Text
F
~
POW 34-04
-(
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING hEPORT REPORT NO.
85-09__
APPROVED BY:
d'-
h STATION MANAGER l
l 1
1 9
8512120536 850930 k
DR ADOCK 05000280 PDR
W i
(
Section Page 1
Operating Data Report - Unit #1 Operating Data Report - Unit #2 2
Unit Shutdowns and power Reductions - Unit #1 3
Unit Shutdowns and Power Reductions - Unit #2 4
Load Reductions Due to Environmental Restrictions - Unit #1 5
Load Reductions Due to Environmental Restrictions - Unit #2 6
Average Daily Unit Power Level-Unit #1 7
Average Daily Unit Power Level-Unit #2 7
l Summary of Operating Experience 8&9 Amendments to Facility License or Technical Specifications 10 II Facility Changes Requiring NRC Approval 1
Facility Changes That Did Not Require NRC Approval II Tests and Experiments Requiring NRC Approval 12 Tests and Experiments That Did Not Require NRC Approval 12 Other Changes, Tests and Experiments 13 Chemistry Report 14 Description of AB Instances Where Thermal Discharge Limits We.re Exceeded 15 Fuel Handling 16 & 17 Procedure Revisions That Changed the Operating Mode 18 Described in the FSAR Description of Periodic Tests Which Were Not Completed 19 Within the Time Limits Specified in Technical Specifications e
e-
1 gi
- t 4
Section Page Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Mechanical Maintenance Electrical Maintenance Instrument Maintenance 20 - 24 1
Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Mechanical Electrical Maintenance 25 - 28 Instrument Maintenance J
-~
l Page1 9
3 ADM-49 ATTACHM::KT 5 Page 1 of 3 OPERATING DATA REPORT EB 0 2 N
~
DOCKET NO.50-280 DATE 10-04-85 COMPLETED BY V. Tnrms TELEPHONE 357-3184 OPERATING STATUS 1.
Unit Name:
Surry # 1 Notes 2.
Reporting Period:
09-01-85 to 09-30-95 3.
Licensed Thermal Power (MWt):
2441 4.
Nameplate Rating (Gross MWe),:
847.5 5.
Design Electrical Rating (Net NWe): 7R8 6.
Mard - Dependable Capacity (Gross MWe): 820 7.. Mari-Dependable Capacity (Net MWe):
781 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
en 9.
Power Level To Which Rastricted. If Any (Net We):
- 10. Reasons For. Restrictions, If Any:
This Month Tr.-to-Date ~
Cu - lative
- 11. Hours In Reporting Period 770 n s: sci n 111oR1n
- 12. Number of Bours Reactor Was 675.1 5726.4 70103.1 critical
~
- 13. Reactor Reserve Shutdown Hours 0.0 0
3774.5 14.
Hours Generator On-Line 661.3 5620.4 68620.5
- 15. Unit Reserve Shutdown Hours 0.0 0
3736.2
- 16. Gross Thermal Energy Generated (WE) 1452418.8
_ 12807083.7 158821260.8 4
- 17. Gross Electrical Energy Generated (WE) 476030.0 4242300.0 51094263.0
- 18. Net Ilectrical Energy Generated (W E)
~
450015.0 4027160.0 48439004.0
- 19. Unit Service Factor 97_ n%
85.8%
61.1%
20.
Unit Available Tactor 07.0 %
Aq R%
64.6%
, 21. Unit capacity Factor (Using MDC Net) 80.0%
78.7 %
'55.4%
22.
Unit Capacity Factor 79.3 %
78.0 %
54.9 %
(Using DER Net)
- 23. Unit Forced Rate 11%'
2.8 %
14.7%
24.
Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25.
If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
Page 2 ADM-49 o
ATTACHENT 5 i
Page 1 of 3 m0tW OPERATING DATA PJ. PORT DOCI'ET NO. 50-281
~ '
DATE 10-04-85 COMPLETED BT V. Jones M " HONE 357-3184 CPERATING STATUS 1.
