Southern California Edison Co.
Docket No.:
50-362 l
San Onofre Nuclear Generating Station License No.:
)
-1 During an NRC inspection conducted on February 23 through April 5, l'.,97, one violation
{
of NRC requirements was identified. In accordance with the " General Statement of Policy l
and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:
i i
A.
Technical Specification Surveillance Requirement 3.4.3.1.1 requires, in part, during a pressurizer cooldown operation, to verify at a frequency of 30 minutes that the l
pressurizer cooldown rate is within the limit of 200 F in any 1-hour period.
Contrary to the above, on March 4,1997, during a pressurizer.;ooldown operation, j
a pressurizer cooldown rate of about 265 F in a 1-hour period occurred because the l
operators failed to properly verify that the pressurizer cooldown rate was within the
.l limit of 200 F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.
1 i
This is a Severity Level IV violation (Supplement 1) applicable to Unit 2 (Violation 361/97005-01).
Dated at Walnut Creek, California, this 15th day of April 1997 i