ML20138C322

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-325/86-08 & 50-324/86-09 on 860310-14.No Violation or Deviation Noted
ML20138C322
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/28/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20138C328 List:
References
NUDOCS 8604020459
Download: ML20138C322 (1)


See also: IR 05000324/1986009

Text

r

l'tilatd

v

i

March 28, 1986

holinaPowerandLightCompany

N: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NOS. 50-325/86-08 AND 50-324/86-09

On March 10-14, 1986, NRC inspected octivities authorized by NRC Operating

License Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed insp'ection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by)

Vincent W. Panciera, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-325/86-08

and 50-324/86-09 <

pc w/ encl:

4 . W. Howe, Vice President

g. Brunswick Nuclear

R. Dietz, Plant Project

General Manager

/ccw/ encl: 8604020459 860328

NRC Resident Inspector PDR ADOCK 05000324

Document Control Desk G PDR

State of North Carolina

RII RII RI /

UbV

CSmith:jw

..t isle

GB(el, ( .

CJu ian qq

N

redric son

3/ g/86 3/p/86

3{/86 3/A7/86 \\

\(- &I