Unit Name:
Surrv 2 Notes 2.
Reporting Period:__ no-n1-RR m no ~4n-R; 3.
Licensed Thermal Power (s t):
9441 4
Nameplate Rating (Gross W e),:
947.5 5.
Design Electrical Rating (Net W e): 788 6.
hrinne Dependable Capacity (Gross MWe): 811 7.. h rinnm Dependable Capacity (Net MWe):
775 5.
If Changes Occur in Capacity Ratings (ltems Rus' er 3 Inrough 7) Since Last o
Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net We):
- 10. Reasons For. Restrictions, If Any:
l This Month Tr.-to-Date ~
Cummulative
- 11. Ecurs In Reporting Tariod 720.0 6551.0 108863.0
- 12. Number of Eours Raaetor Was Critical 720.0 4182.9 70189.I t
- 13. Reactor Reserve Shutdown Boers nn n
noi 14.
Ecurs Generator On-Line 720.0 4110.5 69018.I
- 15. Unit Reserve Shutdown Ecurs 0.0 0
0
- 16. Gross Thermal Energy Generated (EE) 1698732.0 9177680.1 161176085.4
- 17. Gross Electrical Energy Generated (W E) 551070.0 2940015.0 52230489.0
- 18. Net Ilactrical Energy Generated (MWE). -
522535.0 2782837.'0 49499279.0
- 19. Unit Service factor 100.0 %
62.7 %
63.4%
- 20. Vnit Available Tactor inn n%
so 7%
sfam
, 21. Unit Capacity Factor
~
(Using MDC Nat) 9 3.6 %.
54.8 %
's s.7%
- 22. Unit Capacity Tactor (Using DER Net) 92.1 %
53.9%
57.7 %
- 23. Vnit Forced Rate 0%".
.3%
13.8 %
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
sen % -/vnintoeanco in-11-Rs - in aave i
i l
25.
If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units.In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION (9/77)
e 1
{
50-280 f)oCKET No.
()NITSIIUIDOWNs ANI) POWER REDUC 190NS llNIT NAME Unit 1 l
i
- DATE 10-03-85 00Mrl.ETEI) BY V H Tnnne REr0RT MONill Sept - 1985 TEl.ErlHINE (804)357-31H3
- m 3
g"
~3 "" U licensee g,
Cause A Coeiecilve E
EI
]3 Event g,f Acilim to Wo.
Date
[
A f$
jg Repal #
Psevent Recussence g
e,i t-85-12 09-11-85 F
22.7 G
3 85-18 Reactor trip by turbine trip caused by inadvertant closing of the condenser inlet valves. Covers have been installed over the condenser inlet valve switches
,';j to prevent future inadvertant closing.
85-13 09-18-85 S
0.0
'A 1
Power reduced to allow repair of "A"
,/
main feed pumps discharge check valve. Power was reduced to 60%,
4 445 MW's.
85-14 09-27-85 S
36.0 11 1
Unit was taken off line due to hurricane threat.
I
\\
I i I
j i
2 3
4 Methat:
Enliibit G. Instrucilims F: Foscal Reasem:
A.Eilul mient Failure (Explain) 1 Manuel foe reepseation of Data l
S: Scheduled i
B Meineenance of Test 2-Manual Scism.
Entry Shecis im I.leensee C. Refueling 3-Automatic Screen.
Event Report (LER) File (NURLG-I D Regulatosy Restilethm 44)tleer (Emplain) 0161)
E Opeseine Tosining & IJcense Eneminsikm 5
F.Adannistestive Exhible 1 Same Souvec G-Operallonel Ervos (Emplain) l's/77) l10 her (Enplain)
I I
e i CKETN).
50-281 UNIT SiluistoWNS AND FOWER REDt)CIIONS
- DA1E 10-10-85 COMI'LE1 Ell fly V H Tnnne
]
REPORT MONill Sept.
j ptgy,,ggg (804) 3s7-3184
?
n.
i i
l "i.
w D
l.icensee gg g*l, Cause & Connective jE
)Yj No.,
D.ste
(
gg yee Event gg Acilon en I-oE j di Repost#
o, o l'sevent Recurrence 87-7 09-01-85 S
0.0 11 1
Power was reduced to 62%,500 MW's for load following.
