2098 OfficialTransen/MS7~ pt cf Proceedings

'O NUCLEAR REGULATORY COMMISSION l

Title:

advisory Committee on Reactor Safeguards  !

Materials and Metallurgy Subcommittee 1

TRO4 (ACRS)

RETURN ORIGINAL l TO BJWHITE I Docket Number: (not applicable) ws m 2s2s 41 -7139 i Th un:_; .

, l Location: Rockville, Maryland m

V Date: Tuesday, April 15, 1997 2

AORS TYE 6py- Minx o\

O ~. ' e ~

' "e 0". t' O v*0 ~ R:':ee Work Order No.: NRC-1080 Pages 1-89 j g42 g o 97o415 T-2098 PDR NEAL R. GROSS AND CO., INC.

oy000e Court Reporters and Transcribers .

1323 Rhode Island Avenue, N.W. p;_ ._

w/ Washington, D.C. 20005 'g7 ] I (202) 234-4433  : i 3 j}_\ J Q j idi i I L-I:lllllllllCllilll:ll!!Jllfl:ll'

1 1 UNITED STATES OF AMERICA

,-s 2 NUCLEAR REGULATORY COMMISSION

, I L.J 3 +++++

4 MEETING 5 +++++

6 ADVISORY COMMITTEE ON REACTOR SAFEGUARDS (ACRS) 7 MATERIALS AND METALLURGY SUBCOMMITTEE 8 +++++

9 TUESDAY, 10 APRIL 15, 1997 11 +++++

12 ROCXVILLE, MARYLAND 13 +++++

,~

s  ?

C ./ 14 15 The Subcommittee met at the Nuclear Regulatory 16 Commission, Two White Flint North, Room T2B3, 11545 17 Rockville Pike, at 1:00 p.m., William J. Shack, Chairman, 18 presiding.

19 l 20 MEMBERS PRESENT:

21 WILLIAM J. SHACK Chairman 22 THOMAS S. KRESS Member Member l 23 ROBERT L. SEALE 24

) 25 NEAL R. GROSS l COURT REPORTERS AND TRANSCRIBERS l l 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234 4433

i 2

1 ACRS STAFF PRESENT:

( g, 2 NEAL DUDLEY 3

4 ALSO PRESENI:

5 STEPHANIE COFFIN 6 KURT COZENS 7 ROBERT HERMAN 8 JOE MUSCARA 9 JACK STROSNIDER 10 TED SULLIVAN 11 12 13

, ['T

'tj 14 15 l 16 17 18 19 20 21 22 i

j 23 24

,< ~x 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS i

1323 RHODE ISLAND AVE., N W.

l (202) 234 4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

3 1 A-G-E-N-D-A

'~T 2 Acenda Item Pace  !

\.-.]

~

3 Opening Remarks 4 4 GL: Degradation of SG Internals 13 5 Background on GL: Use of UT in 6 Inservice Inspections (ISI) 28 l 7 GL: Use of UT in ISI 64 8

l 9

10 11 12 13 (m

l )

Ns' 14 15 16 17 18 19 20 4

21 22 23 24

/m

! 't

\ / 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234 4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

4 1 P-R-O-C-E-E-D-I-N-G-S t

(1:09 p.m.)

' (~3

> u 2

5.,I 3 CHAIRMAN SHACK: The meeting will now come to l

4 order. This is the first day of the meeting of the ACRS l l

5 Subcommittee on Materials and Metallurgy. I am Bill l l

c Shack, Chairman of the Subcommittee. I 1

7 I have a conflict of interest with some of the  !

l 8 topics of today's meeting. During the discussion of those ]

1 9 topics, Dr. Robert Seale will serve as Chairman. l I

10 The ACRS members in attendance today are Tom {

11 Kress and Bob Seale. The purpose of this meeting is to i I

12 hold discussions with representatives of the NRC Staff and j

,_s 13 Consumers Power Company concerning generic letters l

/ )

\/ 14 associated with steam generator tube inspection 15 techniques, effective use of ultrasonic testing techniques 16 and in-service inspection programs, degradation of steam 17 generator internals and degradation of precsure vessel l

18 head penetrations.

19 We will also discuss the status of issues 20 related to pressure vessel integrity. The Subcommittee 21 will gather information, analyze relevant issues and 22 facts, and formulate proposed positions and actions, as l 23 appropriate, for deliberation by the full Committee.

24 Noel Dudley is the Cognizant ACRS Staff

_7

(,) 25 Engineer for this meeting.

i NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 2344433

l l 5 l

1 The rules for participation in today's meeting l

2 have been announced as part of the notice previously

,f S U 3 published in the Federal Recister on April 4, 1997.

4 A transcript of the meeting is being kept and l

5 will be made available as stated in the Federal Reaister l

6 Notice. It is requested that speakers first identify 7 themselves and speak with sufficient clarity and volume so 8 that they can be readily heard.

l 9 We have received no written comments or 10 requests for time to make oral statements from members of 11 the public.

12 We will proceed with the meeting and I'd like 13 to call on Jack Strosnider who has some comments he would I

r~T 1

\/ 14 like to make before we proceed with the first formal 15 presentation.

16 MR. OTROSNIDER: Is the microphone working?

17 How's that? Okay. Good afternoon, my name is Jack 18 Strosnider. I'm Chief of the Materials and Chemical 19 Engineering Branch.

20 I just wanted to briefly make a few opening 21 remarks. And the first thing I thought might be useful 22 was just let you take a look at the organizational chart 23 for the Materials and Chemical Engineering Branch in the 24 Office of Nuclear Reactor Regulation. This is the branch m

(_j i

25 that I'm Chief of, f NEAL R. GROSS l COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 l

6 1 We have roughly 26 or 27 people at any given 7- 2 time following materials issues primarily in operating our

( l

'~

3 reactors.

4 We have the names of the individuals here. We 5 have two sections, and you can see some of the major areas 6 of responsibility within the branch.

7 We don't have the lead on all of these, but 8 most of them we do. And they are some of the larger 9 issues.

10 Some of the acronyms here, you know, reactor 11 pressure vessels, including all the vessel integrity 12 analysis, control rod drive mechanism, penetration 13 cracking, BWR internals, cracking the Core shroud issues, ID k/ 14 core spray piping, things of that nature, BWR pipe 15 cracking, any flaw evaluations that come out of in-service 16 inspections, leak before break evaluations, reactant 17 coolant pump fly-wheel evaluations. That has to do with 18 the inspection intervals on fly-wheels, and a large number 19 of issues related to license renewal.

20 We don't have the lead on those issues.

21 There's a special group that does that. But we do a lot 22 of the technical review of license renewal issues.

23 It's Section A, a very clever title. This is 24 Section B where we deal -- they call this the " steam

() 25 generator section," which really isn't completely fair, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D.C. 20005 3701 (202) 234-4433

7 1 although that is a large piece of work for that section 7~ 2 and for the branch.

( 'l 3 But they also get into issues involving other 4 water chemistry, post-accident sampling systems, decon, 5 fuel oil, hazardous materials, coding, list of other 6 issues there, and some other inspection areas such as 7 Appendix VIII: performance, demonstration, initiative.

8 So, I just thought it might be helpful for you 9 to see the types of issues that are raing dealt with in 10 the branch, and have some names for who's doing it.

11 Now actually looking at today's agenda, I 12 think you've got a pretty good cross-section of some of 13 the work that's going on. These are some of the more

(~\

kJ 14 important subjects you're going to hear about.

15 And you're going to hear from the people who 16 are doing this, doing a lot of this work So, you're 17 going to hear from the staff today. It's the first time 18 that some of them have had a chance to talk to you, so 19 - you'll have -- be able to associate a face with the names.

20 The other thing, of course, to recognize is 21 that this agenda includes presentations from the Office of 22 Research, from Mike Mayfield's branch. And I would just 23 like -- I think that we have pretty good coordination with 24 that group, something that we rather pride ourselves on, n

() 25 that we work very closely together.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

8 1 We've had staff members work in both those 73 2 branches. And so, you'll be hearing from some of the t s

\._j' 3 staff members.

4 CHAIRMAN SHACK: You pass and back and forth, 5 it looks like.

6 MR. STROSNIDER: Yes, well, that happens. So, 7 I just wanted to give that brief introduction of how the 8 branch is structured.

9 Obviously, we're not structured by discipline.

10 We're structured more by issue.

11 Previously, we had been somewhat more along a 12 discipline issue. But in going into two sections, that 13 was pretty hard to do.

\

\ -) 14 So, we have a pretty wide spectrum of talent is in each of these sections going all the way from, you 16 know, corrosion and metallurgy and materials expertise up 17 through fracture mechanics, component integrity analysis, 18 those eort of things.

19 So, that's basically just a brief introduction 20 I wanted to give. I don't know if you have any questions 21 on that. If not, I'll turn it over to Stephanie Coffin.

22 She's going to talk abcut a generic letter on degradation 23 of steam generator internals.

24 MEMBER KRESS: Is there any significance to

/~T

( ,/ 25 the order of the names?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D.C. 20005 3701 (202) 234-4433

9

, 1 MR. STROSNIDER: Excuse me?

l l

l gg 2 MEMBER KRESS: Is there any significance to l N~) 3 the order of the names?

( 4 MR. STROSNIDER: No, they're just 5 alphabetical, and they're not meant to line up with the 6 issues necessarily.

7 MEMBER KRESS: They're not really alphabetical 8 either, and that's why I wondered.

9 MR. STROSNIDER: Really? There was an attempt 10 at one point in time -- as people have come along and been 11 added, they might not have gotten in.

12 MEMBER KRESS: But I can't draw lines across?

, ,._ 13 MR. STROSNIDER: No, that's the important

[\

}

14 point.

15 MEMBER KRESS: All right.

16 MR. STROSNIDER: You can't draw the line 17 straight a:resa to the issue, but at least you know which 18 section it's in.

19 CHAIRMAN SHACK: Now, does your branch get j

20 most of the NDE resolution -- you know when somebody finds 21 a crack, the inspection and it's a difficult problem to 22 resolve --

1 23 MR. STROSNIDER: Yes.

24 CHAIRMAN SHACK: -- does that end up back with n

k ,) 25 you guys?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIB' RS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-37J1 (202) 234-4433

10 1 MR. STROSNIDER: The flaw evaluation ends up 7s 2 in our branch. And that's -- we had, up until I guess six

( \ l

\/

3 or nine months ago, lead responsibility for all the in-4 service inspection program reviews.

5 But in an effort to redistribute and equalize 6 some of the workload, the Structural and Geosciences 7 Branch is actually doing the reviews of the in-service .

l 8 inspection programs at this point in time.

l 9 They also have the lead on development of 10 risk-informed ISI. And we're working very closely with 11 -hem on all those areas.

12 But there were some resources over there that l 13 could be used, and it was iust a matter of -- I

{~h)

\

l k/ 14 CHAIRMAN SHACK: What NDE inspection issues do 15 you deal with then now?

16 MR. STROSNIDER: We're dealing with largely --

17 CHAIRMAN SHACK: Steam generator stuff or --

18 Mk. STROSNIDER: Yes, what we try to deal with 19 here is anything that deals with any policy-setting type 20 issues, basically the routine program reviews. You know, 21 we don't feel we have to get deeply involved in it.

22 But when we get to Appendix VIII, for example, 23 which you're going to hear about later today, we're 24 involved in that, and certainly any of the flaw (q

,/ 25 evaluations.

