Text
__
May 8, 1997 A
MEMORANDUM T0:
PD IV-1 File FROM:
Tom Alexion ORIG SIGNED BY:
Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
SUBJECT:
LICENSEE'S DRAFT REGULATORY GUIDE POSITIONS FOR GRADED QUALITY ASSURANCE, SOUTH TEXAS PROJECT, UNITS 1 AND 2 (TAC NOS. M92450 AND M92451)
I received the attached faxes from HQMB, who received them from the licensee.
The content of these faxes will be discussed during NRC's site visit during the week of May 5,1997.
Docket Nos. 50-498 and 50-499
Attachment:
As stated t
DISTRIBUTION:
Docket File PUBLIC (PDR) l WBeckner TAlexion Document Name: ST92450.NTF 0FC PM/PD4-PN i
m-t NAME TAlexion/vF'l 1 DATE k/Y/97 g
COPY YhN0 t
0FFICIAL ECORD COPY g
y Ol,i 9705090230 970508 PDR ADOCK 05000498 P
- ,g i
l
I ps nro Il UNITED STATES p
s j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20eelMio01
- \\,*****J May 8, 1997 MEMORANDUM T0:
PD IV-1 File FROM:
om Alexion Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
SUBJECT:
LICENSEE'S DRAFT REGULATORY GUIDE POSITIONS FOR GRADED QUALITY ASSURANCE, SOUTH TEXAS PROJECT, UNITS 1 AND 2 (TAC NOS. M92450 AND M92451)
I received the attached faxes from HQMB, who received them from the licensee. The content of these faxes will be discussed during NRC's site visit during the week of May 5, 1997.
Docket Nos. 50-498 and 50-499 i
Attachment:
As stated l
l i
~
602-W@N 14:5@ '
W Mt2 L80Ex8 M2
~
~
~ ~ B12 1772 $298' ~ "P.0956 HOUSTON LIGHTING & POWER COMPANY - SOUTH TEXAS PROJECT NUCLEAR LICENSING eA P. O. Box 289 Wadsworth, Texas 77483 fax 512-972-8298 gl
, f ~nfl I'. q::ill l
l s
l l
transmittaI i
To:
WALT HAASS j
Fax #:
301-415-2968 i
i From:
JAIRO PINZON l
STAFF LICENSING ENGINEER TELEPHONE # / EXTN. - (512) 972 -8027 1
]
Date:
F29M Wye /,7 i
i Re:
SAMPLE REVISED REG GUIDE / ANSI STANDARD TABLE Pages:
I PAGES, including this cover sheet NOTES:
VERIFICATION # (512) 972-8124, ATTACHMENT
@R-30-irif 16:W GdL*'flRRa3MRO uPIvrngassr-tQrpig Exceptions to Program Commitments Regulatory Guide /
Full Basic -
ANSI Standard RG-1.8 None None R/1-R,9n5 ANSI N18.1,1971 4.2.2 -The Operations Manager same exception requimments reganiing holding a senior reactorlicense are met by the Unit Operations Managers.
I I
r i
f
APR-20-1997 16:39 NUCLEAR LICBGING 512 972 8299 P.03/16 i
i Exceptions to Program Commitments Regulatory Guide /
Full Basic I
ANSI Standard 1.28 This RGis not applicable to same exception R/0,602 operations phase activities ANSIN45.2 This standard is not applicable to same exception operations phase activities i
l i
i 1
l
ADR-30-8997 16:39 t4) CLEAR LICENSINP 512 972 8298 P.04/16 4
l Exceptions to Program Commitments j
Regulatory Guide /
Full Basic ANSI Standard i
RG-1.33 C.2-The specific revisions of the same for position C.2 i
R/2,2/78 listed Regulatory Guides to which j
STPis committed to arelistedin this Table and are not necessarily the f
" latest revision".
C.4 - Chapter 15 of the same for position C.4 STPEOS Operations Quality Assurance Plan describes the audit program at STPEGS which meets the intent ofRegulatory Guide 1.33, j
Revision 2, position C-4, regarding frequency of audits.
