Monthly Operating Rept for Nov 1985
ML20138C543
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/30/1985
From: Lempges T, Roman T
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
MMP-15170, NUDOCS 8512130042
Download: ML20138C543 (6)


Text

r NIAGARA h!0llAWK POWER CORPORATION NINE blILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of November 1985 with a Unit Availability Factor of 74.1 and a Net Design Electrical Capacity Factor of 69.7.

There was 1 challenge to the Electromatic Relief Valves. Reduc-tions in Capacity Factor were due to 3 Rx Scrams and a load reduction to pull control rods.

CLASS I WORK - blECilANICAL h!AINTENANCE - NOVEh!BER 1985 hR# 24626 Rebuild snubber 39-IIS-22 because of low oil in res. (Snubber rebuilt by Bergen Paterson) hR# 35583 Inspect and repair as necessary #11 Inst. air dryer. (Repaired swing bolts on filters)

WR# 35321 Open and Inspect internal of suspect Instrument air system valves, repair as necessary. Opened valves and found no problems, hR# 31989 Valve 05-01R (Emerg. Cond. vent to blain Steam line) packing is leaking.

(repacked) hR# 30855 Loop 12 vent 4 (05-12) packing leaks steam.

(repacked valve) hR# 35327 Repair root valve at flow orifice on #15 Rx Recire Sys.

(repacked valve) hR# 35326 Repair coupling on RBCLC to #13 Rx Recirc pump.

(welded new union in line)

WR# 30895 Repack Steam IV 39-10.

(repacked valve) hR# 32717 Indicated pressure of LP seal is rising on #11 Recire. pump repair /

replace as necessary.

(removed old seal and replaced with modified seal) hR# 35591 Snubber 36 IIS 6 low on oil.

(filled with oil, tightened fittings) hR# 35590 Snubber 39 IIS 12 low on oil.

(filled with oil, tightened fittings)

WR# 35593 Snubber 66 ilS 16 low on oil.

(filled with oil, tightened fittings) hR# 35592 Snubber 66 IIS 9 low on oil.

(filled with oil, tightened fittings)

WR# 35502 Repack Containment spray raw water pump 93-01.

(repacked pump)

WR #35791 01-12 BV adjacent to 113 ERV water is leaking by bottom flange nuts.

(torqued bolts on poppet valve 01-12, to 280 ft. Ibs.)

WR# 35333

  1. 12 Emerg. Cool. loop steam vent valve packing leaks by (05-04R).

Also air operator not working.

(replaced packing and freed limit switches on valve.

Replaced 0 rings in air operator) hR# 35594 Inspect all snubbers in llPCI sys. using htST-V1.

(inspected all accessibic snubbers in sys. 29, 30 and 51) hR# 35796 Inspect all snubbers in llPCI sys..using htST-V1 criteria to meet RAP-6.

(Inspected all accessible snubbers in sys. 29, 30 and 51) hR# 35853 Testable check valve 93-58 does not work, repair.

(cycled valve 3 times) hR# 35861 Install DW strong backs.

(installed strongbacks) hR# 32153 Rebuild Cont. spray raw water pump #122.

(replaced old pump with a rebuilt pump) 0512130042 851130 PDR ADOCK 05000220 R

PDR

r CLASS I WORK - ELECTRICAL MAINTENANCE - NOVEMBER 1985 WR4 32153 093-03, Containment Spray Raw Water Pump 122 (assist Mechanical Maintenance on pump replacement)

WRd 35564 001, Main Steam System, Electromatic Relief Valve 112, (replaced Solenoid Assembly)

WR# 35563 001, Main Steam System, Electromatic Relief Valve 121, (replaced Solenoid Assembly)

WR# 34855 001, Main Steam System, Electromatic Relief Valve 113, (tested Solenoid Assembly)

WR# 35328 001, Main Steam System, Electromatic Relief Valve 113, (replaced Solenoid Assembly)

WR# 35332 031-07, Reactor Feedwater Isolation Valve No. 11, (inspected limitorque)

CLASS I WORK - INSTRUMENTATION 6 CONTROL - NOVEMBER 1985 WR# 35323 Feedwater Pump #12 lock-in valves failed to prevent feedwater control valve movement on loss on Instrument air pressure (rebuilt lock-in valves and replaced tubing)

WR# 35324 Check calibration of #113 and #123 Electromatic Relief valves (Performed calibration procedure N1-ISP-18)

WR# 35329 Level control valve 60-18 needs adjusting.