NEAL R. GROSS COURT REPORTERS AND TRANSCR!BERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

1.

1 If people find defects in-service, then we do I

, -s, 2 the review if it requires an NRC evaluation.

v) 3 Some of the other inspection areas might 4 include, for example, qualification of the NDE methods for 5 BWR internals. The industry has submitted a number of 6 different topical reports on the scope of inspection, 7 methods of inspection for internals.

8 And we have the lead on reviewing that because 9 that's sort of a new area.

10 MEMBER SEALE: I can see you're going to have 11 a lot of problems which are going to be scattered across 12 this. Certainly corrosion and BWR pipe cracking probably 13 has something in common, and things like that. Do you

'- 14 just put together task groups between the two and that's 15 the way you go at it?

16 MR. STROSNIDER: When it's necessary. I don't 17 know if I mentioned this: this structure haa only been in 18 place for about a month now. So, we're still learning as 19 we go along.

20 We had three sections. But in part of 21 adjusting our supervisor to staff ratios and those sort of 22 moves, we've gone to two sections now.

23 So, some of that we're still working out.

i 24 Like I said, we've got a mix over here. In some cases l

,() ,

25 where you look at issues like BWR pipe cracking, you know, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234 4433 WASHINGTON, D C. 20005-37'01 (202) 234-4433

12 1 we have people in this section who have understanding of 7- 2 corrosion and fracture mechanics and the things you need

( )

L./

3 to do.

4 And to some extent when you start looking at 5 BWR internals, steam generators, you're going to have 6 similar issues with regard to non-destructive examination, 7 growth rates, fracture mechanics analysis.

8 So, there's a sprinkling in both sections of 9 the expertise. We tried to spread it out a little bit.

10 If we need to borrow between sections, then we do do that.

11 And that happens occasionally. And we're 12 learning with this new structure, we've got to move some 13 issues around.

p) ' 14 MEMBER KRESS: Do you guys fund the heavy 15 section steel program or is that in Research?

16 MR. STROSNIDER: No, that's in the Research 17 Office.

18 MEMBER KRESS: But you guys write the user 19 need letter for it?

20 MR. STROSNIDER: Yes, we have supported that 21 with user need letters, and there are periodic reviews.

22 We get together. In fact, we're going to be meeting later 23 this week in our Reseerch Staff to discuss that and some 24 of the other research programs.

r~~N 25 MEMBER SEALE: Jack, just one little bit of (u s)

NEAL R. GROSS COUHT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

13 1 advice: when you find out that you've got all of your f-- 2 issues sorted out to the point where you can either pack L) 3 them into one section or the other, then it's time to 4 reorganize again because you're letter the organization 5 rather than the problem drive your solution.

6 MR. STROSNIDER: Good point. Well, when we 7 get to that -- okay? Thank you. Stephanie?

8 MS. COFFIN: Now, Jack already introduced me.

9 My name is Stephanie Coffin. I'm an Engineer in the In-10 service Inspection Branch, a section of the Materials and 11 Chemical Engineering Branch.

12 The generic letter degradation of steam 13 generator drills was issued for public comment at the end t

14 of December of last year. And it followed up Information 15 Notices 96-09 and 96-09 Supplement I, which described 16 damage to steam generator internals at several French PWR l

17 facilities. I 18 The EDF experience is significant and possibly 19 applicable to the US PWRs, and the generic letter requests 20 how addressees responded to the EDF findings.

21 There are several degradation mechanisms 22 discussed in the generic letter. In April of 1995, 23 anomalous tube support plate eddy current signals were 24 noted during routine in-service inspection of steam (3

t y j 25 generator tubes at one French PWR facility.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234 4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

14 1 They followed up those signals with a visual

-s 2 inspection and confirmed wastage of the uppermost tube f

3 support plate. And EDF, the utility, determined that the 4 wastage was the result of misapplication of a chemical 5 cleaning process.

6 They then reviewed eddy current signals at 7 other facilities and found more anomalous eddy current 8 signals, and followed those up visual inspections and 9 found at eight facilities cracked tube support plates near 10 the radial seismic stop and the inside rotation key.

11 And these signals, they traced them back --

12 the eddy current signals, traced them back to the pre-13 service inspection data and from -- most'.y from that

/,_s\

\ /

'/

14 information and their visual inspections, they believe 15 that the cracking occurred during the final heat treatment 16 of the steam generators.

17 They have also found at four facilities 18 wastage of the tube support plates at various elevations 19 through the steam generator. And this is of particular 20 co"cern because it appears to be an active degradation 21 mechanism and that the eddy current signals are changing 22 over time.

23 MEMBER KRESS: The plates are perpendicular to 24 the tubes.

<~s

(_ 25 MS. COFFIN: That's right.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 2344 433

15 1 MEMBER KRESS: Where does this wastage show up 2 then?

, s\

\ )

3 MS. COFFIN: It's mostly -- well, for the 4 chemical cleaning one, it was -- I'm not sure if it was on G the periphery or if it was in the center of the plate.

I 6 But it turned out that it was directly underneath where a 7 hose for the chemical cleaning was directed.

8 MEMBER KRESS: It had been directed.

9 MS. COFFIN: And it was obviously impingement 10 f rota that chemical cleaning process. I think the wastage 11 in the third bullet is -- I'm not sure if that's 12 distributed randomly or if that's near a periphery too.

13 And lastly at one PWR facility, they O

\ l~- 14 experienced tube bundle wrapper drop. In one of their 15 steam generators, the wrapper dropped 20 millimeters. In 16 another steam generator, it dropped five millimeters, and 17 they found that the support walls were broken.

18 And EDF blames poor quality welds and severe 19 cooling transient for the broken support welds that led to 20 the wrapper drop.

21 MEMBER SHACK: What were the circumstances 22 that led to that large injection of the auxiliary fuel 23 feedwater?

24 MS. COFFIN: I can get back to you on that 25 one. I have the background information, but it was --

(O)

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(?C2p 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

16 .

l 1 apparently according to EDF, it's just sort of this one 7__

2 facility that did this strange cooling transient. But I j s }

'~

3 have the information on that.

4 Maybe we can go through this, and I'll go look 5 that up.

6 MR. SULLIVAN: My name is Ted Sullivan and I 7 might be able to add a little bit. I think this only 8 occurred at the facility called Bligh 2. And it had to do 9 with the way they were shutting down the reactor and using 10 auxiliary feedwater to try to rapidly get the plant cooled 11 down.

12 I can't say like Stephanie that I completely 13 understand the theory. But it does have to do with some

.Q K/ 14 procedural controls that the Licensee had over use of 15 feedwater to shut the plant down.

16 They were, as far as I know, unique to that 17 facility, and they're not being used at that facility 18 anymore.

19 MEMBER SHACK: Okay, but I mean it was a 20 deliberate procedure then?

21 MR. SULLIVAN: Yes.

22 MS. COFFIN: The foreign expanse is safety 23 significant in that the steam generator tube integrity 24 could be compromised if the tube support plates are

/ \

25 damaged or degraded or if the bundle wrapper drops.

(v)

NEAL R. GROSS COllRT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234 4433

17 i

1 For the damage to the tube support plates, the 7- 2 wastage and the cracking, EDF screens for tube support l

3 plate damage using eddy current. And whenever possible, 4 they'll follow up any anomalous eddy current signals with 5 visual inspections. I 6 And tubes that are found to be without lateral 7 -- adequate lateral support are removed from service.

8 For the bundle wrapper drop, EDF confirmed 9 acceptable wrapper welds at other facilities through 10 visual inspections. And the steam generators at the one 11 affected facility, repairs have been completed.

12 In the U.S., damaged tube support plates have 13 been associated with severe denting. And this was an

/N

\- 14 active degradation mechanism over 15 years ago, and is now 15 considered to be under control. However, the EDF 16 experience indicates that there may be other mechanisms 17 out there that can cause tube support plate damage.

18 What little we do know, the U.S. experience 19 related to the EDF findings is pretty limited. But Diablo 20 Canyon in the spring will be visually inspecting their 21 tube support plates corresponding to some anomalous eddy 22 current signals that they detected. And that's this 23 spring outage.

24 And we also know that Byron and Braidwood, in p)

(, 25 support of a three volt alternate repair criteria NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

18 1 amendment, did extensive visual and eddy current 2 inspections of those steam generator internals and did not  ;

73 4

'~'

3 find any degradation.

4 The EDF experience may be directly applicable '

5 to U.S. facilities, and particularly the active wastage 6 mechanism that I mentioned earlier, and maybe the cracked 7 tube support plates and the bundle wrapper drop.

8 PWR licensees need to show how Criterion XI, 9 " Test Control,* and Criterion XVI, " Corrective Action," ,

1 10 are being met. These are from 10 C.F.R. 50, Appendix B in 11 their response to the generic letter.

12 Specifically, the generic letter requests I

13 essentially one of three things: it will describe for us (3

'\ /) 14 the program you have in place for detecting steam 25 generator internal degradation, or describe your plans for 16 developing such a program, or else tell us why you don't 17 think such a program is needed.

18 MEMBER SHACK: What's the philosophy being 19 this kind of generic letter where it looks like you're 20 just sort of asking for information? Doesn't this come 21 out of your normal inspection programs whether people are, 22 you know, adequately treating this kind of a problem?

23 MS. COFFIN: Not really.

24 MR. SULLIVAN: The normal inspection programs

,7 25 -- this is Ted Sullivan again -- focus on the tubes. And

()

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

1 19 1 there aren't any explicits in code or tech spec

,s 2 requirements that would direct a licensee to examine the

/ \

%.-] ,

3 internals.

4 MEMBER SHACK: Okay. So in essence then, 5 we're -- so, you're not asking them to implement such a 6 program. You're only asking whether such a program exists 7 at the moment?

8 MS. COFFIN: That's right.

9 MR. SULLIVAN: We're asking and we're pointing 10 out the regulatory requirement that we think underpins 11 this type of request.

12 MEMBER KRESS: Did you issue an information 13 notice first?

(3

\' ') 14 MS. COFFIN: Yes, 96-09 and a supplement to 15 that too.

16 MEMBER KRESS: And this followed later?

17 MS. COFFIN: ...a generic letter followed those 18 two information notices.

19 MEMBER KRESS: Is this still out for public 20 comment or is it --

21 MS. COFFIN: No, public comment expired on 22 March 15th. And I'll go over to the significant comments 23 that I got.

24 MEMBER KRESS: Okay.

f)

( ,)

25 MS. COFFIN: The first comment was from NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

20 1 NUBARG, which is the Nuclear Utility Backfitting and

,-_ 2 Reform Group. And they state in their comment that, "The N '-l 3 generic letter implies that licensees should be performing l

4 inspections of their steam generator internals." l 5 And they suggest that the Staff perform a 6 backfit analysis.

7 Our response to this comment is firstly, right l 8 now, the generic letter is only asking for information.

9 No action is required in the response to the generic 4

10 letter.

l 11 And secondly, the Staff considers the Appendix l 12 B Criteria XI and XVI apply in this situation, and we l 13 request information from the licensees to see how they O

Y-) 14 comply with these criteria. l 15 And there's no new or revised Staff positions 16 or requirements.