I C.4.a, b, c - STP performs these same for position C.4 l
audits in accordance with the nommal biennial frequency j
C.S.d, f, g,I, andj SSCs in the Basic category do not carry a high degme ofsafety j
significance. The referenced j
portions of ANSI NI8.7-j 1376/ANS-3.2 j
will be imposed as written.
1 ANSI N18.7-1976/
3.4.2-See clarification to RG-1.8 same exception j
ANS3.2 regarding the requirements for the Operations Managerholding j
a senior reactor operatorlicense 4
may be met at STP by the Unit Operations Managers.
I j
l I
(U5M>S$$N 1@id
~
004@10 L80x21NG ~
~~ '
512 972 8299 P.05/16 Dlfgglpf Exceptions to Program Commitments I
Regulatory Guide /
Full Basic ANSI Standard ANSI N18.7 (cont) 3.4.2 - See exception to RG-i 1.58 regarding the use of personnel not qualified in accordance with ANSI N45.2.6,1978 4.5 - see exception to RO-1.33 same exception regarding audit fzequency l
5.2.6 (5th para)- The requirements regardmg independent verification will not be implemented for Basic SSCs.
+
5.2.7 (1st para)- STP will use same exception cunent, approved design bases in lieu oforiginal design bases 5.2.7 (1st para)- STP will use
" inspection or performance testing" as opposed to
" inspection and perfonnance testing" 5.2.7 (4th para)- The listed Standards will be imp!cmented as committed to in this Table 5.2.7.1 (5th para)- STP takes same exception exception to the use of the word "promptly" with regard to determining, evaluatmg, and recordmg the causes of malfunctions.
The STP Corrective Action Program includes the elements with regard to timeliness of actions associated with causal analyr.es.
APR-30-1997 ~s6:4a ~~
~~ NUCLEAR' O CESSING' ^ ~~
~
55E 972 8250 P.06M6 4
. Exceptions to Program Commitments Regulatory Guide /
Full Basic 1
ANSI Standard ANSI N18.7 (cont) 5.2.7.2 - See exceptions to ANSIN45.2.11,1974 5.2.13 (1st pars)- See 4
exception to ANSI N45.2.13, 1976 i
5.2.13.1 (1st para)- STP is not committed to ANSI l
N45.2,1971 for operanons phase activities.
i 5.2.13.4 (5th para)- Sec j
exceptions to ANSI N45.2.2, j
1972 l
5.2.15 (4th para)- Chapter 5 of the same exception j
STPEOS Operations Quality i
Assurance Plan describes the requirements for controland 1
issuance ofdocuments, which 1
meets the intent ofRegulatory j
Guide 1.33, Revision 2. The intent ofthe biennialreviewis accomplished by other watrols
]
which assure that procedures are appropriately reviewed and revised to incorporate information based on plant operations, design changes, regulatory requirements, industry i
experience and otherconditions that mayimpact plant procedures.
1 4
1
~ ~ ~
APR-30-1997 16:d8 NUCLEAR LICENSING 582 972 8299 P.07/ 6 4
4 Exceptions to ProgranUCommitments Regulatory Guide /
Full Basic ANSI Standard ANSI N18.7 (cont) 5.2.17 (3rd para)- STP will 3
notimplement the requirement for conduct of i
1 inspections in a manner similar(frequency, type, and personnelperfonmng such invlons) to that associated with construction phase activities.
i e
APR-30-1997 16:41 NUCLEAR LIC3GING 512 972 8299 P.08/86 UYEATU
~
Exceptions to Program Commitments Regulatory Guide /
Full Basic ANSI Standard l
RG-1.38 None None R/2,5/77 ANSI N45.2.2,1972 2.4 - Audit personnel are qualified 2.4 - Offsite oversight in accordance with STP's willnot be performed on commitment to RG-1.146 and suppliers of SSCs in the ANSI N45.2.23.
