ML20137Z661

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Repts 50-454/86-08 & 70-1916/86-01 on 860219.No Violation Noted.Open Item Re Failure to Submit Required Documentation Identified
ML20137Z661
Person / Time
Site: Byron, 07001916  Constellation icon.png
Issue date: 03/07/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19276D298 List:
References
NUDOCS 8603130090
Download: ML20137Z661 (2)


See also: IR 05000454/1986008

Text

St}D

.

MAR 0 71986

Docket No. 50-454

Docket No. 70-1916

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safeguards inspection conducted by Messrs.

T. J. Madeda and J. L. Belanger of this office on February 19, 1986, of

activities at the Byron Nuclear Power Station, Units 1 and 2 authorized by

NRC Operating License No. NPF-37 and NRC Special Nuclear Material License

No. SNM-1916 and to the discussion of our findings with Mr. R. Querio at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection; however, one open item regarding failure to submit some required

documentation was identified.

A description of your proposed action is

described in Section 4 of the Report Details.

Please advise us if our

understanding of your action is incorrect.

Areas examined during the inspection concern a subject matter which is exempt

from disclosure according to Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

j '3'>

/

/h' ' ' 0 .

'

cl. .

,

ATTACHMENT CONTAHl3 W

!

10 CFR 2.790(d) UWO j,i

B603130090 860307

s

.u., h u-

PDR

ADOCK 05000454

i %' .,m

G

PDR

-

y: ' ) ?

L

_.- .

-

Commonwealth Edison Company

2

MAR 0 71986

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

)

W.

. Axe son, Chief

Nuclear Materials Safety

and Safeguards Branch

Enclosure:

Inspection Reports

No. 50-454/86008(DRSS);

No. 70-1916/86001(DRSS)

(PART 2.790(d) INFORMATION)

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

cc w/ enclosure, w/o PART

2.790(d) INFORMATION:

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

ATTACI'!EtiT CONTAlll3

10 CFR 2.790(d) Bf0

D

RIII

III

RIII.

R JI

j

RIII[

6

9

h'O.

b

Madeda/jp

Belanger

reed

Fdtn5y

A

o

~

)