ML20138M673

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/85-32 & 50-323/85-29 on 850818-0928 & Notice of Violation
ML20138M673
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/16/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20138M679 List:
References
NUDOCS 8511040213
Download: ML20138M673 (2)


See also: IR 05000275/1985032

Text

-

.

OCT 161985

Docket Nos. 50-275 and 50-323

Pacific Gas and Electric Company

77 Beale Street, Room 1451

San Francisco, California 94106

Attention: Mr. J. D. Shiffer, Vice President

Nuclear Power Generation

Gentlemen:

Subject: NRC Inspection of Diablo Canyon Units 1 and 2

This refers to the a routine inspection, conducted by Messrs. M. M. Mendonca,

M. L. Padovan, T. M. Ross, and T. J. Palich, of this office during the period

of August 18, through September 28, 1f,85. This inspection examined your

activities as authorized by hTC License Nos. DPR-80 and DPR-82. Discussions

of our findings were held with Mr. R. C. Thornberry, and other members of your

staff, at the conclusion of the inspection.

Areas examined during this inspecti;n are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A. Your

response to this notice is to be submitted in accordance with the provisions

of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room

The responses directed by this letter are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PI 96-511.

8511040213 851016

PDR ADOCK 05000275

i G PDR

$I j

_

.

Pacific Gas and Electric Company -2- OCT 161985

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

Originci signed by

D. F, Kirsch

D. F. Kirsch, Acting Director

Division of Reactor Safety

and Projects

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-275/85-32 and 50-323/85-29

cc w/ enclosure:

S. D. Ski % re_, POLE

P. A. Crane, Jr., PG&E

R. J. Thornberry, PG&E (Diablo Canyon)

D. A. Taggert, PG&E (Diablo Canyon)

R. S. Weinberg, PG&E (Diablo Canyon)

State of CA

Sandra Silver (Report Only)

bec:

RSB/ Document Control Desk (RIDS)

Mr. J. Martin

Mr. B. Faulkenberry

G. Cook

Resident Inspector

l

RV h b

MMendonca:dh MPadovan TRoss TPolich RDo3ds AJohn on DKirsch

10/ '/ /85 10/ 7 /85 10/ 7 /85 10/ 7 /85 10 f /85 10/7/85 10/ /85

, A

CUY

aqu