87-11 09-19-85 S
0.0 11 1
Power was reduced to 79%,650 MW's for load following.
87-12 09-26-85 S
0.0 11 1
Power was reduced to 30%,210 MW's due
~
to hurricane threat.
87-13 09-30-85 S
0.0 11 1
Power was reduced to 82%,653 MW's for load following.
I 2
3 4
i F: Fenceil Reason:
Method:
Enlilbli G - Insisuctions
]
A Eigulpmene Failure (Emplain) 1 Manuel for rieparalloa of Data S: Stheduled ll Maintenance of Test 2 Manual Scism.
Entry Shecis for 1.lcensee C Refueling 3.Automalle Scssen.
Event Report (i.ER) File INUREG-l).Regulatiny ResieIcelon 4 Other (l!splain) 01611 E-Operaio Training & IJcense Emaniinallon 5
F-Aifminisisative Exhible 1 Same Source G.Opesailonial Ensus (Esplain) pl/77)
Il Other (Emplain)
Page 5 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. I MONTH:
September DATE
' TIM 5 HOURS-LOAD, W REDUCTIONS, W WH REASON 1 i r
NONE DUF.ING THIS REPORTING PERIOD 4
.[h b W S
.s 4
/
I
?
4+6
/
~..j.
f-
' A. '
s i
f
~.
f O'
.k, 9
b=
t
' w:
')
,s.
h
- t Y
f
(,
s,v
'a'%
r g
v-
.4
~
.'T MONTHLY TOTAL
?,G. * ;
1
5 Page 6 s
LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 2 MONTH: September l
- DATE, TIME HOURS LOAD, S' REDUCTIONS, s' MW REASON NC NE DURING THIS REPORTING PERIOD.
I e
S e
MONTHLY TOTAL 9
w
.,s e
VE,PLO A#ERAGE D41LW UNI T POWER DEvPL
.SummV Powem STAilog
~
SEPDEMBBA LE8S RbPORilNG MON DH. -
e DOCKE t NO. 50-280 DOCKET NO. 50-281 s
DATE OGir f*.19R5 COMPLETBD ev-v. jc4F5 m-UN I T UNB uN I I i w0 dvER A GE D AILN POWER L'E*El WWEMAGE DAILY poker LEVEL DAY.
-MwS-NGT-
- Mw D -NEei -
1 755 4 668.7 2
758 1 6Els5 3
754.3 736sa 4
751 0 74343,
5 751 0 76ess 6
752 9 74441 7
753 5 745sl 8
750.8 741-4 9
747 6 7 4 [.* 10 737 0
~7 4 725 II
,292 5 Tag.r m,
12
.97 8 737.n 13 ^~
410 3 737.2 14
$?
768 4 19547 15 772 1 74241'
~.
16 770.7 766.9 17 771 0 76049
^
~.
760s4 18 717.6 le 479 2 76949 74esr
'20 596.*8 755.'7 21 769 0 22 770 1 75R.4 23 769 4 757s4 24 765.8 766s1 25 76 8. 2 '
^,.
694.c 756.3 24 693.5
~
325.3 27 10 0 s'
28 62 1 76242 3
29 362 9 762.n 30 638 6 72644 ha m
- w -
g O
N e
w t
'/_'
Page 8
SUMMARY
OF OPERATING EXPERIENCE MONTH / YEAR SEPT. - 1985 Listed below in chronclogical sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE 09-01-85 0000 This reporting period begins with the unit at 100% power,790 MW's.
09-11-85 0945 Reactor trip by turbine trip, caused by inadvertant closing of the condenser inlet valves.
2224
' Reactor critical, e
09-12-85 0823 Unit online and increasing power at 3%/hr.
0900 Holding power at 30%,160 MW's for chemistry.
. 09-13-85 0130 Commenced power increase at 3%/hr.
