OPERATING DATA REPORT 4
i DOCKET NO.
50-369 j
DATE 12/13/85 j
COMPLETED BY T3-naavis
- TELEPHONE 704-373-7567 OPERATING STATUS 4
Notes
- Nameplate Rating I. Unit Name:
McGuire 1
.2. Reporting Period:
hvamhor 1,
1on5_ November 30. 1985 (Gross MWe) calculated as 1450.000 MVA x.90 power 3411
- 3. Licensed Thermal Power (MWt):
factor per Page lii, 1305*
- 4. Nameplate Rating (Gross MWe):
1180
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
11RO 4
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
' This Month Yr to Date Cumulative
- 11. Hours In Reporting Period 720.0 8 016.0 35 064.0
- 12. Number Of Hours Reactor Was Critical 491.3 6 114.8 24 278.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 487.2 6 025.4 23 987.9
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 540 353 18 136 826 64 941 126
, 17. Gross Electrical Energy Generated (MWH) 534 915 6 234 847 22 464 072
- 18. Net Electrical Energy Generated (MWH) 507 167 5 961 417 21 336 672
[
- 19. Unit Service Factor 67.7 75.2 68.4
- 20. Unit Availability Factor 67.7 75.2 68.4
- 21. Unit Capacity Factor (Using MDC Net) 59.7-63.0 51.6
- 22. Unit Capacity Factor (Using DER Net) 59.7 63.0 51.6-
- 23. Unit Forced Outage Rate 32.3 9.8 14.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
None
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
h #A0o8d !!ffjgg -
I k (9/77)
PDR l
c l
\\
.L
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-369 UNIT McGuire 1 DATE 12/13/85-COMPLETED BY J.A.
Reavis TELEPHONE 704-373-7567 MONTH November, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(HWe-Ne t) 1 1 148 17 1 153 2
293 18 1 152 3
19 743 4
20 671 5
21 1 145 6
22 1 148 7
23 1 149 8
24 1 is2 9
25 1 153 10 26 1 153 11 90 27 1 154 12 214 28 1 153 13 938 29 1 153 14 1 152 30 i i si 15 1 154 31 16 1 153 INSTRUCTIONS
.On this format, list the average daily unit power level in HWe-Net for each day in'the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-369 UNIT NAME Mccuire 1 DATE 12/13/85 REPORT MONTH November 1985 COMPLETED BY J. A.
Reavin "s_
_ _ _. _ _..__.._ _ TELEPHONE 704_373_7ss7 O
O o,$
License Cause & Corrective y
c87 "c
v55 8
Event h
g No.
Date
'a,
%h 8
Action to jg!
S 5E E
%5 RB 8B i
H o~
a:
- c m o Report #
Prevent Recurrence mo uo 5
85-11-02 F
5.30 A
3 PA PIPEXX Instrument air failure caused feedwater reg valve to close 6
85-11-02 F
214.57 A
4 CH VALVEX Repair body leak on feedwater check valve (CF-25) 37-p 85-11-11 F
F XX XXXXXX Hold for Secondary Chemistry 38-p 85-11-11 F
A XX HTEXCH High lower containment temperature due to two inoperable ventilation units 39-p 85-11-12 F
A CH PIPEXX Change out control oil drain piping 40-p 85-11-13 F
B IB INSTRU Nuclear instrumentation calibration 7
85-11-19 F
12.97 A
3 CH INSTRU A fuse failure in speed control circuit caused feedwater pump trip on overspeed 41-p 85-11-20 F
F XX xxxxxx Hold for Secondary Chemistry 1-1 2
3 4
Reason:
Method:
Exhibit G - Instructions S
led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 4 License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain)
-9/77)
a
' I t
Docket No.: 50-369 Unit: McGuire 1 Date: 12/13/85 NARRATIVE
SUMMARY
Month: November, 1985 McGuire Unit 1 began the month at 100%. The unit tripped on 11/02 when Instrument Air was lost. The unit remained off line until 11/11 to repair a feedwater check valve. The unit returned to service on 11/14 and escalated to 100%. On 11/19 a fuse failure caused the unit to trip. It returned to service on 11/20 and operated for the balance of the month at 100%.
i i:
l l
r i
-.s.
m
---,m-r.
n m
e---
Docket No.: 50-370 i
i Unit: McGuire 2 Date: 12/13/85 NARRATIVE
SUMMARY
I
~ Month: November, 1985 l
4 McGuire Unit 2 began the month at 100%. The unit tripped on 11/02 when Instrument Air was lost. The unit returned to service on 11/03, and operated at 1
100% for the balance of the month.
1 i
j 4
f i
t i
1
_ _.._,.-,.._ ~_ --,_.
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown: June, 1986 3.
Scheduled restart following refueling: September, 1986 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: December 13, 1985 Name of
Contact:
J. A.
Reavis Phone:
704-373-7567 4
OPERATLNG DATA REPORT DOCKET NO.
