Text
- _ _ _ - _ ______-_________ __ _ __ _-_____ _____________ ____-__- _ ___ -_ _____
.'?
i -
ATTACHMENT Consumers Power Company Big Rock Point Plant Docket 50-155 4-t 1
PROPOSED TECHNICAL SPECIFICATION PAGE CHANGES October 9.,
1985 L
4 5
t RM*2188R8t&8h t 'a' P
PM IC1085-0303-NLO4
~
' eg-i c
l 4~
62
~
6.4.2 (Contd)
(c) The containment atmosphere shall be monitored by two high range f
c gamma monitors. The_ monitors are designed to measure gamma
. radiation in containment under accident conditions from 1 R/hr to 1E+06 R/hr. The monitors are located external to the 4
containment sphere. The readouts of the monitors are located in j
t the control room.
Both.high range containment atmosphere gamma monitors.shall i
normally be in service during power operation.
If either g
monitor is inoperable.. restore to operable status within I
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or, in lieu of any other report required by
}
Specification 6.9.2 (administrative controls), prepare and l
submit a Special Report to the Commission pursuant to i
Specification 6.9.3 (administrative controls) within the next
.30 days outlining the cause of the inoperability and the plans i
for restoring.the system to operable status. A channel check j
shall be performed for each monitor at least once per month, and a
j channel calibration shall be performed at each refueling outage.
l The channel calibration for all ranges above 10R/hr may be performed by electronic. signal substitution.
(d) Portable gamma dose-rate measuring instruments and portable l
neutron dose-rate measuring instranents shall be provided for establishing permissible working Itaits. - These instruments shall be calibrated at least once every three months.
I i
f i
i j
6.4.3 Reactor Water Level Monitors in the Reactor Depressurization System i
}
Four narrow range water level monitors are provided in the main control room as part of the Reactor Depressurising System to be used l
for detection of adequate core cooling during accident situations.
2
'At least two reactor water level indicators in the Reactor l
Depressurization System shall be operable during power operation.
t i
I l
1 I
1 5
4 1
l 3
t Proposed
-TSB1085-0303-NL04-l
~ - -
- -.