09-14-85 0330 Unit at 100% power,805 MW's.
09-18-85 0355 Commenced power reduction, "A" Main Feed Pump not pumping properly.
0427 Holding power at 94%,760 MW's.
2137 Commenced power reduction to remove "A" Main feed pump from service, at 150 MW/hr.
2340 Holding power at 60%,445 MW's.
09-20-85 0510 "A" Main Feed Pump RTS, commenced power increase at 3%/hr.
2026 Unit at 100% power,810 MW's.
09-26-85 1906 Commenced power reduction due to potential hurricane effects at 150 MW's/hr.
4 2245 Holding power at 30%,200 MW's.
09-27-85 0023 Commenced plant shutdown at 150 MW/hr.
0203 Generator off the line.
0252 Reactor shutdown.
09-28-85 1106 Reactor critical.
1402 Generator on the line, increasing power at 3%/hr.
1505 Holding power at 30%,165 MW's for chemistry.
09-29-85 0550 Commenced power increase at 3%/hr.
09-30-85 1831 Unit at 100% power,805 MW's.
2400 This reporting period ends with the unit at 100% power,805 MW's.
_=
Page 9
SUMMARY
OF OPERATING EXPERIENCE MONTH / YEAR SEPT. - 1985 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT TWO 09-01-85 0000 This reporting period begins with the unit at 100% power 790 MW's 0010 Commenced power reduction at 150 MW's/hr for load following 0350 Holding power at 62%, 500 MW's.
0731 Commenced power increase at 150 MW's/hr.
1112 Unit at 100% power,790 MW's.
2325 Commenced power reduction at 150MW's/hr for load following 09-02-85 0310 Holding power at 53%, 400 MW's.
0706 Commence power increase at 150 MW's/hr.
1334 Unit at 100% power,790 MW's 09-03-85 0200 Commenced power reduction at 150 MW's/hr. for load following 0315 Holding power at 87%,700 MW's.
0503 Commenced power increase at 150 MW's/hr.
0605 Unit at 100% power,790 MW's 09-14-85 0248 Commenced power reduction at 150 MW's/hr for load following 0405 Holding power at 85%,700 MW's 0513 Commenced power increase at 150 MW's/hr.
1048 Unit at 100% power,800 MW's 09-19-85 0332 Commenced power reduction at 150 MW's/hr for load following 0511 Holding power at 79%,650 MW's 0550 Commenced power increase at 150 MW's/hr.
1205 Unit at 100% power,805 MW's 09-26-85 1904 Commenced unit ramp down due to hurricane threat at 150 MW's/hr 2345 Holding power at 30%,210 MW's 09-27-85 1425 Commenced power increase at 150 MW's/hr.
2051 Unit at 100% power,800 MW's 09-30-85 0025 Commenced power reduction at 150 MW's/hr for load following 0134 Holding power at 82%,653 MW's 0440 Commenced power increase at 150 MW's/hr 0700 Unit at 100% power,800 MW's 2400 This reporting period ends with the Unit at 100% power, 800 MW's
Page 10 AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS e
NONE DURING THIS REPORTING PERIOD U
I l
4 r
5 s
i
___.__-...n._
~~-
- ---^
~^
.,s.
.-r
.%+
9 w
, -...,,- -i. ~,-,-
e g
7 --
Page11 FACILITY CHANGES REQUIRING NRC APPROYAL NONE DURING THIS REPORTING PERIOD FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL DC 80-49 B & D TECHNICAL SUPPORT CENTER (TSC) 1&2 These two partial design changes built the TSC structure and added a radiation monitoring system to meet the requirements of NUREG-0696.
SUMMARY
OF SAFETY ANALYSIS
'The modification does not affect normal station operation or the operation of any safety-related equipment.