50-370 DATE 12/13/85 COhlPLETED BY J.A. Reavis TELEPHONE 7nd 173-7567 OPERATING STATUS 4
'* Nameplate Rating Notes
- 1. Unit Name:
Meanire 2 (Gr as MWe) calculated as
- 2. Reporting Period:
Novamher 1. 1985-Novamber 30. 1985
- 3. Licensed Thermal Power (51Wt):
3411 1450.000 MVA x.90 power f
r r Page lii,
- 4. Nameplate Rating (Gross alWe):
1305*
1180
- 5. Design Electrical Rating (Net blWe):
i
- 6. blaximum Dependable Capacity (Gross SIWE):
1180
- 7. blaximum Dependable Capacity (Net SlWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net blWe):
- 10. Reasons For Restrictions,if Any:
This hionth Yr. to Date Cumulative I1. Hours in Reporting Period 720.0 8 016.0 15 360.0
- 12. Number Of Houn Reactor Was Critical 703.6 5 066.5 11 204.6
- 13. Reactor Reserve Shutdown Hours f
I4. Hours Generator On-Line 702.0 4 752,2 10 843.2
- 15. Unit Resene Shutdown Hours I
- 16. Gross Thermal Energy Generated (>lWH) 2 366 518 15 451 463 34 822 134
.17. Gross Electrical Energy Generated (>lWH) 832 623 5 388 318 12 226 041
- 18. Net Electrical Energy Generated (SiWH) 802 362 5 144 419 11 702 219
- 19. Unit Service Factor 97.5 59.3 70.6 I
- 20. Unit Availability Factor 97.5 59.3 70.6~
- 21. Unit Capacity Factor (Using AIDC Net) 94.4 54.4 64.6
- 22. Unit Capacity Factor (Using DER Net) 94.4 54.4 64.6
- 23. Unit Forced Outage Rate 2.5 27.0 21.2
- 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Each):
n,fuelino - March 21. 1986 - 8 weeks I
i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COSINIERCIAL OPERATION
}
i 1
(9/77)
I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-370 UNIT McGuire 2 i
DATE 12/13/85 COMPLETED BY J.A.
Reavis i
TELEPHONE 704-373-7567 s
i.
MONTH November. 1985 DAY-AVERAGE DAILY POWER' LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t) k 1
1 154' 17
-1 160 i
2 ~
297 18 1 160 3
670 19 1 160 1
4 1 160
.20 1 159 5
1 149 21 1 158 f
6 1 159 22 1 155' i
7 1 160 23 1 156 8
1 161 24 1 157 9
1 161 25 1 158 i
10 1 162 26 1 156 i
11 1 159 27 1 161 l
12 1 159-28 1 167 13.
1 161 29 1 166 14 1 160 30 1 166 i
15-1 160 3
4
?-
16 1 160 h
j '
On this format, list the average daily unit power level in HWe-Net for each day INSTRUCTIONS j
in the reporting month.
Compute to' the nearest whole megawatt.-
UNIT SHUTD0lMS AND POWER REDUCTIONS
-DOCKET NO. 50-370-UNIT NAME McGuire 2 DATE 12/1 /85 3
REPORT PONTH November, 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7s67-LO oj License y
Cause & Corrective e87 "c
v52 g
No.
Date
~.
gg j3 Event je, p
Action to o
h Report #
hu
$u Prevent Recurrence o
20 85-11-02 F
17.97 A
3 XX PIPEXX Instrument air hose failure caused feedwater reg valves to close 35-P 85-11-03 F
-F XX XXXXXX Hold for Secondary Chemistry
'36-P 85-11-05 F
A HA TURBIN Turbine control problems t
.i
-1 2
3 4
Reason:
Method:
Exhibit G - Instructions
[N A-Equipnent Failure (Explain) 1-Manual for Preparation of Data g
B-hintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training 6 License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain) 9/77)
MONTHLY REFUELING INFORMATICN REQUEST 1.
Facility name: McGuire, Unit 2 2.
Scheduled next refueling shutdown: March, 1986 3.
Scheduled restart following refueling: May, 1986 4.
Will refueling or resumption of operation thereaft.er require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 7j!,
8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: December 13, 1985 Name of
Contact:
J. A.
Reavis Phone:
704-373-7567
McGUIRE NUCLEAR STATION Monthly Operating Status Report 1.
Personnel Exposure For the month of October, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release for October has been compared with the Technical Specifications maximum annual dose commitment and was
-less than 10 percent of-this limit.
The total station gaseous release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
DUKE POWER GOMPAhT P.O. ISOX 33180 CHAMLOTn' N.C. 28242 y
HALB. TUCKER Trn.ErnoxE (704) 073-4fMM TIOR PREStDENT
.m...
December 13, 1985 Director Office of Inspection and Enforcement I
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Document Control Desk Re:
McGuire Nuclear Station Docket No. 50-369 and 50-370
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of November, 1985.
Very truly yours, MMe Hal B. Tucker JAR: sib Attachment cc:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region-II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Phil Ross U. S. Nuclear Regulatory Commission MNBB-5715 Washington, D. C.
20555 American Nuclear Insurers
-c/o Dottie Sherman, ANI Library The Exchange,-Suite 245 270 Farmington Avenue Farmington, CT 06032 XG L+
'Is
Director December 13, 1985 Page Two cc:
INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 l