17 MEMBER KRESS: I have never heard of NUBARG.

18 Are they just an independent of NEI or --

19 MS. COFFIN: I've never heard of them either.

29 So -- a lawyer group wrote for them. I really don't --

21 MEMBER KRESS: Did they formulate that group 22 just because --

23 MS. COFFIN: Maybe.

24 ACTING CHAIRMAN SEALE: Would you give us that (3 25 acronym again?

()

HEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234 4433

21 1 MS. COFFIN: NUBARG, Nuclear Utility 2 Backfitting and Reform Group.

!,,_,)

ACTING CHAIRMAN SEALE: It's not even plain 3

4 whether or not the members are nuclear utilities, is it?

5 MR. COZENS: This Kurt Cozens from NEI. I can 6 address your question about NUBARG. NUBARG is a separate 7 group from NEI. It has existed since the 50.109 i

8 regulation was promulgated.

9 And they have a fixed membership comprised of 10 nuclear utilities. l l

11 MEMBER KRESS: Thank you very much.

12 ACTING CHAIRMAN SEALE: Thank you very much.

13 MS. COFFIN: The second significant comment

'k /n) 14 was from NEI, Nuclear Energy Institute. And again, they 15 comment that the generic letter imposes actions on the 16 licensees to perform inspections.

17 And again, our response is that right now, 18 we're just requesting information.

19 And secondly, they made a point that the 20 industry is forming a task force to address our issues 21 that we brought up in the generic letter, and that no 22 generic letter is needed.

23 And our response to that is it's important 24 that the Staff document their position on the French

,O.

( ,) 25 findings and the generic letter and our concerns with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

22 1 Appendix B criteria being met in this regard. And the ,

I

,_ 2 generic letter is a good vehicle for us to document that, )

\' ')

~

3 and also to document how licensees respond.

4 So regardless of what industry task force 4 l

5 forms, we still see a need for the generic letter.

6 And I'm currently addressing comments for the i l

l 7 final generic letter publication. And in response to the  !

8 generic letter, we expect most licensees -- most 9 addressees are going to reference an industry document 10 prepared and coordinated with their NSSS vendors and NEI 11 and perhaps EPRI. And are there any questions or 12 comments?

13 ACTING CHAIRMAN SEALE: Well, it is true that l O '

-s' 14 a lot of utilities have, in fact, inspected the internals j 15 on their steam generators, or at least some have.

16 MS. COFFIN: Documented results I've seen for 17 Byron and Braidwood.

18 ACTING CFAIRMAN SEALE: And I think there was 19 something on Palo Verde's internals inspection when they 20 had that axial rupture too, something like --

21 MR. STROSNIDER: This is Jack Strosnider and 22 yes, we have been informed, I think, in various meetings 23 with the industry that people have performed inspections.

24 When we were doing the Byron /Braidwood review,

(~ r

( ,) 25 there was some discussion that inspections were done in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 g

23 1

1 other units.

I I 2 But the extent of those to scope, the methods, p-

'<)

3 the controls of them, are something that we really don't 4 have a good handle on. And that's --

5 ACTING CHAIRMAN SEALE: And that's what you're 6 trying to do here?

7 MR. STROSNIDER: Yes, that's exactly one of 8 the reasons for this type of letter. You know, part of 9 the response here, if licensees have done inspections, is 10 they could come back and tell us, "We've done 11 inspections," and what areas they've looked at and why 12 they think what they've done is adequate.

13 Some of the comments -- and I think this is an

,a

\-)

14 interesting example because this type of letter -- these 15 comments come up frequently: "The letter implies that we 16 need to go take some action," all right?

17 What we're doing is we're saying, "We have a 18 regulatory requirement, all right, to make sure, you know 19 in Appendix B here, that you're doing proper examinations, 20 dispositioning any findings, to make sure that the safety 21 related components are able to perform their function."

22 If you can respond to the letter by saying, 23 "We don't need to do an inspection because," or "We've j 24 done some inspection," and it addresses the issue, that's

/~T

, (,) 25 fine.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W (202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234 4433

1 24 l l

1 If, in order to satisfy the regulatory l l

3 2 requirement, you conclude that you need to go do -- take l

('~' )

3 some action and do some inspections, well, that's not a 4 result of this letter. The requirement was already there, 5 and you needed to be doing it anyway, particularly in the 6 face of evidence that says there may be a potential for 7 degradation. It's hard -- it's hard to ignore.

8 So, we see this comment a lot. We put out l

9 letters where we are requesting information because we l

l 10 don't know fully what the industry has done or, you know, 11 if there may be some other technical basis for saying it's 12 not important to go inspect. This is an opportunity for 13 people to tell us that.

/,_ T I

\ '

14 The same token: if, in order to comply with l 15 the regulations, they need to take some additional action, 1

16 then that's the action they need to take.

17 ACTING CHAIRMAN SEALE: This may be asking 18 after the horse has gone and the barn door has now been 19 closed as of the 15th of March or whenever it was, but in 20 the request for information where people informed you that 21 they, in fact, have already done some inspections, have 22 you asked them to also tell you why they did the 23 inspection? It seems to me that's --

24 MR. STROSNIDER: No.

I i

\ ,/ 25 ACTING CHAIRMAN SEALE: No?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234 4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

25 1 MR. STROSNIDER: I don't think we specifically f- 2 requested that from them.

ACTING CHAIRMAN SEALE:

3 You know, but it seems 4 to me that's exactly the kind of information that other 5 utilities might want to be on the look-out for. That is, 6 if there was a symptom that showed up that convinced 7 someone that they needed to look at the internals, then if 8 someone --

9 MEMBER SHACK: Beyond an information notice.

10 ACTING CHAIRMAN SEALE: Yes, I'm saying where 11 people have already done it because they had a problem.

12 In a sense, that may or may not be a valid diagnostic for 13 other people to warn them that they might have a problem.

t )

\/ 14 And that may be the thing they need to be looking for.

I 15 MR. STROSNIDER: Yes, I understand your point. l l

16 We did not specifically --  !

l 17 ACTING CHAIRMAN SEALE: I understand, yes. j 18 MR. STROSNIDER: -- ask for the reason people 19 did inspections. They may or may not provide us that 20 information.

21 ACTING CHAIRMAN SEALE: Yes.

22 MR. STROSNIDER: We certainly -- if we see 23 something reported in these responses that we think is 24 important, we can always talk to that licensee and get (n) ,

25 some more detail.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234 4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

26 1 ACTING CHAIRMAN SEALE: Sure, yes.

,_s 2 MR. STROSNIDER: And one of the things we've

/ \

\

'~' /

3 been trying to do with all these generic letters is 4 document our close-out of these letters and not just by 5 sending the letters to the licensee. But we have issued 6 in the past some NUREG reports, and it is our plan with 7 these to do something similar to that so that we can try 8 to take an integrated look at the responses and determine 9 if any additional notification of the industry or anything 10 else is appropriate.

11 MEMBER KRESS: Jack, what happens if you get a 12 response from somebody like along the lines -- "We have 13 never inspected this part of our steam generators because l3

\m) 14 we just didn't think there was any problem. But in view 15 of this experience, foreign experience, we plan to do the 16 inspections from now on?" Would they be considered out of 17 compliance with that kind of reply? And would you guys 18 have any problem with that?

19 MR. STROSNIDER: No, I -- my gut reaction is 20 that no, we're not going to find people out of compliance 21 because they haven't previously been doing inspections. ,

22 But I think, you know, when you become aware of I

23 degradation that's going on, you need to consider its 24 applicability to your facility. 1 rx

( ,) 25 And I think the regulations are clear in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l 1323 RHODE ISLAND AVE., N W. l (202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 f i

)

27 1 looking at that.

,_ , 2 MEMBER KRESS: Yes.

U~ 3 MR. STROSNIDER: And if you do that and you I

4 decide what actions are appropriate, then we asses those.

5 But I don't see looking in hindsight at this and saying, l 6 "We should have been inspecting this all along." l 7 MEMBER KRESS: Okay, thank you.

8 ACTING CHAIRMAN SEALE: Forgiveness is easier  ;

9 than permission.

10 MR. STROSNIDER: Just one other comment, and 11 that's all, and it's just reminding that one of the things 12 that we did request in the letter is that if people have 13 previously done inspections and identified degradation,

,o

(

\--) 14 that they tell us how that degradation was assessed, the 15 disposition.

16 So, we should -- I mean, one of our intents 17 was to find out if there was something out there that 18 we're not aware of, and if people know about that, to 19 share that information with the rest of the industry.

20 ACTING CHAIRMAN SEALE: Is that all that you 21 had, Ms. Coffin?

22 MS. COFFIN: Yes.

23 ACTING CHAIRMAN SEALE: Thank y>u very much.

24 We appreciate your presentation. Who's next, Jack?

A

() 25 MR. STROSNIDER: I guess now we're going to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

28 1 move into the --

2 ACTING CHAIRMAN SEALE: Are you back on the fm $

v 3 saddle now?

4 CHAIRMAN SHACK: Well, since he's my Program 5 Manager --

6 ACTING CHAIRMAN SEALE: No, okay, I guess 7 you're not.

8 (Laughter.)

9 CHAIRMAN SHACK: I think I'm slightly 10 conflicted again.

11 MR. STROSNIDER: The next issue we're going to 12 discuss is, I think, performance based qualification and 13 non-destructive testing methods.

14 ACTING CHAIRMAN SEALE: Okay.

15 MR. STROSNIDER: And this deals with Appendix 16 VIII of the Code, " Performs Demonstration Initiative by 17 the Industry." And Dr. Muscara from the Office of 18 Research h&s been involved in this area for a long time.

19 I think he's prepared to give a historical perspective on i 20 the importance of this area.

1 21 We'll follow that up with a discussion on the 22 generic letter that we've developed in this area.

23 DR. MUSCARA: Good afternoon. I'm Joe 24 Muscara. I'm with the Office of Nuclear Regulatory n

(,) 25 Research. And this afternoon, I would like to discuss NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

29 1 with you some of the background on NDE reliability that's es 2 in support of performance demonstration.

(sm- ) i r

3 Much of the work on inspection reliability has l 4 been conducted under one research program that was 1 5 initiated at the Pacific Northwest Laboratory in the 1

l 6 Fiscal Year 1977. l l

7 As I mentioned, I will only cover a _ry, very 8 small fraction of the results of that work and some 9 results from other programe also.

10 But this project has always had three major 11 objectives. The first objective was to determine and 1

12 quantify the reliability of ultrasonic in-service 13 inspection that is conducted on commercialized water

(' ') 14 reactors, in particular for piping and for pressure 15 vessels.

i 16 We then wanted to recommend Code changes that 17 would improve the reliability of such inspections. And as 18 a final step to our program, we wanted to develop a basis 19 for the inspection program and that is based on the 20 importance of the component to safety and the material 21 properties and service and NDE certainties to formulate 22 the inspection program with respect to frequency of l

i 23 inspection, what to inspect, how reliably to inspect, to 24 achieve suitably low failure probabilities commensurate r~

(_,/ 25 with the safety function of the component.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

30 ,

1 1 And I will not talk about that work at all.

,- 2 But in effect, what we're talking about here is there is 3 base inspection guidelines that are being developed right '

l 4 now. We began working on that in 1987 at PNL.

5 And in 1989, we also funded a research grant 6 with the ASME Research Task Division.

l l

7 As a way to indicate a little bit of 8 background for this program, we first had a need to )

9 evaluate any reliability in a study that the Office was 1

10 conducting in evaluating the cold break probability.

11 We wanted to see whether the probability cold l l

l 12 break, cold leg break, was low enough to essentially not  !

13 consider it as a design basis accident.