Basic category i
I 1
=
4
.___._ m APR-30-1997 16:48 NUCLEAR LICENSING 512 972 8298 P.09/86 l
l l
Exceptions to Progmm Commitments Regulatory Guide /
Full Basic ANSI Standard RG-1.54 Position C.I - STP is not same exception R/0,6/73 committed to ANSI N45.2 for
~
l operations phase activities 1
Position C.2 - The specific revisions same exception ofreferenced standards to which l
STPis committed are listed in this l
Table and are not necessarily the' "most recent or current".
ANSI N101.4,1972 2.7 - See excepSon to RG-1.58, position C.2.
6.6.5 - STP uses either Dry same exception or Wet Film Thickness for determination offilm thickness for magnetic substrates 6.6.7 - Acceptance ofcoating same exception thickness over concrete and other nonmagnetic substrates may be based on Wet Film Thickness if immediately taken after application.
(Reference ANSI N5.12 whi.h superseded ANSIN5.9) 9
~....
. ~ - -.
APR-30-8997 26:41 MJCLEAR LICENSING W A72 9298 P.10/16 j
Exceptions to Program Commitments Regulatory Guide /
Full Basic ANSI Standard RG-1.58 Position C.2, C.2.a. C.2.b -
same exception R/1,4/80 STP is committed to and
)
complies with ASNT-TC-i 1A-1980.
ANSI N45.2.6, 1.2 (1st para)- With the 1978 exception ofreceipt inspection activities, i
personnel may perform I
inspections, cyaminations, I
and tests provided they are experienced, task qualified 4
journeymen or supervisors and they didnot perform or i
directly supervise the activity j
being inspected, examined, or tested 'Ihesepersonnelshall i
meet the training and qualification requirements of the discipline training 4
program,and shall be trained on inspection processes as necessary.
1.2 (3rd para)- STP is not same exception committed to ANSIN452 for operations phase activities.
See RG-1.28 exception 1.4.4 - STP is not committed to same exception 1
ANSI N45.2.10 for operations phase activities.
See RG-1.74/ ANSI N45.2.10 f
__.._^ ~ PR-2161997......16:42-. -. -.
- - ~
- 14) CLEAR LICENStrG 582 972 8238 P.82/16 Exceptions to Program Commitments i
N Regulatory Guide /
Full Basic
- ANSIStandard i
j RG-1.64 Position C.2-STP will R/2,6n6 implement the requirement
]
regarding design verification as written in ANSIN45.2.11, i
1974, Section 6.1, second paragraph, second sentence in
.l lieu of the wording in Position C.2.
ANSI N45.2.11,1974 3.2 (1st para)-Applicable j
designinput will be documented. Adesigninput 3
checklist foritems 1 through 28 willnot be provided.
6.3 -Exceptionis taken to the i
acceptable verification 3
methods and their specific
};
requirements. Verification and checking the adequacy of design will be performed j
through design review and i
approval by engineering i
supervision and management for the Basic program as 4
j provided forin Section 6.1 l
l 2
+
4 e
i l
l 4
i I
4
6ffd-M9-8%s# 8@ dM IW50iCfTJCf6MK0 bMYGPIl%"L@
F.1PF86 Exceptions to Program Comndtments i
Regulatc:y Guide /
Full Basic ANSI Standard j
RG-1.74 Not applicable to STP same exception j
2/74 i
A NS'; N45.2.10, Not applicable to STP same exception 1973 Note: STP uses ANSI /ASME NQA-1-1983 for Quality Assurance Terms and Definitions i
l 1
~
~~
ppp.3a_ggg7 ~ ~id:22'
'~ NUCLEAR LlCENSING^
~~
512 972 8298 ~ P.13/i6
'~
Exceptions to Program Commitments Regulatory Guide /
Full Basic ANSI Standard RG-1.123 STP takes exception to position same exception R/1,7n7 C.3 STP takes exception to position C.6. The referenced sections of ANSIN45.2.13 will beimplemented as written.
C.6.b. The referenced section same exception of ANSIN 45.2.13 will be implemented as written.