DC 83-38 APPENDIX R REACTOR COOLANT COLD LEG RTD CABLE TO REMOVE Unit 2 MONITORING PANEL (RMP)
Three new dual element RTD's were installed in RCS Loops A & B respectively. This design change wired out one element of each of these RTD's to temperature indicators located on the RMP. It is part of the overall Appendix R effort to include indication for additional reactor parameters in the Cable Tray Room, above the Control Room, at the RMP. -
SUMMARY
OF SAFETY ANALYSIS The modification enhances the availability of Reactor Parameter indication in the event of a fire.
4 p.,,,.
ween-.-
-==e-w
-- w
Page 12 TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL NONE DURING THIS REPORTING PERIOD TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL NONE DURING THIS REPORTING PERIOD 9
4 m..,_n.---n-
..ne..e, we
Page 13 OTHER CHANGES, TESTS AND EXPERIMENTS NONE DURING THIS REPORTING PERIOD W
9 l
t-
PG: 25-05 Page 14 VIRGINIA FG;ER SURRY PGER S3 TIT CEEMISRY FIPOR:'
SEPTmBER 19 85 PN m.T L.IT NO. 1 IL'IT 10. 2 ASTJLYSIS D.XDm MINDIE AVER;2 M72IFIN MINDIE AVERAGE 3ross Radioact., uCi/ml 1.54E+0 2.21E-1 9.70E-1 1.41E-1 4.42E-2 7.87E-2 Suscended Solids, c:2n 0.00 0.00 0.00 0.00 0.00 0.00 3ross Tritium, uCi/ml 9.39E-2 1.46E-2 5.04E-2 2.39E-1 3.15E-2 1.23E-1 11 Icdine
, uCi/cl 1.09E+0 1.39E-2 2.65E-1 2.41E-4 4.04E-5 1.25E-4 1
133 I
/I 0.46 0.19 0.26 0.22 0.05 0.13
- Evdrocen, cc/ke 42.4 32.5
- 36. 5 -~~
42.2 26.7 31.8 Mthitn, c:2n 1.29 0.79 0.98 1.54 1.28 1.41 Boron-lo, c:2n*
145 81 100 171 147 155 Qxvoen, (D.O.), c:2n 0.005 0.005 0.005 0.005 0.005 0.005 Chloride, c:2n 0.01 0.01 0.01 0.01 0.01 0.01 pH @ 25'C 6.87 6.54 6.72 6.85 6.35 6.58
- Bomn-10 = 'Ittal Baron x 0.196 RDF.RKS: Unit 1: Cat bed was not olaced in servica thic mnnth for Lim ramnval. tim added on 9-12, 9-26, 9-28 for a 'Ibtal of 2110 ans. Fanctor Trio on 9-11-85 at 0947.
Reactor critical at 2225 on 9-11-85.
St artad rum,ino unit anwn on 4-1R-Rs fnr Foods.rntar problems, unit went down to 60%. At 9-20-85 ramwl unit un on 9-20-As at Oslo at %
per hour. At 9-26-85 at 1900 started ramnina unit down for hurricana alnrine unit nff line at 0204. At 9-28-85 at 1402 unit hack on lina.
A+
9 to-9s eartaa ram,ino un 3% per hour. Unit 2: Cat bed olacad in aarvica on 4-R-As. 4-14-ns. o-?n-nq fnr T.im Removal. Lim added on 9-2-85. 9-27-Rs fnr a tntal nf 6an mmc.
fin 4 + crwmoncaa inna followina 9-14-85 at 0253, 9-15-25 at 0140.
At 4-?6-Rs n+- l onn erne.,a ram, den.m fnv' l
hurricane Gloria. Unit went down to 29% and held. Started raping up at 9-27-85 at 1430.
m
_,__a.
A A
i ---- -,-
8 Page 15 DESCRIPTION OF ALL INSTANCES WHERE THERMAL DISCHARGE LIMITS WERE EXCEEDED NONE DURING THIS REPORTING PERIOD r
+
4
)
4 l
4 L
3 i
l
Page 16 FUEL HANDLING l
UNIT #
1 DATE NO. OF ANSI NO.
NEW OR SPENT FUEL SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL NONE DUR: NG THIS REPORTIN"2 PERIOD i
y.-n
...-------~.ne~-.
e
- - +
Page 17 FUEL HANDLING UNIT 5
?
