Forwards Safety Insp Repts 50-456/86-09 & 50-457/86-08 on 850912-860224.No Violation Noted
ML20137Z408
Person / Time
Site: Braidwood  
Issue date: 03/07/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137Z414 List:
References
NUDOCS 8603130034
Download: ML20137Z408 (2)


See also: IR 05000456/1986009

Text

.

,

MAR 7

1986

Docket No. 50-456

Docket No. 50-457

l

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

i

Post Office Box 767

Chicago, IL 60690

,

Gentlemen:

This refers to the. routine safety inspection conducted by Messrs.

J. W. Muffett and J. M. Jacobson of this office on September 12, 26,

,

October 29, November 19-21, December 19, 1985 and February 18, 24, 1986,

of activities at Braidwood Station, Units 1 and 2 authorized by NRC

.

Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion

of our findings with Mr. D. Shamblin at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations and

interviews with personnel.

~

No violations of NRC requirecents were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

!

We will gladly discuss any questions you have.concerning this inspection.

.

'

Sincerely,

9

t... , *. ' . ~.. a

'

,;.

8603130034 860307

PDR

ADOCM 050C0456

J. J. Harrison, Chief

0

PDR

Engineering Branch

Enclosure:

Inspection Reports

No. 50-456/86009(DRS);-

No. 50-457/86008(DRS)

See Attached Distribution

RIII J

RI

RIII

RIII

RIII

h/M'sp&

4

-

ddAA

]

Li

/bls

rrison

d

son

Muffett

acob n

3l4

_

bh

Eb

hhl%

,/<

E

.2* 0/

E

1

...

'

Commonwealth Edison Company

2

~ MAR 7-

1985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

,

'

Superintendent

P. L. Barnes, Regulatory

i

Assurance Supervisor

DCS/RS8 (RIDS)

Licensing Fee Management Branch

j

Resident Inspector, RIII

Braidwood~

.

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

'

Control Division

D. W. Cassel, Jr., Esq.

'J. W. McCaffrey,. Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

j

Division

1

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

'

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

I

.