Proposed Tech Specs,Revising Calibr of Portable Gamma & Neutron dose-rate Measuring Instruments
ML20138B253
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/09/1985
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20138B251 List:
References
NUDOCS 8510150303
Download: ML20138B253 (2)


Text

- _ _ _ - _ ______-_________ __ _ __ _-_____ _____________ ____-__- _ ___ -_ _____

.'?

i -

ATTACHMENT Consumers Power Company Big Rock Point Plant Docket 50-155 4-t 1

PROPOSED TECHNICAL SPECIFICATION PAGE CHANGES October 9.,

1985 L

4 5

t RM*2188R8t&8h t 'a' P

PM IC1085-0303-NLO4

~

' eg-i c

l 4~

62

~

6.4.2 (Contd)

(c) The containment atmosphere shall be monitored by two high range f

c gamma monitors. The_ monitors are designed to measure gamma

. radiation in containment under accident conditions from 1 R/hr to 1E+06 R/hr. The monitors are located external to the 4

containment sphere. The readouts of the monitors are located in j

t the control room.

Both.high range containment atmosphere gamma monitors.shall i

normally be in service during power operation.

If either g

monitor is inoperable.. restore to operable status within I

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or, in lieu of any other report required by

}

Specification 6.9.2 (administrative controls), prepare and l

submit a Special Report to the Commission pursuant to i

Specification 6.9.3 (administrative controls) within the next

.30 days outlining the cause of the inoperability and the plans i

for restoring.the system to operable status. A channel check j

shall be performed for each monitor at least once per month, and a

j channel calibration shall be performed at each refueling outage.

l The channel calibration for all ranges above 10R/hr may be performed by electronic. signal substitution.

(d) Portable gamma dose-rate measuring instruments and portable l

neutron dose-rate measuring instranents shall be provided for establishing permissible working Itaits. - These instruments shall be calibrated at least once every three months.

I i

f i

i j

6.4.3 Reactor Water Level Monitors in the Reactor Depressurization System i

}

Four narrow range water level monitors are provided in the main control room as part of the Reactor Depressurising System to be used l

for detection of adequate core cooling during accident situations.

2

'At least two reactor water level indicators in the Reactor l

Depressurization System shall be operable during power operation.

t i

I l

1 I

1 5

4 1

l 3

t Proposed

-TSB1085-0303-NL04-l

~ - -

- -.