\ 1

'/

'- 14 We were also, of course, concerned about the 15 quality and the frequency of the inspections that were 1

16 being conducted, and particularly in view of the pipe 17 cracking experiences we were having in the early to mid 18 and late 70's. j 19 Also, the PDRC work conducted between 1965 and 20 '75 and PISC 1, which was conducted between '75 and '80, 21 had identified poor reliability for inspecting heavy 22 section steel and pressure vessel steels.

l 23 With that background in mind, we wanted to 24 make improvements to the Code as quickly as possible. So, r~s kj 25 our first work had to do with doing some parametric NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 l

1

i 31 I 1 studies, to evaluate important inspection parameters on l l

I ,_s 2 the reliability inspection, or at least on the -- on the )

( )

3 signals that were produced from the ultrasonic inspection.

1 4 And we looked at many, many variables and we l 5 performed 6,000 measurements in that study. Those results 6 were used to develop recommendations for improved 7 procedures, and these were incorporated in Research 8 Information Letter No. 113 that was issued in 1981.

9 And in 1982, the recommendations were placed 1C into the ASME Code Case N-335.

11 Following the parametric studies, we conducted 12 two round-robin inspections to quantify the POD as a 13 function of crack size, false call rate and sizing

(\

kJ 14 accuracy.

15 The first of these studies was the piping 16 inspection round robin conducted in 1982. Six commercial 17 ISI teams participated in this project. Each team was 18 made up of three persons from a particular company with 19 varying amounts of experience and including Levels I, II, 20 and III Inspectors.

1

! 21 That particular work, where we conducted 1,500 22 measurements, under typical, realistic conditions. We l

l 23 followed up that particular work.with what we called the I l

i 24 mini-round robin, and this concentrated on stainless steel l

/' l (T ) 25 pipe cracking, IGSCC.  !

NEAL R. GROSS OOURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON. D C. 20005-3701 (202) 234 4433

32 l

1 And in this testing, we looked at 12 s 2 individuals and three inspection teams that used automatic j

\'~' /

3 equipment.

4 In the piping inspection round robin, we 5 looked at the major piping materials that are used on 6 light water reactors. We looked at clad ferritic piping, 32 inches in diameter, 2 3/8 inch wall thickness.

7

)

8 Within this material, we had 16 thermal j 9 fatigue cracks that range in length from 1.25 to 3.1 10 inches, and in depth from 0.3 to 1.1 inches.

11 We evaluated the centrifugally cast stainless 1

12 steel piping material, and this was at 33 inch piping 13 sections, 2 3/8 wall thickness.

i k/ 14 These samples contained 19 thermal fatigue 15 cracks, again ranging in lengths from 1 to 4 inches, and 16 in depth from 0.3 to 1.25 inches.

17 And we also evaluated wrought stainless steel.

18 This material, we looked at 10 inch diameter piping in 19 Schedule 80 in ADS. So, we had 0.5 or 0.6 inch wall 20 thickness.

l 21 Within this material, we had 23 intergranular 22 stress corrosion cracks and 28 thermal fatigue cracks.

23 Lengths ranged from 0.16 to 2.3 inches for the IGSCC, and 24 0.33 inches to 2.4 inches for the thermal fatigue. And

/~'

( )s 25 the depths ranged from 0.1 to about 0.3 inches.

l l

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 i

33 1

1 In the mini-round robin, we have evaluated j 73 2 wrought stainless steel in 10 and 12 inch diameter in l ( '~' )

3 various schedules, Schedule 80 and Schedule 100. So, we 4 had thicknesses from 0.6 to 0.85 inches.

5 And we looked at a total number of 28 6 intergranular stress corrosion cracks. Flaw lengths l 7 varied from less than 1 inch to 40 inches. So, some of l

8 these had cracking all the way around the pipe, and a flaw 9 depth rate from 0.03 to 0.45 inches.

10 Now, I'd briefly like to go into some of the 11 results. I'm only going to show you this one viewfoil I

12 from the 6,000 parametric studies. But here we are 13 looking at the effect of the transducer size on those

~l 14 responses from different types and sizes and angles of I

15 flaws.

16 And this information essentially was used to 17 determine an appropriate transducer size with respect to 18 the piping thickness.

19 And this kind of information, as I mentioned 20 before, has gone into the ASME Code. The kinds of 21 recommendations that were incorporated into the Code from 22 this work were the transducer size to be used, the 23 inspection angles.

24 We effectively recommended the addition of a f

(3) 25 60 degree angle; the scale overlap, where we recommended a

! HEAL R. GROSS l COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234 4433 l

34 l

1 50 percent overlap; and other parameters that had to do 1

gs 2 with the dynamic of the transducer.

(v) 3 Also in this particular recommendation, we, 4 for the first time -- so back in 1981, we recommended that 5 performance demonstrations should be conducted for 6 stainless steel piping and for the similar metal welds.

7 This is one of the early plots from the piping G round robin work. And it-effectively shows the_ relative 9 capability for ferritic piping, cast stainless steel 10 piping and wrought stainless steel piping.

11 As we can see, the ferritic piping inspection 12 was fairly reasonable. We have fairly good capability.

13 The stainless steel piping with IGSCC has I \

\2 14 somewhat of an intermediate level of capability. And the 15 cast stainless steel pipe is essentially totally 16 uninspectable.

17 We have -- their probability of detection is l l

18 around 20 percent an the false call rates were quite high.

19 Well, that was one interesting plot that 20 essentially made the case of the relative performance of 21 the materials. But in looking more carefully at this 22 information, we noticea besides the relative level of l 23 capability that there's a great deal of scatter in the 24 performance of various things with various flaws; in f^)

() 25 particular, for the stainless steel with IGSCC.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 2344 433 WASHINGTON. D C. 20005-3701 (202) 2344 433 l

l 35 1 Again, we can see that for the cast stainless I

g3 2 steel, there is very poor inspectability. There are two

\ i

\~/

3 datapoints that are 100 percent inspection.

4 I guess I should mention that in this .

I 1

5 material, there is no lack of signals. It is quite noisy i 6 material, and the same as the wrought stainless steel with 7 the IGSCC.

8 _ _ _ _ _

The problem is really to distinguish geometric 9 reflectors or grain boundary reflections from cracking.

10 And what happened in the case here of these 11 two datapoints at 100 percent POD is that the inspector 1

12 was calling everything cracked. So if you call everything 13 cracked, he gets all the cracks, but he also has a fm l

14 tremendous amount of falls calls.

15 So, we learned in our work later on to have 16 penalties for false calling.

17 An additional bit of information from the 13 piping inspection round robin was there is a comparison 19 here of the inspectability of wrought stainless steel from 20 the near side and from the far side.

21 Inspection from the near side, essentially the 22 flaw is on the same side of the transducer beam -- as the

! 23 transducer beam. So, the beam does not have to cross the 24 weld metal.

,/^\

25 And the inspection reliability is fairly

()

[

l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

1 36 1 reasonable. This is the top curve for the near side.

s 2 For the far side, the beam has to traverse the

/ 1 k

3 weld metal. And here, we essentially have a cast 4 structure.

5 And so, the inspectability of a dissimilar 6 metal weld or going through the weld for a wrought 7 stainless steel is quite poor.

I 8 This plot shows performance of the six teams 9 that participated in the round robin inspection. We 10 notice that the average for the far side again is quite 11 poor, the average for the near side, intermediate.

12 There were two teams that performed reasonably 13 well, and three teams cut of the six that performed quite

, ,\

i

\- 14 poorly.

15 So, there is quite a range in performance from 16 team to team, essentially using the same kinds of 17 procedures and equipment.

18 This data is from the mini-round robin where 19 we --

20 MEMBER SHACK: Joe, does the Code essentially i

21 tell you -- I mean, you do the near side inspection when l 22 you can. You do the far side inspection only when you

{

l 23 have to.

l 24 DR. MUSCARA: Yes, the Code requires

(~

!')

( 25 inspection from both sides if you can -- if you can get NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234 4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

37 1 access to both sides. So quite often from piping to

, , ~s 2 component, you only have access from the piping side. And

(')

3 if the flaw happens to be on the other side of the weld, 4 it is really uninspectable.

5 We show similar results here for the mini-6 round robin. I should mention the mini-round robin was 7 conducted after the I&E 83-02 Bulletin that required some 8 sort of a performance demonstration for stainless steel 9 piping, and was conducted at the NDE Center.

10 So, the teams that participated in this round 11 robin had passed the NDE Center test, both the sizing and 12 detection test.

13 And what we found was that the performance was

,r )

wJ 14 quite similar to what we had determined from the prior 15 testing a few years earlier.

16 The experience at the NDE Center had been that 17 only about 40 percent of the teams passed those tests on 18 the first try. And that was true both before and after 19 this mini-round robin.

20 So, the inspection of POD versus flaw size is 21 quite similar. And here, we are showing the relationship 22 between the probability detection and the false call rate.

23 Again, we see that two or three teams perform 24 acceptably well, the other three teams fairly poorly.

()

/~s 25 When I say that these teams performed reasonably well, we NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 23d 4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

l 38 1 have de. fined an acceptable team as a team that has a ,

1 g- 2 probability detection of 80 percent with a false call rate l I N ,) l 3 of less than 20 percent.

l 4 And we do have three teams that fell -- that 5 met that category. l 6 But again I'd like to stress that regardless 7 what the capability is, there's a lot of variability from l l

8 team to team performance.  !

9 And this viewgraph essentially is from the 10 data I've just shown you for the different teams, the 15 11 different teams, that participated in the mini-round 12 robin. And we're showing the upper and lower 90 percent 13 confidence, both for the false call probability and for

( \

'\ / 14 the probability detection.

15 You'll notice on this first table, for 16 example, there are only three teams there who met the 80 17 percent POD with less than 20 percent false call.

18 But .iotice the large ranges in variability 19 between the upper and lower 90 percent.

20 So effectively, we were trying to make the 21 point that even though the capability can be improved, the 22 inspector plays a major role in the final outcome and that l

l 23 we need to have performance demonstration to screen poor 24 inspectors.

(h ACTING CHAIRMAN SEALE: Has there been any

() 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

39 1 effort -- I know in the steam generator tube inspection r~ss 2 area, there's been work on developing software to help t

l G Is this kind of -- would it be 3 interpret results.

4 amenable to a similar approach?

5 DR. MUSCARA: Yes. In fact, my personal view 6 is that the ultrasonic field is much farther ahead than 7 the eddy current in applying signals.

8 ACTING CHAIRMAN SEALE: Now, is that -- what's 9 the performance of that when you superimpose all this?

10 DR. MUSCARA: I will have some data later on 11 that shows some of the more advanced techniques. But in 12 effect, the inspector plays a really major role. It's a l

,_ 13 skill --

! \

14 ACTING CHAIRMAN SEALE: Clearly.

15 DR. MUSCARA: -- dependent technology. And 16 even when we improve the capability by conducting various 17 signal analysis procedures and using the physics of the i 18 inspection to determine flaw depth and flaw length, we 19 still find that there is a large amount of variability.

20 Well, this viewfoil is just to introduce a 21 little bit of information or data from the PISC 22 inspections. Now, the PISC is an international program 23 that the U.S. has participated in.

24 We, in fact, have provided many samples and 7

(_) 25 inspection teams for this work. And this shows the i NEAL R. GROSS l COURT REPORTE~RS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

l (202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234 4433

i I

40 l

l 1 capability that was determined in the mid to late 80's for l

- 2 a stainless steel piping. And in effect, it's similar to l

l % ,)

3 what we have found in the earlier 80's.