ANSI N45.2.13, Various sections refer to ANSI same exception 1976 N45.2. See exception to RG-1.28 and ANSIN45.2 STP takes exception to Section same exception 9.0 in its entirety 5.3 and 5.4 - Provisions are same exception established for,in special instances, completion of these activities after award ofcontract.
Section 7.2.1 - This section will not be implemented for the Basic Pmgram Section 7.3.1 -This section will not be implemented for the Basic Program Section 10.2 -This section will not be implemented.
&#d-&lW3M 1@:41J K!f99ff;J LY@@@ Rd W83 Wrg gggg P.14/16 DRTT Exceptions to Program Commitments Regulatory Guide /
Full Basic ANSI Standard ANSI N45.2.13, 1976 (cent) 10.3.1 - This section will not beimplemented for the Basic Pmgmm.
Section 12 - Audits of Supplier quality assurance programs will not be implemented for Basic program SSCs.
~
NUCLEAR'L1CENSIbG 512 972 8298 P.'h5316~
APR-30-1997 16:43 UNAP0 Exceptions to Program Conunitments Regulatory Cnude/
Full Basic ANSI Standard RG-1.144 C.1 - See exception to RG.I.28 sune exception R/1,9/80 and RG-1.74 C.3.a.(1)- See exceptions to same exceptiod l
l RG-1.33 regarding frequency Exception to this RG is taken for suppliers of SSCs in the j
Basic category.
ANSI N45.2.12 STP willnot implement l
1977 this standard for suppliers ofSSCs in the Basic category.
l l
l
't i
_ ~..
APR-30-2997 16:43 HUCLEAR LICENSING 582 972 8298 P.16/16 l
0 Exceptions to Program Commitments Regulatory Guide /
Full Basic ANSI Standard RG-1.146 C.1 - See exceptions to RG-1.28 same exception R/0,8/80 and RG-1.74 ANSI N45.2.23, 1.2 - See exception to RG-1.28 same exception 1978 1.4 - See exception to RG-1.74 same exception 2.2.1 - See exception to RG-1.28 same exception 2.3.3.1 - See exception to RG-1.28 same exception 1
J 1
TOTAL P.16
d@@-2$-8@@ff ~ 16'iS8' NtJCLEAR LICENSING ~~
^
512 972 8298 P.01 02 i
HOUSTON LIGHHNG & POWER COWANY - SOUTH TEXAS PROJECT 4
NUCLEAR LICENSING A
P. O. Box 289 C
C' Wadswonh, Texas 77483 fax 512-972-8298 fl 1 Ulci till fax t r a
n s
m i
t t
a i
To:
WALT HAASS Fax #:
301-415-2968 From:
JAIRO PINZON STAFF LICENSING ENGINEER TELEPHONE # / EXTN. - (512) 972 -8027 Date:
4/28/97 Re:
SAMPLE REVISED REG OUIDE/ ANSI STANDARD TABLE Pages:
,2_ PAGES, includmg this cover sheet NOTES: _
l VERIFICATION # (512) 972-8124
g gg_1ggp 19:e1 m LB@b424
~
~
512 972 B298 P.02}02
~
~
Exceptions to Program Committments Regulatory Guide /
Full Basic ANSI Standard RG-1.54 Position C.1 - STP is not same exception R/0,653 committed to ANSI N45.2 for operations phase activities 1
i Postion C.2 - The specific revisions same exception ofreferenced standards which STP is committed to are listedin this Table and are not necessarily the "most recent or current".
ANSI N101.4,1972 2.7 - See exception for RG-1.58, position C.2.
6.6.5 - S'IP uses either Dry same exception or Wet Film Thickness for determination offilm thickness for magnetic substrates 6.6.7 - Acceptance ofcoating same exception thickness over concrete and other nonmagnetic substrates may be based on Wet Film Thicknessif immediately taken after application.
(Reference ANSIN5.12 which superceded ANSI N5.9)
TOTAL P.02