DATE NO. OF ANSI NO.
NEW OR SPENT FUEL SHIPPED / RECEIVED ASSEMBLIES PER S$IPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL NONE DURING THIS REPORTING PERIOD e
\\
-e.
g ee-e=-e-w hp+e==Eum d***ee**
W e *
--a w
~, - -., -,-
f Page 18 l
PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR NONE DURING THIS RPEORTING PERIOD 1
4 e
i f
1 4
i 4
- -.. -. ~ - -..
V Page 19 4
9 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMrIS SPECIFIED IN TECHNICAL SPECIFICATIONS NONE DURING THIS REPORTING PERIOD 9
e p...ge. p.
,mp m e rem meGe @=mw&
- e' Dee 6-@Amasagmp ewtm e.e-me
-e%eemong. g
- M e.,4 w eg,meemm.
,.mam, y,p..
_q h
Page 20 i
MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS l
UNIT NO. I The below listed codes denotes the following departments:
Mechanical i
0228 or R03 Electrical 0229 or R04 t
Instruments I
0237 or T22 i
e 0-e I
a e
b
,r
+w-
.w-.-
Page 21 KPCO SAFETY REfATED DLRING pmrvn POER SDRTED BY LNIT AND DEPARTENT PROGRAM IFT09860 10/02/85 13:40 FROM 09/02/85 THtu 09/02/85 LMIT 01 SLRRY RETIRED TO WO DEPT SERVICE MMK M.MBER NLMBER WO TITLE HISTORY SLMMARY 0228 09/02/95 01-9W -TCV -108A 023868 IA SUPPLY LIE TO TCV BROKEN REPLACED FITTING ON REGLLATOR 0237 09/02/8$ 01-SSP-Afti -664 023867 OP DELTA T RUNBACK SETPOINT ENTERED CH2 W/ BASE CONDITION, FOUND GP T FLNCTION GEERATWt IMD DRIFTED ADAETED llSING PT 2.1B 1
__,_,-r vv
.-,,,,-T-
~
r
]
Page 22
[
SAFETY REi.ATED DLRING REDUCED POER SORTED BY UNIT AND DEPARTMENT PROGT M WPT09860 10/02/85 13:16
- JEPCO FROM 09/11/85 Tsu 09/13/85 LNIT 01 SLRRY RETtRED TO WO DEPT SERVICE MARK HlNBER NLNBER WO TITLE HISTORY SUHrtARY 0228 09/13/85 01-BD -FE -102B 024190 REINJECT WITH FURMANITE INICTED CLAW WITH FLRMANITE NUCLEAR GRADE COMP 0lND.
0228 09/13/85 01-CH -P
-1C 001589 OUTBOARD BEARING HOUSING HAS INVESTIGATED W.O. & FOUND NO LEAKS.
LUBE DIL LEAK AS FER M. SMALL(IPS) PT WAS RLN ON Plw 9-6 Tmu 9-9 AND NO LEAKS ERE FOLND.
0228 09/13/85 01-RH -P
-1B 024154 LOW MOTOR OIL LEVEL (UPPER REPLACED OIL AER INDUS 46 MOTOR BEARING 0228 09/13/85 01-VS -P
-1A 022480 PACKING LEAK ADJUSTED PACKING ON PL W 0229 09/11/95 01-RC -P
-1A 024274 HI/LO OIL LEVEL ALARM IN, DRAIN 2 GALS DIL FROM LNER F0T, REPAIR / CLEAR ALARM CLEAE ALNtM 0229 09/13/85 01-FP -P
-2 023662 REPLACE BOTH J.ATTERIES ON 'B' FINISED EW-C-EPDC SAT. REPt. ACED B BANK OF FUIRr PUMP UIE!iEL ATTDtIES ON "B" BAE 5' DI N FIRE Ft w P0 SY-15566
(
0237 09/11/85 01-RPI-ROD -NA 024303 ROD POSITION INDICATORS G-3 &
CECKED IRPI, OP SAT.