4 MEMBER SHACK: But, I mean, these are European 1

5 teams. Would they have been using the same techniques?

l 6 Would they -- they wouldn't have been through the EPRI l 7 qualifications.

8 DR. MUSCARA: Yes, they -- many of these 9 techniques are quite similar. Part of the problem is that 10 most of these are amplitude-dependent; not all, but many 11 of them.

I 12 I'm not showing you the information now, but I #%g 13 we provided samples to PISC and also participated in what

I \

\'l 14 we call the UT reliability round robin, which followed the l 1

15 information I'm showing you now. That information is l

16 being evaluated right now.

17 So, we did have U.S. teams participating along 18 with European, Japanese, and Russian teams.

19 From evaluating work from the past and on the 20 vessel inspections, the U.S. teams performed very 21 similarly to the European teams given similar procedures.

22 Right, this is one that I just discussed. Now

! 23 up to this point, I've talked about essentially the 24 probability flaw detection or the reliability of the

()

,n 25 detection process in piping materials.

l NEAL R. GROSS f COURT REPORTERS AND TRANSCRIBERS l 1323 RHODE ISLAND AVE.. N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

l 41 l

l 1 We also evaluated the sizing accuracy, of l

l 2 various techniques that are applied for inspections as l 7_ '

( ')

3 required by the Code.

4 Many of these techniques have been based on I 1

5 amplitude drop, and they have severe drawbacks. What you 1

1 6 notice here is that there is really actually very little,  !

l 7 if any, sizing capability.

1 8 I am showing information here on the sizing 9 capability for ferritic piping. The reason I chose this 10 example is that in ferritic piping, as you notice, the 11 probability detection was reasonably good.

12 But the sizing is an entirely different story.

l 1

13 So even though the material is clean and there is very 1

(^h 1 i

\~) 14 little to worry about with respect to evaluating signals, 15 whether they're from flaws or not from flaws, when it 16 comes to sizing and using amplitude drop techniques, even 17 with good clean signals, the sizing is not acceptable with 18 amplitude drop techniques.

19 MEMPER SHACK: So, this is all amplitude drop 20 and no --

21 DR. MUSCARA: Yes, this is all Code 22 procedures, yes. This is showing the mini-round robin 23 sizing results. And here -- now, the teams have gone 24 through the EPRI NDE Center qualification.

~

(3) 25 And we notice that the -- at least for the 1

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 2344 433

! I l 42 l

l l 1 best team, he has an improved sizing capability. It's I l,c. 2 really a lot better than the worst team. And in most

'! l 3 cases, these worst teams have absolutely no slope, about l 4 zero capability for sizing.

1 1

5 But what's not shown here for the specific l

6 team is that there's still a lot of variability in the l 7 sizing performance. And often, the -- I guess which is 8 also a bit of a problem, the large deep flaws would tend -

l 9 - tended to be under-sized.

l 10 MEMBER SHACK: Now again, what would be the i 11 technique they were using for these? )

1 12 DR. MUSCARA: Here, they've used a number of l l 13 different techniques that are a part of the EPRI NDE l l /T I 14 Center protocol. So, they have moved their way, in these 1

15 studies, from the strictly amplitude-based techniques. l 16 Some of the techniques use crack tip to i 17 fracture to do the sizing. But of course, the problem 18 with that is that you have to identify the proper crack 19 tip.

20 And now the results on sizing from the PISC 21 III work, which was conducted later. And again, we see 1

22 there has been an improvement in the correlation, but l

23 there's still a great amount of scatter.

24 So, it's operator-to-operator dependent, even

,,3 i j 25 with the better techniques.

NEAL R. GROSS

! COURT REPORTERS AND TRANSCRIBERS l 1323 RHODE ISLAND AVE., N.W.

(202) 234 4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 l

l

1 43 1 Right, so that covered essentially detection 73 2 and sizing in piping materials. I'd like to address a l

()

m.

3 little bit the capability for inspecting pressure vessel j 4 steels.

5 In this viewfoil it shows data that was 1

6 generated by PISC I. Now, PISC I was conducted actually I 7 on some American blocks. These were PVRC blocks.

8 Now, PVRC had found that the inspection j 9 capability for pressure vessel material was quite poor.

1 10 The Europeans felt they could do much better. They asked l 11 for these blocks. They were sent to Europe, and they i 12 conducted the PISC I exercise.

13 And their performance was just as poor as it

/ 14 had been in the States. Again at that time, they were 15 using amplitude based techniques, and they're just not 16 quite acceptable for detection or sizing.

17 What we see here in this Zone 1, those are 18 flaws that are said to be acceptable. This is by ASME 1

19 acceptance tables. In the next area, we have flaws that 20 are not acceptable. These are vertical crack-type flaws.

I 21 And you can see probability detecting even a one or two j 22 inch flaw can be down below 50 percent. j 23 In this third zone, we were looking at 24 clustering of flaws, and that made t inspection even j r~n i

(_) 25 more difficult. And the probability of detecting those  !

i NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS i 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON. D C. 20005-3701 (202) 234-4433

44 1 flaws is mostly below 50 percent, even if the clustered

.y-2 zones are of the order of four or five or six inches.

l ('~')

3 Now, we have made use of some of the work from 4 PISC in updating the Code. And some of that update was 1

5 taken from data such as the one I'm showing you now where 6 we are looking at the relative capability of the 7 inspection of pressure vessel steel using the ASME l

8 techniques, but at different sensitivity threcholds.

9 So if using 50 percent, that procedure which l 10 was the Code back in the 70's and 80's, probability 11 detection is quite, quite low. And we also show a large 12 variability in the probability detection values.

1 13 At 20 percent, we have an improved capability

( )

14 for detecting flaws. But again, the two standard l l

15 deviations there show a large variability in the  !

l 16 inspection results.

17 The dashed line was the Marshall Committee.

l I

18 POD is a function of flaw size that was desired. And what 19 we show here, the top line, is what's called "Special 20 Procedures (European)," and these were mostly -- type i 21 defraction techniques and ALOK and in-line SAFT.

22 They're called " European" because the U.S.

l l 23 didn't participate in that particular round robin. But in 24 fact, the SAFT technology did come from the U.S.

p k 25 And what was being used in Europe was a line NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

l (202) 234-4433 WASHINGTON. D C. 20005-3701 (202) 234-4433 l

45 1 SAFT instead of a volumetric SAFT, which was not quite as s 2 capable as the volumetric SAFT.

f

~'

)

3 So for the special procedures, there is an 4 improvement.

5 Now, and this is the kind of information we 6 see published in the PISC reports. And what I wanted to 7 show you is when we take that data and reduce it down and c at least show the individual datapoints, what we are 9 looking at here is the 50 percent DAC information.

10 We notice that about one-half of those flaws 11 were totally undetected by any team. And these are flaws 12 that ranged up to 80 millimeters.

13 About one-third of the flaws were detected by

/ #

14 about a third of the teams. And the rest of the flaws, 15 only a few teams detected.

16 So what's important here is that even very 17 large flaws go undetected, and that the general capability 18 is quite low, as was shown on the previous curve for the 19 50 percent DAC.

20 Based on the information from 50 percent DAC 21 and l20 percent DAC, the Code accepted an upgrade on the 22 sensitivity. And the 20 percent DAC is what is in the 23 ASME Code at this point.

24 Well, this is information we obtained from 10 O

()

25 and 20 percent DAC. What I'd like to show again is that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234 4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 ,

46 1 although all the flaws were detected, still for large --

7s 2 for several flaws and for large flaws, the detection rate i \

\~'/

l 3 is quite low still, about 20 percent.

1 That's not much of an improvement in detecting 4

l 5 two, three, and four-inch deep flaws at a 20 percent 6 level. And there is still is quite a degree of 7 variability from flaw to flaw and team to team.

l l 8 So, even the 20 percent DAC, these amplitude-9 based techniques, may have been an improvement in the 10 capability, a slight improvement. There's not much 11 improvement in the variability. And in fact, there's 12 really not much improvement in the capability either in 13 going from 20 to 50 percent DAC.

i , i 1

\/ 14 So, the amplitude-based techniques are really 15 not effective and performance demonstration is needed to 16 screen out poor inspectors from good inspectors.

17 This essentially shows the POD versus flaw 18 depth for this PISC II, Plate 3, which was a plate that 19 contained a nozzle. So, the flaws were contained in the 20 well of the nozzle to the plate.

21 And again, these were the special procedures.

22 So, you can see that the general level of capability is 23 quite higher, and there seems to be a little bit less 24 variability in the information.

( \

(

s

) 25 of course, we need to keep in mind that these NEAL R. GRC$$

COURT REPORTERS AND TR ANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

47 l l

l 1 special procedures were often carried out by highly l l

2 trained researchers that had all kinds of time to do the

! \

l

\

/ 1 3 testing and the analysis.

l l

4 But at any rate, the capability has improved. l 5 The variability -- then we need to do a more realistic 6 kind of study where field type inspectors participate in 7 the testing.

l 8 And that shows the capability in the PISC III 1

9 work for Action II, which was a pressure vessel inspection l 10 for sizing techniquas. And these techniques were not j 11 necessarily amplitude-based. They were mostly special 12 procedures. Again, they were SAFT, ALOK and time of l l

13 flight techniques. l

,a ,

C') 14 And we notice that there is an improvement in 15 the capability, but still of concern is the large amount 16 of variability and also the large amount of under-sizing 17 that can be done on flaws that are as large as three or 1

1 18 four inches deep.

19 MEMBER SHACK: Now, are these multiple team 20 results then or --

21 DR. MUSCARA: In most cases, these were one 22 research group or one inspector. Even in our piping 23 inspection round robin where we had the team of three 24 people, they effectively gave individual results.

()73 25 There was not much change in the Code when the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASH!NGTON, D C. 20005-3701 (202) 234-4433

48' 1 team got together and discussed the results.

7s 2 MEMBER SHACK: No, I meant for like that one )

i 1 ,

N /

3 flaw at 95 millimeters. I mean, is that six different  ;

l 4 teams: three of them under-sized it and three of them )

l 5 over-sized it?

l 6 DR. MUSCARA: Yes, yes. This is essentially -

7 - these are different flaws and different teams. So ,

l 8 there were several flaws at 90 percent, although they  ;

1 9 perfectly line up so I think it's just one flaw. And 10- those are the results from the different teams.

11 In some of these areas, it may have been more j l

12 than one flaw that were looked at by several teams.

13 But again, I'm showing you really a very small

! )

k/ 14 fraction of the results that are available in this field. i 1

15 But these results -- the testings that was conducted in 16 the late 70's and through the 80's and early -- the early 17 90's really have indicated that ASME Code procedures, the 18 prescriptive procedures, are not capable of providing 19 adequate reliability.

20 We had felt that a new approach was needed to 21 improve this inspection reliability, and had determined 22 that a performance demonstration program would be 23 necessary to improve the reliability of the inspections.

24 So, we began working in this area back in the

()

25 early 80's to develop criteria for performance NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

49 1 demonstration. l l

<x 2 We have conducted two public meetings to

( )

~

3 discuss general ideas about performance demonstration and 4 to get technical input on what might provide a good 5 performance demonstration program. These meetings were 6 conducted in 1983 and 1984. l l

l 7 In 1983, Professor Shewman from ACRS This was about a l 8 participated in working group sessions.

