ML20138J808
| ML20138J808 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/17/1997 |
| From: | Jaudon J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Richard Anderson FLORIDA POWER CORP. |
| Shared Package | |
| ML20138J812 | List: |
| References | |
| 50-302-97-06, 50-302-97-6, EA-97-162, NUDOCS 9705090039 | |
| Download: ML20138J808 (4) | |
See also: IR 05000302/1997006
Text
-_
__
.-
_
__-
_
_ _ _
_..__._ _ _ .
__. _
I
,
,
l4'
\\
.
l
A ril I7.1997
P
EA 97-162
Florida Power Corporation
Crystal River Energy Complex
l
Mr. Roy A. Anderson (SA2C)
!
Sr. VP, Nuclear Operations
ATTN: Mgr., Nuclear Licensing
l
15760 West Power Line Street
l
Crystal River, FL 34428-6708
l
i
SUBJECT:
NRC SPECIAL INSPECTION REPORT NO. 50-302/97-06
i
1
Dear Mr. Anderson:
This refers to the inspection conducted on March 19 through March 21,1997, at the Crystal
i
l
River facility. The purpose of the inspection was to follow up on the addition of required
l
operator actions for small break loss of coolant accident mitigation. The enclosed report
presents the results of this inspection.
l
Based on the results of this inspection, an apparent violation was identified and is being
considered for escalated enforcement action in accordance with the " General Statement of
Policy and Procedures for NRC Enforcement Actions"(Enforcement Policy), NUREG-1600.
,
i
The apparent violation involves three examples of inadequate safety evaluations for operator
actions added for design basis small break loss of coolant accident mitigation. This apparent
'
violation is of concern because your emergency core cooling system is not able to respond
l
automatically to a design t' asis event, but instead it now relies on the accomplishment of
seven different operator acuans within the first 20 minutes of an event. Your addition of
!
l
operator actions to the system design basis could result in both the possibility of a
l
malfunction of a different type (i.e., operator error) and an increase in the probability of
l
occurrence of a malfunction of equipment important to safety. These changes involved an
unreviewed safety question and were implemented without the required prior NRC review and
approval.
Accordingly, no Notice of Violation is presently being issued for these inspection findings. In
addition, please be advised that the characterization of the apparent violation described in the
enclosed inspection report may change as a result of further NRC review.
!
You will be advised by separate correspondence of the results of our deliberations on this
matter. No response regarding the apparent violation is required at this time.
0S00.?1
'
ll ll ll llllll
llll
>
........
l
9705090039 970417
~~
ADOCK 05000302
l
G
g 0f
. .__
_ _
_
_
_
_
..
__ _
_
_ __
_
_
_
.,
,
F
.
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
Sincerely,
Original signed by
j
Johns P. Jaudon
l
Johns P. Jaudon, Director
Division of Reactor Safety
Docket No. 50-302
License No. DPR-72
!
Enclosure: Inspection Report 50-302/97-06
l
cc w/ encl:
John P. Cowan, Vice President
Nuclear Production (SA2C)
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
l
Crystal River, FL 34428-6708
8. J. Hickle, Director
l
Nuclear Plant Operations (NA2C)
Florida Power Corporation
Crystal River Energy Complex
i
15760 West Power Line Street
Crystal River, FL 34428-6708
David F. Kunsemiller, Director (SA2A)
Nuclear Operations Site Support
l
Florida Power Corporation
'
Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
,
R. Alexander Glenn
l
Corporate Counse.;
l
Florida Power Corporation
l
MAC - ASA
!
P. O. Box 14042
St. Petersburg, FL 33733-4042
,
(cc w/enci cont'd - See page 3)
l
. - - -
- . .
_ _ - - . . _ _ _ . . . . . . . - .
..
-
-- - -.
.
-
- - .
.
..
-
.-
,
.
,
.
.
l
3
l
(cc w/enci cont'd)
Attomey General
l
Department of Legal Affairs
,
The Capitol
Tallahassee, FL 32304
l
l
l
Bill Passetti
j
Office of Radiation Control
Department of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee, FL 32399-0700
Joe Myers, Director
Division of Emergency Preparedness
l
!
Department of Community Affairs
l
2740 Centerview Drive
l
Tallahassee, FL 32399-2100
Chairman
Board of County Commissioners
Citrus County
_.
110 N. Apopka Avenue
Invemess, FL 34450-4245
i
i
l
Robert B. Borsum
Framatome Technologies
1700 Rockville Pike, Suite 525
Rockville, MD 20852-1631
l
(Distribution w/enci- See page 4)
!
l
l
i
l
I
. .
_-.
--
. _ .
. - - - . . . . -
-
.
.
e
.
.
.
4
i
Distribution w/enci:
J. Lieberman, OE
D. Nelson, OE
8. Summers, OE
K. Landis, Rll
L. Raghavan, NRR
l
G. Hopper, Rll
l
PUBLIC
NRC Resident inspector
U.S. Nuclear Regulatory Commission
'
6745 N. Tallahassee Road
,
!
Crystal River, FL 34428
l
i
l
i
4
!
l
!
!
!
t
!
!
0FFICF
pff
P!f
P!f
. A
pff
P!f n A
P11
SIGNATURE
J
f
hb
a
NAME
RSchini
CChristensen
Klan
ryc
CEvans
04_/lb/97
04 / / b/ 97
04 /
b / 97
04/l1/97
04 / f / /E
04 /
/ 97
DATE
/ Eh
NO
[E5 ')
NO
[fES )
NO
YES/[NO))
YES
NO
COPY?
/kD
NO
f
i
OrHCiAL Rtiuku COPY
DOCUMLNI NAMi T \\Okb\\LB\\Ch9/C D Pl
"'
,