F-12 0237 09/12/85 01-CC -P
-1B 020944 CALIBRATE TE PRESSLRE GAUGE CALINtATED PRESSLRE GAUGE.CECKED SAT PT SENT TO ENGIEERING 0237 09/12/85 01-CC -PI -105A 019553 DISH PRESS GUAGE OF INVESTIGATED AND FOUND GAUDE NOT ISO (Di. CALIWtATED GALE CK GC l-CO-P-l A IS BROKEN REPLACE PT SENT TO ENGIEERING.
0237 09/12/85 01-CN -LI -110 023465 LOCAL INDICATION, INDICATES 2' PERFORMED LOOP CALIBRATION ADJ!STED TRANSMITTER AND INDICATOR TO io.
WITHIN SPECS OP SAT 0237 09/12/85 01-HI -MISC-N-35 024282 SET COWENSATING VOLTAGE ADJUSTED COW. VOLTAE AS PER CAL 048 0237 09/12/85 01-RI -#N -D-G-4 018470 RAISE SETPOINT FROM 135 DEG TO REPLACED RTD AND CALIBRATED LOOP UNER WO6011875 TEF READING e 215 DEG 100F ALARM CLEAR 02 09/12/85 01-RM -RR -175 023828 REPLACE I E PADS ON RR-175 REPLACED IE PENS IN IE ELL WITH SPARES FROM SHOP 0237 09/12/85 01-RPI-ROD -B-6 023907 CALIBRATE, READS LOW 221 CECKED B6 INDICATION #4D FOLND NO PROBLEM. RETlRED TO SERVICE AND NOW READING 220 STEFS 0237 09/12/05 01-VG -RM -131-2 023993 EQUIPENT FAILURE LIGHT LIT, FAIUJtE LIGHT INDICATED IMPROPER REPAIR CECK SOLRCE (PERATION. ACTUATED CECK SOLRCE NLDEROUS TIES. FOUND OPERATION TO BE PROPEP 0237 09/13/95 01-CH -TI -NA 016999 AUX LUBE OIL TERM 0ETER DN REPLACED TERM 0ETER WITH EW 1*CH-P-lC HA9 BROKEN METER CALIMRAT E W E FACE
Page 23 KPC0 RELATED DIEING REDUCED POWER SORTED BY UNIT AND DEPARTMENT PR00 RAM WT09860 10/02/85 13:20 FROM 09/19/85 TlftU 09/20/85 INIT 01 SLRRY RETURED TO WO DEPT SERVICE MARK NLMBER HUMBER WO TITLE HISTORY SUPMARY 0036 09/20/85 01-FH -CRN -15 024500 NDE St.PPORT, AUX HOOK AS NDE FERSONEL FERFORED MT INSPECTI REQUIRED.
0228 09/19/95 01-FH -CRN -15 024496 REPAIR AUX HOOK CABLE NEEDS TO REWOLND CABLE NDT INSPECTOR OF BE PUT BACK ON DRUM M
0228 09/20/85 01-CC -P
-1B 022057 PUPF T)ftUSTING EXCESSIVELY OUT DISASSEMBLED INSPECTED AND REBUILT.
FOUND EXTSSIVE TMtUST AND ICT BOARD SEAL LEAKING LOOSE.
0238 09/19/85 01-PG -MOV -107B 016038 INSLLATION AROLND VALVE B0p6ET INGLLATED B004ET
Page 24 KPCO SAFETY RELATED DLRING REDUCED POER SORTED BY LNIT AND DEPARTENT FROGRAM WPT09860 10/02/85 13:25 FROM 09/26/85 T)MJ 09/29/85 LMIT 01 SLRRY RETIRED TO WO DEPT SERVICE MARK NLMER HUMBER W TITLE HISTORY SLMMARY 0237 09/26/95 01-CH -P
-2B 019861 CALIBRATE TE PRESSLRE GAUGE REPLACED GAUGE WITH A CALIBRATED GAUGE 1-PRESSLRE GAUGE SN 81487126 0237 09/26/85 01-CS -LI -101C 023830 CALIBRATE LEVEL. INDICATOR, CECK INDICATOR, ND PROBLEM F0tMD GP CECK SAT. PT SENT TO ENGIEERIN G
l L
p.
