BSEP-97-0116, Forwards Corrected Monthly Operating Repts for Nov & Dec 1996 for BSEP Unit 1.Gross Thermal Energy Generation (Megawatt-hours) Data Reported on Line 16 of Repts Are Incorrect
| ML20138H775 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/29/1997 |
| From: | Jury K CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20138H780 | List: |
| References | |
| BSEP-97-0116, BSEP-97-116, NUDOCS 9705070278 | |
| Download: ML20138H775 (3) | |
Text
. __
e CP&L l
Carolina Power & Ught Company P.O. Box 1o429 Southport, NC 28461-o429 I
L APR 2.91997 SERIAL: BSEP 97-0116 FILE: B09-13510C J
i U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk t
Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 CORRECTION TO MONTHLY OPERATING REPORTS l
Gentlemen:
I By letter dated December 12,1996 (Serial: BSEP 96-0451), and in accordance with Technical l
Specification 6.9.1.11 for the Brur.swick Steam Electric Plant (BSEP), Unit Nos.1 and 2, Carolina Power & Light (CP&L) Company submitted the operating statistics and shutdown experience information for the month of November 1996. Subsequently, by letter dated 1
January 14,1997 (Serial: BSEP 97-0015), CP&L submitted the operating statistics and shutdown experience information for the month of December 1996.
CP&L has determined that the BSEP Unit No.1 Gross Thermal Energy Generation (Megawatt-hours) data reported on Line 16 in the November 1996 and December 1996 reports is incorrect.
The calculations used to generate the reported year-to-date and cumulative Gross Thermal i
Energy Generation values inappropriately applied the uprated thermal power level to the year-j to-date and cumulative Gross Thermal Energy Generation data. Replacement pages for the November 1996 and December 1996 reports, with corrected year-to-date and cumulative Gross Thermal Energy Generation values for BSEP Unit No,1, are provided as Enclosures 1 and 2, respectively..
l Please refer any questions regarding this submittal to Mr. Mark Turkal, Supervisor-Licensing l'
at (910) 457-3066.
r Sincerely, I
1 Y
Gnf&
u 070058 Keith R. Jury Manager - Regulatory Affairs Brunswick Steam Electric Plant 9705070278 970429 f
lll ll lll lll llllllllll gDR ADOCK 05 34
.m.
.. _ _........_ _ _.. -. _.. _. _ _... _. _. ~. _... _ _ _. _ _ _ _ _ _ _ _ _ _..
I Document Control Desk l
BSEP 97-0116 / Page 2 WRM/wrm
Enclosures:
- 1. Correction to Plant Performance Data System Operating Data Report - November 1996 '
- 2. Correction to Plant Performance Data System Operating Data Report - December 1996 i
4 I
t i
l l
l 1
l i
I i
i i
i l
I 4
i 4
J b
e E
,s
Document Control Desk l
BSEP 97-0116 / Page 3 i
pc (with enclosures):
t 1
U. S. Nuclear Regulatory Commission, Region 11 i
ATTN.:- Mr. Luis A. Reyes, Regional Administrator j
Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 U. S. Nuclear Regulatory Commission 4
ATTN: Mr. C. A. Patterson, NRC Senior Resident inspector 8470 River Road Southport, NC 28461 i
U. S. Nuclear Regulatory Commission ATTN.: Mr David C. Trimble, Jr. (Mail Stop OWFN 14H22) 11555 Rockville Pike 4
Rockville, MD 20852-2738 1
The Honorable J. A. Sanford i
Chairman - North Carolina Utilities Commission a
P.O. Box 29510 Raleigh, NC 27626-0510 4.
i J
l j
,