ML20138M525
| ML20138M525 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/17/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML20138M530 | List: |
| References | |
| NUDOCS 8511040079 | |
| Download: ML20138M525 (2) | |
See also: IR 05000529/1985029
Text
. - _ _ _
__
_ -
. _ . - - _ _ _ _ _ _ _ _ .
._._
_
p* *Ecg'o,
'
UNITED STATES
,
E'
- h
NUCLEAR REGULATORY COMMISSION
e
j
$
"
'j
REGION V
,
,
3,
%
,o'g
1450 MARIA LANE.SulTE 210
WALNUT CREEK. CALIFORNIA 94596
Docket Nos. 50-529, 50-530
OCT 171985
Arizona Nuclear Power Project
P. O. Box 52034
Phoenix, Arizona 85072-2034
Attention:
Mr. E. E. Van Brunt , Jr.
Executive Vice President
Gentlemen:
!
Subject: NRC Inspection of Palo Verde Units 2 and 3
This refers to the inspection conducted by Messrs. W. G. Albert, C. A. Clark
and P. P. Narbut of this office on September 23-27, 1985, of activities
authorized by NRC Construction Permit Nos. CPPR-142 and 143 and to the
discussion of our findings held with members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
No violations of NRC requirements were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
'
discuss them with you.
Sincerely,
.b
D. F. Kirsch, Acting Director
Division of Reactor Safety and Projects
Enclosure:
Inspection Report Nos. 50-529/85-29,50-530/85-23
cc w/ enclosure:
i
l
J. Bynum, ANPP
S. R. Frost, ANPP
'
!
T. D. Shriver, ANPP
W. E. Ide, ANPP
C. N. Russo, ANPP
Ms. Jill Morrison, PVIF
Lynne Bernabei, GAP
Duke Railsback, ACC
Arthur C. Gehr, Esq., Snell & Wilmer
g!A2188UBis80R'
g-o
.
.
- - -
- - -
,
. - - _
- - - - . -
_.-
.
.
Arizona Nuclear Power Project
-2-
7 1985
bec:
RSB/ Document Control Desk (RIDS)
Mr. J. Martin
Mr. B. Faulkenberry
G. Cook
Resident Inspector
RV M
(Cd
k
k
WAlbert:dh
CClark
PNarbut
TYoung
L i ler
RPa e
DKirsth
10//O /85
10/f/85
10/6/85
10/g/85 10/ ///85
10//p85
10//[/85
Il