ML20137X533

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/85-39 on 850910-13.No Violation or Deviation Noted
ML20137X533
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/25/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20137X539 List:
References
NUDOCS 8510040535
Download: ML20137X533 (1)


See also: IR 05000302/1985039

Text

'

SEP 2 5 1985

Florida Power Corporation

/ ATTN: Mr. W. S. Wilgus

Vice President Nuclear Operations

P. O. Box 14042, M.A.C. H-2

St. Petersburg, FL 33733

Gentlemen:

SUBJECT:

REPORT N0. 50-302/85-39

On September 10-13, 1985, NRC inspected activities authorized by NRC Operating

License No. DPR-72 for your Crystal River facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-302/85-39

c.c w/ encl:

4 . M. Howard, Director

vM, Site Nuclear Operations

F. McKee, Nuclear Plant Manager

J. R. Westafer, Manager

Nuclear Operations Licensing

and Fuel Management

bpc w/ encl:

8510040535 e50925

ADOCK L'OO

2

1RC Resident Inspector

{DR

. Document Cont ol Desk

State of Flciida

!

RII

RII

-

FJa

9/b /85

'

A RH0 Fd t-

Y

M

9Qj/55

9/ /35

,

1

j