9 two or three-day session where we really put down our 10 initial thoughts on what performance demonstration should l 11 accomplish.

12 In 1984, we already had what we called a 13 " draft reg guide," and we had a public meeting to present

/ T

14 the results of this reg guide.

15 At that meeting, the ASME Code personnel 16 suggested that the ASME Code should undertake development 17 of performance demonstration requirements using as a basis 18 ,the PNL/NRC document that had been developed.

19 Over the next five years, some 100 20 participants were involved in developing these Code rules.

21 There were representatives from the industry, from the 22 NRC. From NRC, we had Research, Headquarters and Regions.

23 24 The key concept of ASME Section XI, Appendix q) t y, 25 VII and VIII -- there were two appendices developed, i NEAL R. GROSS

( COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

l (202) 234 4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

50 l l l l 1 Appendix VII has to do with personnel training and l

- 2 qualification. And that's a prerequisite to Appendix

\ J

'~' VIII, which is the actual performance demonstration 3

4 itself.

5 So Appendix VIII requires training and l

6 qualification. The tests are statistically based. A key l

7 concept is that the personnel, the procedures and the l 8 equipment, taken together, which we've called the NDE 9 System, need to be qualified.

l l

10 Qualifying a procedure by itself was not i l

11 adequate. So, the person, the procedure and the i 12 equipment, all realistic components, is what is required I l

13 to be qualified. I n 4

'N / 14 Well this work, over a period of five years, 15 really culminated some major changes in the Code in that 16 they were moved from a cookbook procedure to a 17 performance-based procedure.

18 And, of course, to conduct these tests 19 properly using large mock-ups ans! components is quite an 20 undertaking, quite expensive. And the industry has 21 undertaken to conduct these performance demonstration 22 tests at a large investment of time and cost.

23 Well, some of the characteristics of the 24 detection test is that it's a blind test. It is

(~\

( ,) 25 statistically based. It's a screening test, so we're not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l

1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. M005-3701 (202) 234-4433

i 51 1

1 trying to lock at POD here. It's a screening test to 2 screen out the poor inspectors.

f,I

~# The test is designed such that a poor 3

4 inspector passes only a small percentage of the time, and 5 a good inspector should pass a large percentage of the 6 time.

7 For piping, we indicated a poor inspector 8 would be one who is probability of detection is 50 percent 9 with a false call rate of more than 20 percent. And this 10 inspector should pass less than one percent of the time.

11 And for a gcod inspector, whose POD would be 12 90 percent or greater and a false call probability of less 13 than 20 percent, the test is set up so that he passes 85 I )

\/ 14 percent of the time.

15 For reactor pressure vessel, similar criteria 16 were developed. There, we define a poor inspector as one 17 whose POD was 70 percent or less and false call 18 probability at 20 percent or more. And his chance of 19 passing the test should be one percent or less.

20 And a good inspector would be one with a 95 21 percent POD and a 20 percent false call probability. And 22 again, he should be passing at least 85 percent of the l 23 time.

24 I would like to emphasize again that this test

( ,)

25 does not provide us with POD statistics. When we look at NEAL R. GROSS COURT REPORTE9S AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.

(202) 234-4433 WASHINGTON. D C. 20005-3701 (202) 234-4433

l 52 1 the information on the number of samples that are included L

! ,_ 2 in these screening tests, they are fairly small batches of

) 3 samples.

l 4 For the crack sizing test, the criteria here l 5 was more based on judgement and on the experience that had l t 1 i

6 been gained at the NDE Center with the IGSCC round robin j 7 trials. l 8 The passing criteria for piping on the length l 9 size was that they should be able to size the length of a l

10 flaw within plus or minus one inch. And currently, the 11 depth sizing is less than 0.125 RMSE.

l 12 I should mention that in the initial l

13 developments of Appendix VIII, there were other

'\ -) 14 requirements on the sizing. And they had to do with the 15 slope and the standard deviation and the amount of under-16 sizing that was acceptable for large flaws.

17 I think this simplified the test some, but 18 there may be some problems of just having an RMSE 19 criterion with no under-sizing.

20 And for reactor pressure vessels, again the 21 length sizing should be less than 0.75 inch RMSE, depth 22 sizing a slope of 0.7, mean deviation of 0.25 inches, and l

i l 23 a correlation coefficient of 0.7.

24 MEMBER SHACK: Is this supposed to be true for s ,

) 25 cast stainless steel piping too?

HEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

l (202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 l

53 1 DR. MUSCARA: No, unfortunately Appendix VIII

,. 2 has a number of supplements. And Appendix VIII itself

\

'~'

/

3 gives the general requirements for performance 4 demonstration, and the supplements give specifics for 5 conducting a performance demonstration for a particular 6 component.

7 There is no supplement yet for cast stainless .

l 8 steel piping. There had been originally, and that was the 9 same as other piping. But I think ASME Code personnel l l

10 decided that the inspection of cast stainless steel was so l

11 poor, that they did not want to have a performance l l

12 demonstration on that quite yet. I l

13 And so, that is something that is under

,/'_'N <

14 development, although there is not much activity that is 15 going on in the code -- in developing that supplement.

16 But the philosophy within the Code is that any 17 component that is required to be inspected by the Code 18 should be done according to a qualified procedure. And of 19 course, if there is no supplement, then they move back to 20 the old procedures until a supplement is developed.

21 So, the supplements essentially contain 22 information on the size of the specimens, the minimum 23 number of specimens, fabrication conditions such as the 24 cro::n size and the geometric conditions.

( ,) 25 It is stressed that they should be using NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 2344433

l l 54 i 1 realistic mock-ups with realistic flaws. 1 cu 2 So, information on defect conditions, such as

! 1 LJ the types of flaws and the location, orientation of flaws, 3

4 are given in the supplements.

5 In the detection specimens, the number of 6 flaws and the flaw grading units are given again because 7 there is a requirement for false call probability. So, we 1

need to have grading units that are free of flaws.  ;

8 1

9 And for the sizing specimens, the number of 10 sizes and the number of flaws are given. And there is l

11 acceptance criteria for both the detection and sizing 12 tests.

13 This table comes from Appendix A in the Code,

)

' ' and it gives the acceptance criteria for the detection 14 15 test first and then piping.

16 In the screening test, you can get away 17 essentially with just a five sample test, five flaws and 18 ten unflawed grading units for false calls. A fairly 19 typical test is an eight out of ten test where passing the 20 test if only you missed two flaws out of ten flaws.

21 I guess maybe just a word on the sample set 22 itself. Generally for these supplements, the sample set i 23 is split up in thirds.

24 One-third of the sample is usually between

/q i j) 25 zero and 30 percent for all flaws, another third between NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON. D.C. 20005-3701 (202) 234-4433 l

55 1 30 percent and 60 percent for all flaws; and the final

, - 2 third of the sample has flaws from 60 percent on mounting

! )

3 through wall.

4 So when you look at five or ten specimens, you 5 can see there are only two or three specimens in each size 6 category.

7 I don't plan on spending actually any time on 8 this, but this is just the performance demonstration 9 history, studying in the early 70's -- well, late 70's to i 10 the present time, bringing in the research results and the 11 Code activities.

12 MEMBER SHACK: Are the performance 13 demonstrations being done by industry groups and EPRI NDE l

[ )

k/ 14 or --

15 DR. MUSCARA: Yes, and you'll probably hear 16 more about it in your later presentation. But there is l

)

17 this PDI, performance demonstration initiative, that was l I

18 put in place right af ter the Append 5MM.Iq4VIII were 1

19 produced by the Code.

20 And industry essentially got together to 21 develop their qualification program. l 22 And so they spent literally over $10 million 23 in putting together a program with realistic mock-ups and l 24 realistic flaws to conduct these performance

(["X) 25 demonstration.

HEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234 4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

56 1 They have run a number of inspectors through

, .x 2 the piping inspection demonstrations, and I believe they l \

4

'~ 3 are conducting demonstrations on pressure vessel steels 4 also.

5 My recollection is that finally about 100 6 pe: ent of the utilities participated in the PDI program.

7 So, they provided funds and support for the performance 8 demonstration.

9 Just to su.amarize, the research results and 10 round robin tests and experience since the early 70's have 11 shown poor reliability of many prescriptive in-service 12 inspection techniques.

13 And even as improvements has been made to the n

- 14 techniques to the Code based on experience and research 15 results, there is still a large amount of variability in 16 the performance from inspector to inspector, particularly 17 because this is a -- it's a skill-based technology.

18 And so even if we have capable procedures, the 19 same procedure and equipment in a different inspector's 20 hands, perform differently.

21 So, we had felt there was a need for NDE 22 system performance demonstration to screen out the poor 23 performance from the qualified pool of NDE systems; that 24 is, the person, the procedure and the equipment, that are O

(_) 25 use for in-service inspections of operating reactors.

HEAL R. GROSS l COURT REPORTERS AND TRANSCRIBERS (

1323 RHODE ISLAND AVE., N W.

WASHINGTON, D C. 20005-3701 (202) 234-4433 l (202) 234-4433 1

l

57 1 My last two bullets are more of recommendation

, 2 than a conclusion. You notice that a popular test could j i \

'~'

3 be an eight out of ten test. l 1

4 That means that the inspector can miss two j l

5 frauds and still pass the test. My concern is what if i 6 this inspector misses the two largest flaws. He only has 1

1 7 two or three flaws in each size category. l 1

8 So, he passes the test by identifying eight j 9 flaws out of ten and he misses two through-wall flaws.

10 Should he really be qualified to conduct inspections?

I 11 I think this is an area for us to look in the 12 Staff in the future to determine whether we want some i

13 other requirement in addition to the eight out of ten.  !

!o t k) 14 Should there be a restriction on no flaws l l

l 15 being missed that are greater than a certain depth?

16 And the last bullet is similar. It talks 17 about the sizing qualification. Here we have an RMSE 18 value, but there's -- at this stage, there is no criteria 19 for how much under-sizing can be acceptable for large 20 flaws.

21 As we notice from the PISC work, for example 22 from the pipe inspection round robin work, we can call l

l 23 flaws that are one and two and three inches deep quite 24 small.

/%

( ). 25 That should not be an acceptable condition.

l l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l

1323 RHODE ISLAND AVE., N.W.

! (202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

58 1 So, I think those are two areas that we may need to look

,y 2 at a bit more carefully for future work.

\ )

3 And I think this really concludes my 4 presentation. I have in your hand-out a list of three or 5 pages of rtierences that are reports essentially based on 6 the NDE reliability research work that's been conducted.

l l

7 And so if this wasn't enough, there is a lot i 8 more to be looked at. Are there any questions?

9 ACTING CHAIRMAN SEALE: Questions?

10 MEMBER SHACK: It makes you glad you've got 11 ductile materials, doesn't it? j 12 ACTING CHAIRMAN SEALE: It sure does. Thank l 13 you, I was looking for the word. Tom, did you want to i

/,\

- ' 14 make any comment?

l 15 MEMBER SHACK: Maybe it would be better to ask l 16 Bob Herman this next. I -- the BWR people basically have 17 to do something like a performance demonstration, right, 18 as part of 03-13?

19 DR. MUSCARA: Yes, only for the IGSCC pipe 20 cracking problem. And in fact, when you look at the ASME 21 Code Appendix VIII for piping, that's very similar to 22 what's going on with the BWR owners group and the NRC memo 23 of understanding where they're doing a detection and a 24 sizing test.

