OPERATINSDATAREPORT DOCKET NO 50-369 DATE February 14. 1997 OPERATING STATUS COMPLETEDBY R.A. Willians TELEPHONE 704-382-5346
- 1. Unit Nase: McGuire 1
- 2. Reporting Period: January 1, 1997-January 31,1997
- 3. Licensed Thereal Poner (MWt):
3411
- 4. Naseplate Rating (Gross MWe):
1305:
Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWe):
1180 (Gross MWe) calculated as
- 6. Matisus Dependable Capacity (6 toss MWe):
1171 1450.000 MVA :.90 power
- 7. Marious Dependable Capacity (Net MWe):
1129 factor per Page 111,
- 8. If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, if any:
This Month Yr.-to-Date Cuaulative
- 11. Heurs In Reporting Period 744.0 744.0 132984.0
- 12. N aber Of Hcurs Reactor Was Critical 744.0 744.0 97136.0
- 13. Reactor Reserve Shutdown Hours
- --0-- -
- 14. Hours Generator On-Line 744.0 744.0 96135.5
- 15. Unit Reserve Shutdown Hours
--0--
--0--
- 16. Gross Thersal Energy Generated (MWH) 2428964 2428964 303249026
- 17. 6 toss Electrical Energy Generated (MWH) 842540 842540 104132659
- 18. Net Electrical Energy Generated (MWH) 811344 811344 99537200
- 19. Unit Service factor 100.0 100.0 72.3 20.UnitAvailabilityFactor 100.0 100.0 72.3
- 21. Unit Capacity Factor (Using MDC Net) 96.6 96.6 65.3
- 22. Unit Capacity Factor (Using DER Net) 92.4 92.4 63.4
- 23. Unit Forced Outage Rate 0.0 0.0 12.8
- 24. Shutdoun Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling and Steam Generator Replacement - February 14, 1997 - 100 days
- 25. If Shut Coun At End Of Report Period. Estisated Date of Startup:
- 26. Units la Test Status (Prior to Coseercial Operation):
Forecast Achieved INiilAL CRITICALITY INiilALELECTRICITY COMMERCIAL OPERATION 9702210163 970214 ADOCK0500g9 DR
9 OPERATING DATA REPORT DOCKET p0 50-369 UNIT McGuire !
DATE Fdrcary 14, 1997 COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 MONTH houary,1997 Q,Q AVERASE DAILY POWER LEVEL IE AVERABE DA!LY POWER LEVEL (MWe-Net)
(MWe-Met) 1-1140 17 1143 2
1143 18 1143 3
1143 19 1144 4
1142 20 1144 9
1144 21 1144 6
1142 22 1145 7
1140 23 485 8
1139 24 313 9
1140 25 1031 10
!!42 26 1143 11 1141 27 1142 12 1140 28 1141 13 1140 29 1141 14
!!41 30 1142 1142 31 1143 16 1143
.....-..... ~.
...... _ -.. - ~.
UNIT SHUTDOWNS AWD POWER REDUCTIONS DOCKET NO.
50-369 UBIT NAME mwuine, 1 DATE. uz/14/yi REPORT MONTH January 1997 COMPLETED BY x.
A.
m1111ams TELEPHONE t / v s 1 s es z - d.s e d (1)
(2)
(3)
(4)
(5)
R MET-E-
HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 1-P 97-1-23 F
A SD VALVEX STEAM GENERATOR "D"
FEEDWATER CONTAINMENT ISOLATION VALVE HYDRAULIC LEAK 2-P 97-1-23 F
A SD VALVEX STEAM GENERATOR "D"
FEEDWATER CONTAINMENT ISOLATION VALVE HYDRAULIC LEAK REPAIR (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram (LER Event Report (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-@erator Training & License Examination F-Administrative (5) i (Explain) (Explain)
Exhibit I - Same Source i
G-Operator Error H-Other i
6 I
t i
_ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _. _.-_.._. _. _ _ _ _ ~ __ __.. _ _. _ _ _ _ _ _ _ _.. _ _. _ -,. -.... _ _ _ _ - - - - ~ _.. _ _ _ _ -.. ~. _.... _... _ _.. _ _..
i DOCKET: 50-369 UNIT: McGuire I i
Date:
02/14/97
)
i NARRATIVE
SUMMARY
P MONTil: January,1996 McGuire Unit I began the month of January operating at 100% full power. The unit operated at or near 100% full power until 01/23/97 at 0533 when the unit began decreasing power and held at 22% power from 0848 to 1553 due to steam generator "D" feedwater containment isolation valve hydraulic leak. The unit began increasing power on 01/23/97 at 1553 and held at 28% power from 01/23/97 at 1730 to 01/24/97 at 1650 due to steam generator "D" feedwater containment isolation valve hydraulic leak repair.
The unit returned to 100% full power on 01/25/97 at 1410 and operated at or near 100% full power the remainder of the month.
h r
i i
Prepared by: R. A. Williams Telephone:(704)- 382-5346 1
l l
}
MONTliLY REFUELING INFORMATION REOUEST j
i f
1.
Facility name:
McGuire. Unit 1 l
t 2.
Scheduled next refueling shutdown: February 1997 t
3.
' Scheduled restart following refueling: May 1997 TiiE PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i
ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4 l
TliROUGli 6 WILL NO LONGER BE MAINTAINED IN TlilS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Ceimmittee regarding unreviewed safety questions?
j 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l t
6.