(Replaced EP 60-18A and calibrated EP and valve positioner)

WR# 35330

  1. 11 02-112 monitor system - reading high on control room records of 02 (Readjusted flow meters and recalibrated per ICP-201.2112 02)

WR# 35550 Scram Pilot solenoid valves #117 and #118 need rebuilding (rebuilt solenoids and performed timing test)

r' OPERATING DATA REPORT DOCKET NO. 50-220 DATE 12/10/85.

COMPLETED BY Th' onmnn TELEPHONE (3151349-OPERATING STATUS

1. Unit Name:

Nine Mile Point Unit T Notes

2. Reporting Period:

11/1/85 thru 11/30/85

3. Licensed Thermal Power (MWt):

1850 640

4. Nameplate Rating (Gross MWe):

620

5. Design Electrical Rating (Net MWe):

630

6. Maximum Dependable Capacity (Gross MWe): 610
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr..to.Date Cumulative

11. Hours in Reporting Period 720.0 8.016.0 142.081.2
12. Number Of Hours Reactor Was Critical 565.8 7.804.8 100.520.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On.Line 533.3 7,747.3 97,552.6
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 955,839.0 13.992,539.0 163,281,989.0
17. Gross Electrical Energy Generated (MWH) 320,977.,0,,

4,680,742.0 54,061,530.0

18. Net Electrical Energy Generated (MWH) 311.296.0 4.538.556.0 52.368.550.0'
19. Unit Service Factor 74.1 96.6 68.7
20. Unit Availability Factor 74.1 96.6 68.7 l
21. Unit Capacity Factor (Using MDC Net) 70.9 92.8 60.4 i
22. Unit Capacity Factor iUsing DER Net) 69.7 91.3 59.4
23. Unit Forced Outage Rate 25.9 3.4 15.5 1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eachl:

Refuel Outnne Scheduled for March 1986, Duration: 14 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l

26. Units in Test Status l Prior to Commercial Operation):

Forecast Achiesed I

INITIAL CRITICALITY INITIAL ELECTRICITY i

COMMERCIAL OPERATION j

(4/77)

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-220 UNIT NAME 9 Mile Pt- #1 DATE 12/10/85 -

i COMPLETED BY

-'l W Roma n Wa r REPORT MONTH Nnvomber 1085 1ELEPHONE (315)349-2422

-_E E

.5 E 3

j Y5 Licensee

[v, je, Cause & Corrective Na-DJ'c i

38

.s s &

Event

[?

93 Action to

$E jgg Repori a mO y'

Prevent Recurrence H

c5 851101 F

186.7 A

3 Turbine tripped and then reactor scrammed due to failure of feedwater flow control valve #12 i

1 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduteil A-Eiluipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Repor (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161) l'-Operator Training & License Examination F Administrative 5

G-Operational Ee ror (Explain)

Exhibit 1 Same Source 4

l'#/77)

Il4)ther (Explain) e O

O

r

. s,,

AVER \\GE D AILY UNIT POh ER LEVEL DOCKET NO.

50-220 UNIT 9 Mile Pt. #1 D.\\TE 12/10/85 CO\\lPLETED fly TW Roman TELEPilONE - (315)349-2 22

.\\lONTH Mnenmhat'- 10R(;

DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL tMWe-Net)

(SIWE.Neo I

itt 37 603 2

0 gs 606 3

'0 19 605 4

0 20 604 5

0 21 606 6

0 605 7

0 23 604-8 0

24 608 9

394 25 601 10 480 26 555 11 535 602 12 603

s 605 13 604 29 602 14 604 30 605 15-602 3,

16 606 INSTRUCTIONS On this format.hst the aserage dady unit power lesel m stWe Net for wh day in the rep. itmg m..nih. C.

the nearest whole rnegswsti.

/

3 (91771

4..

e 6

L.

m u

NMP-15170 NIAGARA MOHAWK POWER CORPORATION NI AGAR A MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE.N.Y 13202 December 10, 1985 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn:

Document and Control Desk Re: Docket No. 50-220 DPR-63

Dear Sir:

Submitted herewith is the Report of Operating Statistics and shutdown for November 1985 for the Nine Mile Point Nuclear Station Unit #1.

Also included is a narrative report of Operating Experience for November 1985.

Very truly yours, m8 fx

_homas E. Lempg s

Vice President Nuc1 car Generation TEL/tg Attachments cc: Director, Office of If,E (10 copies)

$ &