ML20138C938
| ML20138C938 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/18/1985 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20138C944 | List: |
| References | |
| NUDOCS 8510230109 | |
| Download: ML20138C938 (2) | |
See also: IR 05000293/1985019
Text
.
%
DCT 181985
Docket No. ~50-293
License No. DPR-35
Boston Edison Company M/C Nuclear
ATTN: .Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No. 50-293/85-19
This refers to the routine safety inspection conducted by Mr. W. J. Lazarus
and others on September 4-6, 1985 at the Pilgrim Generating Station, Plymouth,
Massachusetts, of activities authorized by NRC License No. DPR-35, and to
discussions of our findings held by Mr. Lazarus with Mr. A. Oxsen cf your staff
at the conclusion of the inspection.
Areas examined during this inspection included observation of your
September 5, 1985 emergency exercise and other areas as described in the NRC
Region I Inspection Report which is enclosed with this letter. Within these
4
y
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations made by
the inspectors.
Within.the scope of the inspection, no violations were identified, however, we
'
are concerned over the lack of evaluation and control of radiation exposures
to in plant personnel (re-entry teams) involved in the simulated emergency.
Our inspectors were unable to assess your ability to evaluate and control
in plant radiation exposures.
It is our understanding that you will conduct a
drill demonstrating this area, following development of appropriate procedures
and training. A second area of concern involves the lack of appropriate proce-
dures for relocation of the Emergency Operations Facility to its alternate
location.
In response to this letter, please provide a description and schedule
of corrective actions in these areas within 30 days of receipt of this letter.
Your cooperation with us in this matter is appreciated.
,
Streerely,
I
Original Signed By:
'%3b0 - b
Thomas T. Martin, Direct r
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Inspection Report No. 50-293/85-19
/
OFFICIAL RECORD COPY
DL PILGRIM 85-19 - 0001.0.0
8510230109 851018
10/17/85
t
l
[
Am O
ll
g
3
.
..
.
.
..
- -.
_
_ .
. - -
. _ .
. _ . _ . __
_ _ .
.
.
6
Doston Edisen Company
2
M/C Nuclear
.
.
cc w/ encl:
A. V. Morisi, Manager, Nuclear Management Services Department
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
W. J. Nolan, Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
. Commonwealth of Massachusetts (2)
2
bcc w/ enc 1:
,
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
i
Section Chief, DRP
W. Raymond, SRI, Vermont Yankee
T. Shediosky, SRI, Millstone 1&2
H. Eichenholz, SRI, Yankee
P. Leech, LPM, NRR
!
FEMA, Region I.
'
,
4
!
i
,
,
>
1
!
'
i
!
.
I
!
@hJb
'
,
RI:DRSS
RI:0RSS
RI:DRSS.
La a us/ms
Har ter
Bellamy
J'/85
10/o/85
104 7/85.
.
OFFICIAL RECORD COPY
'DL PILGRIM 85-19 - 0002.0.0
!
10/07/85
i
!
!
l
!
'
.-
..
,
. - . ,
- - - . .
-. -.
.
.-
. . . . _ . - . .
-
. - -
. . - . - . . .
.