Important licensing considerations (new or different design or supplier, unreviewed design or perfonnance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 l
(b) in the spent fuel pool: 2D 8.
Present licensed fuel pool capacity: 1463 i
Size of requested or planned increase: =
l 9.
Projected date oflast refueling which can be accommodated by present license capacity: March 2006 "
- DUKE POWER COMPANY DATE: February 14.1997 l
l Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 i
l I
s
~
.. m
I
' OPERATING DATA REPORT DOCKET WO 50-370 DATE February 14. 1997
. EGAi!N6 STATUS CONPLETED BY R.A. Williams TELEPHONE 704-382-5346-
't. Unit Names McGuire 2 2.Reportingferiod: January 1,1997-January 31,1997
- 3. Licensed Thereal fewer (Mt):
3411 1
- 4. Waeeplate Rating (Bross NWe h 1305e Notes
- Nameplate Rating -
l
- 5. Design Electrical Rating (Net MWel:
1180 (ErossNNelcalculatedas j
- 6. Marious Dependable Capacity (6ross MWe b 1171 1450.000 MVA.90 power l
- 7. Masisus Dependable Capacity (Net Me):
!!29 factor per Page lii, i
S. If Changes Occur in Capacity Ratings (Items Wusber 3 Through 7) Since Last NUREG-0020.
Report. Give Reasons:
l
- 9. Power Level To Which Restricted, if Any (Net Wels
- 10. Reason for Restrictions, if anyt l
4 i
i i
1 This Month Yr.-to-Date Cueulative j
i 1
- 11. Hours In Reporting Period 744.0 744.0
!!3290.0 l
{
- 12. Nusber Of Hours Reactor Was Critical 744.0 744.0 89066.6 l
- 13. Reactor Reserve Shutdown Hours
--0-- -0--
i
- 14. Heurs Generator h-l.ine 744.0 744.0 88020.0
[
- 15. Unit Reserve Shutdown Hours
- ---0--
--0--
- 16. Gross Thereal Energy Generated ( MH) 2521053 2521053 289623963 i
1
- 17. Gross Electrical Energy 6enerated (WH) 982033 982033 100955068 i
- 18. Net Electrical Energy Generated ( WH) 851029 B31029 96819274 i
- 19. Unit Service Factor 100.0 100.0 77.7
(
- 20. Ur.it Availability Factor 100.0 100.0 77.7
[
[
- 21. Unit Capacity Factor (Using NBC Net) 101.3 101.3 75.0 F
- 22. Unit Capacity Factor (Using DER Wet) 96.9 96.9 72.4
- 23. Unit Forced Outage Rate 0.0 0.0 7.2
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None i
- 23. If Shut Down At End Of Report Period. Estimated tate of Startup:
- 26. Units la Test Status (Prior to Consercial Operationh Forecast Achieved j
INITIALCRITICALITY INITIALELECTRICITY I
E CONNERCIAL DPERAi!DN l
.t 4
i f
t OPERATING MTA REPORT j
t DOCKET N0 50-370 l
Imit McGuire 2
,[
DATE February 14. 1997 COMPLETEDBY R.A. Williams.
TELEPHONE 704-382-5346 i
MONTH Januarv. 1997
?
. QA,y, AYERAGE DAILY PDWER LEVEL QR AYERAGE DAILY POWER LEVEL InWe
- t)
InWe
- t)
?
1148 '
17
!!49 2'
1150 18 1149 i
3 1150 19 1150-4 1150 20 1054 f
5 1150 21 1091 6
1149 22 1149 7.
1148 23 1150 4
8 1147 24 1148
.9 1147 25 1149 10 1149 26 1149 1149 27 1149 12 1149 28 1149 13 1149 29 1148 14 1149 30 1147 15 1149 31
'1150 16 1150 l
l
I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME rituulxs 2 DATE v2/le/si__.
REPORT MONTH January 1997
. COMPLETED BY' x.
A.
vv1111ams TELEPHONE (ives-JUZ-bJeb i
(1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 1-P 97-1-20 F
A HA BLOWER ISOLATED PHASE BUSS FAN FAILURE-
?
i l
i (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled
'A-Equi 6 ment Failure (Explain) 1-Manual for Preparation of Data ' t B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram (NUREG-0161))
Event Report (LER D-Regulatory Restriction 4-Other (Explain)
File E-@erator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source i
G-Operator Error H-Other r
i s
e.
..m -..w-
_..-,-.'--w-
.,,-...-*-n.ew..
.-..w,%.
.-.....x, r...
m..m2m.-
DOCKET:' 50 - 370 UNIT: McGuire 2 Date:
02/14/97 NARRATIVE
SUMMARY
MONTil: January,1996 McGuire Unit 2 began the month of January operating at 100% full power. He unit operated at or near 100% full power until 01/20/97 at 1747, when the unit began decreasing power and held at 68% power from 01/20/97 at 1753 to 01/21/97 at 0038 due to isolated phase buss fan failure. The unit returned to 100% full power on 01/21/97 at 0855, and operated at or near 100% full power the remainder of the month.
1 i
t i
4 Preparedby: R. A. Williams Telephone: (704)- 382-5346 -
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 2 2.
Scheduled next refueling shutdown: Scotember 1997 3.
Scheduled restart following refueling: January 1998 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT, 4.
Will refueling or resumption of operatian thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 969 8.
Present licensed fuel pool capacity: 1463 Size of reguested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
December 2003 DUKE POWER COMPANY DATE: February 14.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
)
l