Page ' 25 8
MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 The below listed codes denotes the following departments:
Mechanical 0228 or R03 Electrical 0229 or R04 Instruments 0237 or T22 6
O 4.-
Page 26 l
SAFETY hELATED DURING REDUCED POWER SORTED BY UNIT MD DEPARTMENT PROGRAM WPT09860 10/02/85 13116
' 8EFC0 FROM 09/11/85 T}ftU 09/13/85 LNiT 02 SLRRY REMED TO WO DEPT SERVICE MARK NLMBER HUMBER WO TITLE HISTORY
SUMMARY
0228 09/11/85 02-MS -
-107 005401 REPLACE HANMEEL REFLACED HANDWEEL 4208252'A 0228 09/11/85 02-MS -TV -201B 021911 ELIOW (90) MS CRACK ON INSIDE INSTALLED TE)FORARY SOFT PATCH 0228 09/13/85 02-RS -NOV -256A 021272 REPLACE PIN IN LIMITOROLE UNBOLTED LIMITORQUE AND REMOVED REFLACED OLD PIN WITH EW OE AND REPLACED LIMITOROLE.
0228 09/13/85 02-SW -MISC-220 001104 REFLACE OR REPAIR WELL ITSELF FAB EW LEl.L AS PER EWR 83-12 0237 09/12/85 02-RC -PCV -2456 020028 ALARMS, SWITCH & VLV POSITIONS PERFORED PT 2.26 NO PROBLEM FOLND. PT SENT TO ENGIEERING 0237 09/13/85 02-EPC-PC -1AC 024339 (ROENT FAILtRE FTlWER CABIET REPLACED TE PHASE CONTROL CARD FOR CONTROL BAE
'A' GROLF 1. OP CECK SAT.
l i
)
F
. 4 Page 27 KPC0 SAFETY RELATED DLRING prTn poler SORTED BY UNIT AND DEPARTENT PROGRAM WT09860 10/02/85 13 20 FROM 09/19/95 TEU 09/20/85 LNIT 02 SWRY REERED TO W
DEPT SERVICE MARK MMBER M99ER W TITLE HISTORY St# MARY 0229 09/20/95 02-CH -LCV -2115C 021110 SMALL PACKING LEAK ADJUSTED PACKING TO STOP LEAK E
a
a,,.
Page 28 KPCO SAFETY RELATED REING pmrnt POER SORTED BY UNIT AND DEPARTENT PROGRAM WT09860 10/02/85 13825 FROM 09/26/85 T)ftU 09/29/95 LNIT 02 SLRRY REfURNED TO WO DEPT SERVICE MARK NLMBER MJMBER WD TITLE HISTORY
SUMMARY
0237 09/26/95 02-NI -DETR-B 022182 DETECTOR IRIVE ECHANISM CAN-REPLACED DETECTOR.PERFORED IMP FOR CECKOUT. OPS SAT
, END OF REPGtT a
O 6
4 VIuGINIA ELucTurc Ann Powna Cowi>Axy RicuxoNo,V wGINIA 20261 W.L.STuwant Vaca Passansur Noctuan OPSBATIONs October 15, 1985 Mr. Maurice R. Beebe Serial No.85-727 Office of Resource Management N0/DAS:acm U. S.. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32
Dear Mr. Beebe:
DPR-37 VIRGINIA ELECTRIC AND POWER COMPAhT SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of September, 1985.
..Veiy tr
- yours,
\\\\
W."L. Stewart Enclosure (3 copies) cc:
Mr. J. Taylor, Director (12 copies)
Office of Inspection and Enforcement Dr. J. Nelson Grace (1 copy)
Regional Administrator Region II-Mr. D. J. Burke NRC Resident Inspector-Surry Power Station sfl
.