ML20138D582

From kanterella
Jump to navigation Jump to search

Forwards SE Granting Relief from Repair Requirements of ASME Code Section XI in Order to Perform Temporary Noncode Repair to 18 Inch Portion of Nuclear Closed Cycle Cooling Sys
ML20138D582
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/09/1993
From: Berkow H
Office of Nuclear Reactor Regulation
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20138D587 List:
References
TAC-M84895, NUDOCS 9302220452
Download: ML20138D582 (3)


Text

+ February 9, 1993 Docket fio. 50-302 Mr. Percy M. Beard, Jr.

Senior Vice President Huclear Operations Florida Power Corporation ATTN: Manager, Nuclear Operations Licensing P.O. Box 219-NA-21 Crystal River, Florida 34423-0219

Dear Mr. Beard:

SUBJECT:

RELIEF FROM REPAIR REQUIREMENTS OF ASME CODE CLASS III PIPING (TAC NO. 84895)

By letter dated November 13, 1992, you requested relief from the repair requiremeits of ASME Code Section XI in order to perform a temporary non-Code repair to an 18-inch portion of the Nuclear Closed Cycle Cooling (SW) system at Crystal River Unit 3 until the maintenance outage scheduled for the spring of 1993. You had previously requested similar relief for a 6-inch portion of the same system, which we granted verbally on November 6,1992, and confirmed by letter dated Decembe- 22, 1992.

The requested relief is hereby granted. Our Safety Evaluation covering this action is enclosed.

This completes our efforts on Tac No. 84895.

~

(Original Signed By)

Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure: See next page Distribution: See next page n

DTC KATPDIT-T:PN -2 :D3DTF 2 :0G -

M finME~itTanac>c.,f; :HFfher iilser 2

.4 N. . e

.IALlnw') ~

DKTE7477/9~3 Aff97 7/;?/93 :g/g/O  :

Document name - CR184H9 DiCM h \

-- 1

g22ggggg2 hi P

l Mr..Percy M. Beard Crystal River Unit No.3 Florida Power Corporation Generating Plant cC:

Mr. A. H. Stephens Mr. Robert G. Nave, Director General Counsel Emergency Management Florida Power Corporation Department of Community Affairs MAC-ASD 2740 Centerview Drive P. O. Box 14042 Tallahassee, Florida 32399-2100 3t. Petersburg, Florida 33733 Mr. Bruce J. Hickle, Director Chairman Nuclear Plant Operations Board of County Commissioners Florida Power Corporation Citrus County P. O. Box 219-NA-2C 110 North Apopka- Aver.ue Crystal River, Florida 34423-0219 Inverness, Florida 32650 Mr. Robert B. Borsum Mr. Rolf C. Widell, Director B&W Nuclear Technologies Nuclear Operations Site Support 1700 Rockville Pike, Suite 525 Florida Power Corporation Rockville, Maryland 20852 P. O. Box 219-NA-21 Crystal River, Florida 34423-0219 Regione Administrator, Region II U. S. Nuclear Regulatory Commission Senior Resident inspector 101 Marietta Street N.W., Suite 2900 Crystal River Unit 3 Atlanta, Georgia 30323 U.S. Nuclear Regulatory Commission ,

Mr. Jacob Daniel Nash 6745 N. Tallahassee Road Office of Radiation Control Crystal River, Florida 34428 Department of Health and Rehabilitative Services Mr. Gary Boldt 1317 WinewocJ Slvd. Vice President - Nuclear Tallahassee, Florida 32399-0700 Production _

Florida Power Corporation -_

Administrator P.O. Box 219-SA-2C Department of Environmental Regulation Crystal Rive , Florida 34423-0219 Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahaseee, Florida 32301 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 l

-