Text
~
.
-.
..
OCT 251985
D:cket No. 50-341
The Detroit Edison Company
ATTN: Wayne H. Jens
Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to the routine safety inspection conducted by P. M. Byron,
M. E. Parker, D. C. Jones, S. G. DuPont, and J. M. U11e of this office
on July 1 through September 30, 1985, of activities at Fermi 2 authorized
by Facility Operating License No. NPF-43 and to the discussion of our
findings with R. S. Lenart at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
cxamination of procedures and representative records, observations, and'
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Appendix.
A written
r;sponse to violation 1 is required.
With respect to violation 2, inspection
activities have determined that appropriate corrective action has been taken
to correct the identified violation and to prevent recurrence.
Consequently,
no reply to this violation is required and we have no further questions
regarding this matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
Tha responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
,
i
lBk 988lR 8M8n
.
\\
D8 1
J
<
.
The Detroit Edison Company
2
OCT 251985
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by N. J. Chrissotimos"
N. J. Chrissotimos, Chief
Reactor Projects Branch 2
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-341/85037(DRP)
cc w/ enclosures:
L. P. Bregni, Licensing
Engineer
P. A. Marquardt, Corporate
Legal Department
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Harry H. Voigt, Esq.
Nuclear Facilities and
Environmental Monitoring
Section
Monroe County Office of
Civil Preparedness
RIII
RIII
W gh /kja
Ch
ss'otimos
10/25/85
p.g4 $ 7
J