ML20138C319
| ML20138C319 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/29/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20138C324 | List: |
| References | |
| NUDOCS 8512120547 | |
| Download: ML20138C319 (2) | |
See also: IR 05000414/1985052
Text
l$f
.
n 2 9 aos
Duke Power Company
YATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: REPORT NO. 50-414/85-52
On October 21 - 25, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within-the scope of the inspection,'no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Eh/e
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-52
cc w/ encl:
_9.L. Dick,VicePresident-Construction
VJ. W. Hampton, Station Manager
.
fccw/ encl:
K. N. Jabbour, NRR
Document Control Desk
.)NRCResidentInspector
tate of South Carolina
RII
RII
RI
- sa
TEconlon
t
11/7 /85
11p[g/85
11/
85
8512120547 851129
I
i
ADOCK 05000414
I
G
-
s e/
j
___