 X-3D

~ Instr. Gas W-59-151B Air 1 week 4 days Omtairunert Yes a ply 59-n12 Air 1 week 4 days Entry Yes s

9 E

o

=

g

  1. w O

-.,----,-+v-,

-, - - - - - - - -. + -

M

, hga 2 of 3

~

asemary Of Valves NbrMdch A W

- is maguested

(

i (Ctatinued)

IIR # Penetration W pti m Valve #

2est Medium httertion Restrictims W wJ Duratim ww==nrd-4,=

Reganstad M ved 201 X-23 IEOf Supply W-13-106 Air 11 weeks 5 days Otntairunerit Yes W-13-108 Air 11 weeks 5 days Entr?; Rec: ire.

Yes.

W-13-109 Air 11 weeks 5 days Pumps Off:-

Yes EEOf drained; Ilset &ained (1 locp);

no secu 211 X-24 3 eof Return W-13-107 Air 12 weeks Yes W-13-110 Air 12 weeks Yes W-13-111 Air 12 weeks Yes 491 X-53 IDF Sugply W47-120A Air 12 weeks Omtairseent Yes W47-125A Air 12 weeks Entry, DOf Yes W47-128 Air 12 weeks

&ained, All Yes DAt 03 cling 4

Off 501 X-54 IDt Return W47-121A Air 11 weeks 5 days Yes W47-124A Air 11 weeks 5 days

.Yes IBMI7-129 Air 11 weeks 5 days Yes 511 X-55 ids Supply W47-12GB Air 6 weeks 1 day Yes W47-122 Air 6 weeks 1 day Yes W47-125B Air 6 weeks 1 day Yes r.

e

-O

.m

- - - ---- --