ML20137X643

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 970223-0405.Violation Noted:On 970304,during Pressurizer Cooldown Operation, Operator Failed to Properly Verify That Pressurizer Cooldown Rate Was within Limit of 200 F in Any 1 Hr Period
ML20137X643
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/15/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20137X597 List:
References
50-362-97-05, 50-362-97-5, NUDOCS 9704220104
Download: ML20137X643 (1)


Text

.-..

=-

j..

j r,

t ENCLOSURE 1 i

NOTICE OF VIOLATION l

Southern California Edison Co.

Docket No.:

50-362 l

San Onofre Nuclear Generating Station License No.:

NPF-15

)

-1 During an NRC inspection conducted on February 23 through April 5, l'.,97, one violation

{

of NRC requirements was identified. In accordance with the " General Statement of Policy l

and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

i i

A.

Technical Specification Surveillance Requirement 3.4.3.1.1 requires, in part, during a pressurizer cooldown operation, to verify at a frequency of 30 minutes that the l

pressurizer cooldown rate is within the limit of 200 F in any 1-hour period.

Contrary to the above, on March 4,1997, during a pressurizer.;ooldown operation, j

a pressurizer cooldown rate of about 265 F in a 1-hour period occurred because the l

operators failed to properly verify that the pressurizer cooldown rate was within the

.l limit of 200 F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.

1 i

This is a Severity Level IV violation (Supplement 1) applicable to Unit 2 (Violation 361/97005-01).

Dated at Walnut Creek, California, this 15th day of April 1997 i

i t

i c

l I

l 9704220104 970415 PDR ADOCK 05000361 G

PDR 1

\\

-