ML20137Z844

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-293/86-03 on 860122-24.No Violation Identified
ML20137Z844
Person / Time
Site: Pilgrim
Issue date: 03/06/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20137Z848 List:
References
NUDOCS 8603130175
Download: ML20137Z844 (2)


See also: IR 05000293/1986003

Text

<

.

.

6

.

MAR 0 61986

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 0?l99

Gentlemen:

Subject: Inspection No. 50-293/86-03

This refers to the routine safety inspection conducted by Mr. W. J. Lazarus

and others on January 22-24, 1986 at the Pilgrim Generating Station, Plymouth,

Massachusetts, of activities authorized by NRC License No. OPR-35, and to

discussions of our findings held by Mr. Lazarus with Mr. R. Silva of your

staff at the conclusion of the inspection.

The area examined during this inspection was confined to followup of findings

identified during previous emergency preparedness inspections and exercises. A

copy of the NRC Region ! Inspection Report is enclosed with this letter.

Within this area, the inspection consisted of selective examinations of pro-

cedures and representative records, interviews with licensee personnel, and

observations made by the inspectors.

Within the scope of this inspection, no violations were identified and no

response is required.

Your cooperation with us in this matter is appreciated.

Sincerely,

Or e irni Cf ~ ~ "

.

'

Llkl(L

~ @ omas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-293/86-03

B603130175

PDR AW f50oo293

PDR

G

OFFICIAL RECORD COPY IR PILGRIM 86-03 - 0001.0.0

02/25/86 , - -

TOD

do

-

'

. .

Boston Edison. Company M/C Nuclear 2

.

cc w/ encl:

A. V. Morisi, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

E. J. Graham, Compliance Group Leader

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

FEMA', RI

bec w/ encl:

Region I. Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, ORP

W. Raymond, SRI, Vermont Yankee

T. Shediosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

I. 5 SS

Lazarus /geb Harpster Be)amy

y @86 I (p 8 h 90

0FFICIAL F ECORD COPY IR PILGRIM 86-03 - 0001.1.0

02/25/86