("\

, (_,) 25 The detection test started out as a four out l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234 4431 WASHINGTON, D C. 20005-3'01 (202) 234-4433 l

59 1 of five tests and moved on to an eight out of ten. And 2 the sizing test is very similar to what I described. So, l r3 N,l 3 they've been doing that since the mid 80's.

4 MEMBER SHACK: Okay. And so,Section VIII i

5 then really expands that to --  ;

1 6 DR. MUSCARA: Yes,Section VIII requires it 7 for vessels, for nozzles, for bolts and a number of 8 components. The philosophy again is that everything that 9 is required to be inspected should be done according to a 10 demonstrsted -- unless there's no supplement in place, in 11 which case the supplement needs to be developed.

12 MEMBER SHACK: So when I guy puts in 3/16 13 stainless steel, he just goes back to the ordinary Code?

! t

\ 14 DR. MUSCARA: No. Well, that's according to 15 NUREG 0?-13, but not according to the Code requirements.

16 The Code requires performance demonstration for all 17 piping: ferritic and stainless and centrifugally cast.

18 It's not in place yet, but we'll be working to 19 get that in place.

20 MEMBER SHACK: I guess, but the utilities are 21 working to the '89 Code, richt, or they've long --

22 DR. MUSCARA: That's right. In the '89 Code, 23 we picked up Appendix VII, which was published in 1988.

l i

24 and Appendix VIII was published in 1990. It's an '89

/~s

'! \

r \s,/ 25 addenda and we had not picked it up yet.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

60 1 But there are activities in place now to pick 2 up the Code sections through, I believe, 95. And Appendix

()

7 .,

~

3 VIII is something that we're looking at picking up as an 4 augmented requirement; that is, picking it up reasonably 5 soon versus in the next ten-year inspection.

6 And part of this presentation had to do with 7 providing some background on the need to do that.

8 MR. STROSNIDER: This is Jack Strosnider. I 9 might just make a couple of comments in response to Dr.

10 Shack's questions.

11 First, as Joe Muscara indicated, since I guess 12 the early or mid-80's, there's been an agreement between 13 the NRC and EPRI and the industry that they will qualify

' 14 inspectors looking at BWR piping for IGSCC through a 1

15 performance demonstration program that was run down at the l 16 EPRI NDE Center.

17 About a year and a half ago, we basically 18 amended that agreement to indicate that the industry could l 19 now use the Appendix VIII PDI, in fact, approach for (

l l

20 qualifying people. l 21 So, we worked out some protocol for people 22 transitioning from the old agreement to the new agreement.

23 So in fact, a lot of people are now actually qualifying 24 through the PDI process to satisfy the IGSCC inspection l

(_,/ 25 requirements.

NEAL R. GR.OSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(232) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 l

l

61 1 And some of the samples that were being used I l

~s: 2 under the old program were put into the new program. And  ;

i t i

'~ ' '

3 I think your second question was basically when people 4 replace their piping, are they still using the qualified 5 methods?

6 And I woulc like to wait until Bob Herman gets 7 here and confirms exactly what they're doing, and let you 8 know. But my -- I think that they are still going through 9 the qualifications for the BWR piping. j 10 And it would be either under the old agreement 1 1

11 or under the new PDI program depending on how recently I 12 they qualified and those sort of considerations. l l

13 ACTING CHAIRMAN SEALE: Any other comments or 7-1/ 14 questions? Yes?

15 MR. DUDLEY: Is there any way to train an i

16 inspector to improve his POD in sizing capabilities?

17 DR. MUSCARA: Yes, there are a number of ways. l l

18 The first one, of course, is to have capable techniques, 19 and those should be based on the physics of the 20 inspection, not necessarily responsive to --

21 MEMBER KRESS: We need a microphone here.

22 DR. MUSCARA: Yes, so the first thing to do is

! 23 to improve the capability of the techniques. And the 24 second item is really to train the inspectors.

( ,) 25 One of the things we found, for example, in l NEAL R. GROSS i COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

62 1

1 IGSCC detection and sizing is that the passing rate again

,- 2 was very low, 40 percent, for new inspectors going through

(

'~

3 the process.

4 But once the inspector qualifies, he does a 5 reasonably good job of detecting and sizing these flaws.

6 On the other hand, we found that if the j 7 inspector does not do an inspection for about a six-month -

l 1

8 period, he's forgotten all that he's learned, or has  !

9 adapted learning that he had developed in his mind. Quite 10 often it's gone.

I 11 So if a person does not look about samples for 12 about 36 months, we found that his POD and his sizing I

13 accuracy goes way down again.

q t

\/ 14 So, it's very important that these inspectors 15 be exposed to conducting inspections and to looking at 16 flaws.

17 Now, conducting an inspection alone is not 18 necessarily enough. Because if you do a field inspection, 19 very often you do not see flaws so that you do not get the 20 chance to go over the argument in your mind on how to 21 detect and size this flaw.

22 And so what one should be doing is to be 23 looking at samples that have flaws. Recognizing that in 24 the Appendix VIII requirements, we had some language that (3 required a qualified inspector to go back on an annual

(_) 25 i NEAL R. GROSS l COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

63 1 basis for what we called " maintenance training."

gS 2 And this maintenance training is supposed to

()

~~

3 provide the inspector with new informaticn about flaws and 4 about techniques, but particularly to allow him some time 5 with samples, to essentially go over his technique on some 6 real samples so he can review and evaluate re al flaws 7 again.

8 Now when we started out, we had about a 40-9 hour requirement in the Appendix VIII. As the appendix 10 worked its way through the different Code committees, it 11 wound up with -- I believe it was ten hours, eight or ten 12 hours.

13 I personally feel that that is not enough, and

'/ 14 I think there are several others on the Staff that believe 1

15 that's not really quite enough training.

16 But the experience is there. If you do not l

17 perform an investigation and maintain your capability, you 18 forget it. And it's a reasonably short time when you do 19 forget it. As I say, we found it's about six months.

20 So, I'm not sure how -- you know, how well I 21 answered that. But capability is important in maintaining 22 experience with the operators.

23 ACTING CHAIRMAN SEALE: Anything else? Okay.

24 Well, we're a little ahead of schedule here.

(,,/ 25 MEMBER SHACK: We could take a break.

NFAL R. GROSS l COURT CEPORTERS AND TRANSCRIBERS l 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 l

l l

64 1 ACTING CHAIRMAN SEALE: I guess we had better n 2 take a break.

i 1

( ./

3 (Whereupon, the proceedings went off the 4 record at 2:30 p.m. and resumed at 2:55 p.m.)

5 MEMBER SEALE: You're still in --

6 CHAIRMAN SHACK: No, this one I think I'm 7 actually okay. I don't work for Bob.

8 MR. HERMAN. My name is Robert Herman. I'm a 9 Senior Level Advisor for Material Science, and I'm here 10 today to talk to you about the use of ultrasonic testing 11 in in-service inspection programs. ,

l 12 And it's basically a generic letter that we've l l

13 got cet on Appendix VIII.

t i V' 14 I guess I'11 digress a little bit before I get 15 started. I never thought I'd sit here and say it's a 16 pleasure to come over and talk to the Subcommittee of the 17 ACRS. But after last night --

18 (Laughter.)

19 MEMBER SEALE: Well instead of asking you how 20 -- why you think you're qualified to be h re, which is the 21 freshman question, maybe I'll ask the post-grad question.

22 What did you do last night?

23 MR. HERMAN: I went over and we had a meeting 24 with Niagara Mohawk on core shroud cracking. And t

n

't)

\

25 subsequent to the meeting, we had a three, three and a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 1

65 1 half hour public meeting on the subject after the l

r3 2 technical meeting.

t i

%) And so if I start talking about core shroud 3

4 cracking halfway through this, don't be surprised.

5 Anyway with that, for a little background on 6 this, in 1970, the NRC observed the fact that improvements 7 were needed in UT to detect and size flaws; in particular 8 with BWR pipe cracks. There were too many examinations 9 where water dripped on the examiner's head following the l 10 examination.

11 There were also other problems with trying to 12 characterize cracks in feedwater nozzles and BWR problems 13 -- the same problem really in PWRs. The reactor vessel

\~ 14 exams, a question about how good the exams were.

15 What's happened with regard to the background 16 of this? NUREG-0313 had recommendations in it for a UT 17 examiner performance demonstration, which was the tri-18 party initiative between NRC, EPRI and the industry to get 19 examiners done.

20 There w,s a coordination plan developed 21 between the folks I just mentioned. NUREG-0619, which was 22 the BWR feedwater NUREG, recognized that UT needed to be 23 improved. And one of the things they were doing on that 24 periodic dropping of the water and the reactor vessel and O

(_) 25 going in and having to do surface exams of the nozzles l NEAL R. GROSS i COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

l (202) 2344433 WASHINGTON, O C. 20005-3701 (202) 234 4433

(

i

66 l

l 1 periodically to ensure that no cracks had initiated, 2 because there was a question about the ability of the UT.

7-

'~

3 The third thing: reg guide came out later, 4 1.159, REV 1, on how to do a UT of a reactor vessel.

5 What's on the street right now? Talk about 6 regulatory requirements for Codes and Standards Rules.

7 50.55(a) is the Codes and Standards Rules in Section XI.

8 What's currently in place is through the 1989 addenda.

9 This addenda does not include the requirements 10 to implement Appendix VIII. UT exams methods are required 11 to meet minimum inspection standards.

12 Most of the things that are in the Code 13 nowadays are methods that amplitude-based. They're l

n

{

s U' 14 prescriptive methods, and they don't require any 15 qualification.

16 Appendix VIII was incorporated into the 1989 aadenda to the Code,Section XI, which was the first time 17 l 18 that a performance demonstration came into -- as a Code 19 requirement. It's not an NRC requirement, it's a Code 20 requirement.

21 Currently, we're in a rulemaking package. The 22 slide that's referenced up here talks about the 1995 1

23 addition for bringing up the rulemaking.

24 Actually, wer'e going to go through the 1996

() 25 addenda I believe.

l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISI.AND AVE., N W.

l l (202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

67 1 The rulemaking is expected in July of 1998.

2 Any changes scheduled, Jack, in the last week?

7-(

)

3 MR. STROSNIDER: Not that I'm aware of at this 4 paint.

5 MR. HERMAN: Okay, this has been a problem. I 6 don't know if you all have had a presentation on trying to

, 7 get this rule out of the House, but it's been aggravation 8 for three years now, or two years.

9 The performance demonstration initiative was 10 established to manage implementation of Appendix VIII.

11 Basically, PDI is working on qualifications for reactor 12 vessel exams for piping and for bolting.

13 There are so.ae other things that are in the

\J- 14 appendices that are in the Code which aren't a part of the 15 PDI program yet. That will be debated at another time.

16 And what is Appendix VIII? Appendix VIII is a 17 mandatory appendix in the boiler and vessel -- excuse me, 18 core shroud cracking -- in the boiler and pressure vessel 19 code in Section XI and the '89 addenda.

20 And effectively what this is doing is going --

21 taking the examination methods and requiring performance 22 demonstration of the equipment, the procedures and 23 personnel that -- what you're really getting into is a 24 performance-based inspection is what it really is when you

,r

) 25 finish it.

' NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

68 1 The testing is on the equipment, the fy 2 procedures, and the personnel, both to detect its size

? i

(_/ These are 3 flaw. I'm not going to read you the numbers.

