Forwards Enforcement Conference Repts 50-277/85-42 & 50-278/85-42 on 851114 & Notice of Violation.Civil Penalty Will Not Be Issued by NRC Since State of Sc Assessed Penalty of $1,000 & Violations Corrected in Timely Fashion
ML20138D686
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/09/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20138D693 List:
References
NUDOCS 8512130282
Download: ML20138D686 (3)


See also: IR 05000277/1985042

Text

.

.

DEC 0 91965

Docket Nos.

50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Meeting Report Nos. 50-277/85-42; 50-278/85-42

An Enforcement Conference was held on November 14, 1985, at the NRC Region I

office, King of Prussia, Pennsylvania, to discuss several recent transportation

events concerning Peach Bottom Atomic Power Station and your actions as a

result of your investigations of the causes for the events. All except the

latest event have been the subject of previous NRC or State actions. The

latest event was identified in Special Inspection Report No. 50-277/85-39;

50-278/85-40, and is the subject of the Notice of Violation described in

Appendix A.

The topics discussed at the enforcement conference are described

in the attached Meeting Summary.

Based on our review of the results of the inspection at Barnwell, South

Carolina, conducted by a representative of the South Carolina Department of

Health and Environmental Control on October 18, 1985, of a shipment from Peach

Bottom Atomic Power Station, it appears that one of your activities was not

conducted in full compliance with NRC requirements, as set forth in the Notice

of Violation, attached as Appendix A.

The violation involved lifting cables

that were not accessible at the burial site.

The violation has been cate-

gorized at the Severity III Level in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C

(1985).

The violation for which you have been cited has already been the subject of

enforcement action by the State of South Carolina on October 21, 1985. On

October 21, 1985, the State of South Carolina assessed a civil penalty of

$1,000.00.

In addition, your South Carolina Waste Transport Permit was sus-

pended until you demonstrated compliance with State and Federal Laws. We

have exercised our discretion under our Enforcement Policy and decided not to

issue a civil penalty in this case. Our decision is based on (1) the actions of

the State of South Carolina, (2) the timely corrective actions you have taken

for this and previous transportation violations discussed during the Enforcement

Conference, and (3) your thorough presentation of issues and corrective actions

at the Enforcement Conference.

You are required to respond to this letter and in preparing your response, you

should follow the instructions specified in the enclosed Notice.

OFFICIAL RECORD COPY

MR PB 85-42 - 0001.0.0

851213o282 851209

PDR

ADCCK 05000277

Ah

J

h

G

PDR

I

i

.

.

.

Philadelphia Electric Co.

2

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduc. tion Act of 1980, PL 96-511.

Sincerely,

Oris t'nni signed by

Thor..aL.i.urleg,

Thomas E. Murley

Regional Administrator

Enclosures:

1.

Notice of Violation

2.

NRC Meeting Report Nos. 50-277/85-42; 50-278/85-42

cc w/ encl:

R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

W. H. Hirst,, Director, Joint Generation Projects Department, Atlantic Electric

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

OFFICIAL RECORD COPY

MR PB 85-42 - 0002.0.0

12/05/85

f.

,

.

Philadelphia Electric Co.

3

Mh

N

M!k*

RI:DRSS

R DRSS

RIiDRSS

RI: S

DRP

Pasciak/fi/mmb

Bellamy

Martin

Holody

Ga\\\\

12/[/85

12/[/85

12/1/85

12/k/85

g y (9 b

RI

P

R d

OITRA

St o ecki

Al

an

Murley

12/h/85

12/h/85

12/h85

l

0FFICIAl. RECORD COPY

MR PB 85-42 - 0003.0.0

{

12/05/85

l

3