ML20138C319

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-414/85-52 on 851021-25.No Violations or Deviations Noted
ML20138C319
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 11/29/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20138C324 List:
References
NUDOCS 8512120547
Download: ML20138C319 (2)


See also: IR 05000414/1985052

Text

l$f

.

n 2 9 aos

Duke Power Company

YATTN:

Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NO. 50-414/85-52

On October 21 - 25, 1985, NRC inspected activities authorized by NRC Construction

Permit No. CPPR-117 for your Catawba facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within-the scope of the inspection,'no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Eh/e

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-414/85-52

cc w/ encl:

_9.L. Dick,VicePresident-Construction

VJ. W. Hampton, Station Manager

.

fccw/ encl:

K. N. Jabbour, NRR

Document Control Desk

.)NRCResidentInspector

tate of South Carolina

RII

RII

RI

AB

sa

TEconlon

AR

t

11/7 /85

11p[g/85

11/

85

8512120547 851129

I

i

PDR

ADOCK 05000414

I

G

PDR

-

s e/

j

___