Forwards Safety Insp Rept 50-293/85-19 on 850904-06.No Violation Noted.Concern Expressed Re Lack of Evaluation & Control of Radiation Exposures to in-plant Personnel Involved in Simulated Emergency
ML20138C938
Person / Time
Site: Pilgrim
Issue date: 10/18/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20138C944 List:
References
NUDOCS 8510230109
Download: ML20138C938 (2)


See also: IR 05000293/1985019

Text

.

%

DCT 181985

Docket No. ~50-293 License No. DPR-35

Boston Edison Company M/C Nuclear

ATTN: .Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection No. 50-293/85-19

This refers to the routine safety inspection conducted by Mr. W. J. Lazarus

and others on September 4-6, 1985 at the Pilgrim Generating Station, Plymouth,

Massachusetts, of activities authorized by NRC License No. DPR-35, and to

discussions of our findings held by Mr. Lazarus with Mr. A. Oxsen cf your staff

at the conclusion of the inspection.

Areas examined during this inspection included observation of your

September 5, 1985 emergency exercise and other areas as described in the NRC

4

Region I Inspection Report which is enclosed with this letter. Within these

y areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations made by

the inspectors.

'

Within.the scope of the inspection, no violations were identified, however, we

are concerned over the lack of evaluation and control of radiation exposures

to in plant personnel (re-entry teams) involved in the simulated emergency.

Our inspectors were unable to assess your ability to evaluate and control

in plant radiation exposures. It is our understanding that you will conduct a

drill demonstrating this area, following development of appropriate procedures

and training. A second area of concern involves the lack of appropriate proce-

dures for relocation of the Emergency Operations Facility to its alternate

location. In response to this letter, please provide a description and schedule

of corrective actions in these areas within 30 days of receipt of this letter.

Your cooperation with us in this matter is appreciated. ,

Streerely,

I Original Signed By:

'%3b0 - b

Thomas T. Martin, Direct r

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-293/85-19

/

OFFICIAL RECORD COPY DL PILGRIM 85-19 - 0001.0.0

t 8510230109 851018 3 10/17/85

Am O ll

l [ g

. .. . . .. - -.

_ _ . . - - . _ . . _ . _ . __ _ _ . .

.

6

Doston Edisen Company 2

M/C Nuclear

.

.

cc w/ encl:

A. V. Morisi, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

2

. Commonwealth of Massachusetts (2)

, bcc w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl) i

Section Chief, DRP

W. Raymond, SRI, Vermont Yankee

T. Shediosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

! FEMA, Region I.

'

,

4

!

i

,

,

>

1

'

!

i

!

. I

!

'

@hJb ,

RI:DRSS RI:0RSS RI:DRSS.  ;

La a us/ms Har ter Bellamy

J'/85 10/o/85 104 7/85.

.