4 the pass / fail rates that have come up using Appendix VIII, L And it's a highly effective method, in our view, to j 6 qualify UT systems.

7 MEMBER SEALE: Excuse me, Bob. I'm sure )

8 you've sliced and diced these data every way. Let's --

9 have you looked at it, for example, for a given set of 10 test specimens to see how many people you'd have to have 11 look at the same specimen --

12 MR. HERMAN. Joe? l l

13 MEMBER SEALE: -- and be assured that -- let's

( )

'/ 14 say you had a 95 percent probability that one of them 15 would have caught it or something like that?

l 16 I mean, one of the concerns I have: is the 17 problem with the specimen or is it with the detector?

18 MR. HERMAN: Well, a general comment to that?

19 MEMBER SEALE: Yes.

20 MR. HERMAN: I don't think the PDI program 21 itself is a statistically based program, correct?

22 MR. STROSNIDER: This is Jack Strosnider. Let 23 me take a shot at it --

24 MEMBER SEALE: Jack?

p)

( 25 MR. STROSNIDER: -- and give you some NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l

1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

69 1 information along that line.

.r's 2 MEMBER SEALE: Okay, i s

's /

3 MR. STROSNIDER: As Dr. Muscara indicated, l

4 there is, in fact, statistical basis to the PDI program, 5 but it's not -- there are not enough specimens in the 6 program to give you an actual probability of detection.

7 But the way it was formulated is with the 8 strategy of having a poor team; that is, with the low 9 probability of detection, poor sizing capabilities, 10 rejected most of the time, and a good team accepted most 11 of the time. And Dr. Muscara presented some of those 12 results.

13 MEMBER SEALE: Yes.

p.,

! 4 x <

14 MR. STRCSNIDER: The data -- if you could go 15 back for just a second, Bob, to the viewgraph you had up 16 there. The data which indicates that the failure rates, 17 in the middle of the page there --

18 MEMBER SEALE: Yes.

19 MR. STROSNIDER: -- that basically, we went 20 down to PDI and did an audit of the program. And they 21 had put a significant number of people through the program 22 already, 23 And we went through their records to find how 24 many people were passing or failing the qualifications.

(h These, for the most part, are people who were already

(_ ) 25 l

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 l l

70 1 qualified going back in for requalificaCion.

,. ~.s 2 MEMBER SEALE: Damn.

( )

Q ,/

3 MR. STROSNIDER: Again where you see 22 4 percent failed to qualify for flaw detection, I can't tell 5 you exactly what their probability of detection was, okay?

6 But I can tell you that the statistics were trying to 7 screen out bad teams and past good teams in accordance 8 with the numbers that Dr. Muscara gave you.

9 But when we looked at those results, it was 10 very clear that the program is effective and that there 11 are, in addition, a number of people out there who can't 12 meet those minimum requirements.

13 Now with regard to a specific specimen, and is es

\

\w) 14 the problem with regard to the flaw or is it with regard 15 to the people? I guess one thing I could point out is 16 that those statistics -- a lot of those people or teams 17 doing those inspections were using the same equipment and 18 the same procedures. It's from person to person.

19 And you can also look through some of the 20 specimens, and you'll find that some of the specimens were 21 more difficult for the inspectors than others. And there 22 are some specimens in there that trip them up routinely.

23 And then some of the questions we've asked 24 ourselves is well, if some of those more difficult samples

, !j 25 are not in the sample that someone qualifies on, is that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS i 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 l

71 l

l 1 really a fair qualification. And that's a possibility and i

2 we're looking at it. We're trying to figure out exactly f3 l

3 what to do with it.

l 4 I think, you know, we'll bring that to you i 1

i 5 guys' attention. But I guess that's the information I 6 could give you. Bill, did you want to add something to 7 that?

8 MEMBER SEALE: I think you're still all right.

l 9 DR. MUSCARA: Yes, we do have some information 10 to try and answer the questions that the specimens versus 11 the people. In effect, most of the time what we're 12 looking at is upper bound values here because assembles 13 are usually much simpler than what you're facing in an p

t 1 l N/ 14 actual field inspection. j 15 The work that is going on in the IGSCC, those 16 are realistic samples. Those are real cracks and they are l l

l 17 difficult to detect. And that's why you see the passing I i

18 rate as being fairly low, about 40 percent for the first  ;

I 19 time around.

20 We have found that thermal fatigue cracks, l

21 which are a reasonably rough crack and fairly tight l

l 22 because of the process itselt, is as difficult to detect

(

23 as a stress corrosion cre.ck, because it is tight. ,

24 But many of the tests that -- one of the test p.

is ,1 25 data, for example, they were using notches, fairly tight, i NEAL R. GROSS l COURT REPORTERS AND TRf NSCRIBERS I 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005 3701 (202) 234 4433 i

72 l

1 sharp notches, nevertheless notches.

,s 2 So what we're looking at usually is an upper

! )

3 bound. We haven't looked at how many specimens do we need

\

4 to obtain a certain confidence and a certain probability 1

5 of detection. We've done this in conjunction with our 6 water steam generators.

7 But if you're looking at trying to determine a 8 95 percent probability detection with 95 percent 9 competence, you'll need close to 400 specimens.

10 MEMBER SEALE: Yes.

11 DR. MUSCARA: That's why we went to this idea 12 of screening these factors for performance demonstration.

13 Ic's just not doable. But once the program is in place

,3 i 4 x> 14 and it's in place for a number of years, and many, 15 inspectors go through, then we could say something about ,

1 16 the statistics of the population if not of the individual 17 inspector.

18 But if we're doing work where we need to know l 19 what the POD is, for example the PTS issue, then I don't 20 see any other way out but to run enough specimens with the 21 appropriate personnel, procedures and equipment to get 22 some feeling for what the POD is for the crack size of l

(

I 23 interest.

24 MR. HERMAN: On the issue of the program

/~'

( ,s) 25 itself, I got back from a meeting that was an IAEA meeting

! NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005 3701 (202) 234-4433

73 1 on qualifications. And there's quite a bit of a different 7eN, 2 approach in Europe on qualifications than here.

Q .,/

3 We're using a technique where we go through 4 and qualify the procedures and the equipment first with, 5 let's say, a warm up period for that and then a closed 6 test, and then qualify the examiners.

7 The European approach is what they call an 8 "open approach." They put together a qualification 9 dossier, which is theoretical background on why the 10 procedure would work.

11 They collect information on where it's been 12 -

used in the past, things like that, and don't do a blind 13 test of the procedure and equipment qualification.

i )

14 They do do the examiners, and that's something 15 that's in the midst of trying to get resolved. We kind of 16 make noises that well, we can't do something the same as 17 the Europeans as part of getting ready to take the test.

18 But we have the additional feature of a blind 19 test, which you have to find all the flaws in to qualify 20 the procedures and the equipment.

21 So, that's still up in the air a little bit 22 too in terms of the international aspects of it.

( 23 MEMBER SEALE: One other comment --

24 MR. HERMAN: Sure.

(_) 25 MEMBER SEALE: -- that I'm sure won't give you l NEAL R. GROSS COURT REPORTERS AND TRANSCR:BERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTCN. D C. 20005-3701 (202) 234-4433 l

74 1 any help, but I'll make it anyway. When I see that kind 1

r~ 2 of failure rates with people who have been qualified, it

(/

3 makes me wonder if there aren't good days and bad days.

4 In other words, the performance of an 5 individual may vary somewhat from time to time because of 6 whatever.

7 MR. HERMAN: It seems like some -- one of the 8 -- one of the things, at least on the detection, and 9 correct me if I'm wrong -- I think there were some fairly 10 tight fatigue cracks, some particularly difficult cracks ,

11 to find.

12 MEMBER SEALE: Yes.

13 MR. HERMAN: And I think that was part of what (d!

14 was driving our rate up.

15 DR. MUSCARA: May I add something N that?

1 16 MEMBER SEALE: Yes. ,

1 17 DR. MUSCARA: This is Joe Muscara with the i

18 Staff. You're quite right. It -- sometimes it is, you 19 know, a bad day for an inspector. l 20 In the test program, we conducted an action l 21 which was a human factors action. And one of the tests we 22 conducted was essentially to have several commercial 23 inspectors participate in a test where he was being viewed 24 as to what he was doing and how he was performing.

p

() 25 He was exposed to a number of samples for a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

l 75 l

l 1 period of two weeks, and then his performance was l

,, 2 evaluated.

! / 3

\ J

~~'

3 And in fact, what we found was that the 4 inspector does not perform very well at the beginning of 5 his task. So the first two or three days, he performs at 6 sort of a middle level.

7 MEMBER SEALE: Yes.

8 DR. MUSCARA: In the middle of his campaign, 9 he performs much better. And towards the end of the 10 campaign, he's excited about going home, and he's 11 performing more poorly.

12 Other things that they looked at were the 13 effect of the environment. If there's a lot of heat and t

'/ 14 humidity, he doesn't perform nearly as well. We expected 15 that. (

16 But they also added some information on the  !

17 length of the inspection day.

18 MEMBER SEALE: Yes.

19 DR. MUSCARA: And what they found was that an 20 eight-hour day was okay. He performed at his normal 21 level. A ten-hour day was okay, but a 12-hour day was 22 not. His performance was really quite poor at ten versus 23 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

24 And that's something that I didn't discuss,

,) 25 but that's something we need to consider in doing a l NEAL R. GROSS

! COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON. D C. 20005-3701 (202) 234-4433 i

i

761 1 performance demonstration program.

l

[ ,

2 Should we get the inspector when he's fresh in .

( ) '

l l 3 the morning and have him do the test? Or should he be 4 conducting a test for eight hours and then grade him on l

5 the last two hours of the test?

6 I mean, in the field, after all, they do work i 7 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts, and sometimes more.

8 MEMBER SEALE: Oh yes. 1 9 DR. MUSCARA: So, it's an important factor.

10 How fresh is the inspector, and how long has he been at 11 his task?

12 MEMBER SEALE: And don't buy a car that was 13 assembled on a Monday or a Friday.

1

,r\

i )

\/~ 14 (Laughter.)

15 MR. HERMAN: In getting back to this --

16 MEMBER SEALE: Sorry.

17 MR. HERMAN: No, that's all right. Why do we 18 need Appendix VIII? And I think the answer to it is that 19 we think that the existing regulatory requirements might i 1

20 not be adequate to ensure that flaws can be reliably ,

1 21 detected. l l

22 I've got a couple of examples down here. l l

23 There's probably some debate about the examples. The l 24 Browns Ferry situation -- the fact of the matter, if you p

( ,) 25 ran one procedure with Section XI using the prescriptive NIL 4L R. GIUDSS l COURT REPORTERS AND TRANSCRIBERS i 1323 RHODE ISLAND AVE . N W.

l (202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 1

77 1 exam, you had to evaluate two flaws.

~s 2 If you ran the Appendix VIII qualifying

\

\ /

3 procedure, you had to do 15.

4 Now, the significance of what that was, I'm 5 sure that that's -- that that, in itself, is a terribly 6 significant issue. I think a lot of those were embedded 7 indications that probably weren't too significant anyway.

8 But the fact of the matter is, the more 9 qualified -- the exam that was qualified was a more 10 stringent exam and identified more defects.

11 The second item is IGSCC detection in piping 12 at Millstone. A new technique was discovered where they 13 identified 35 cracks, and 14 of them were previously i 1

's '

14 identified as geometry or non-metallurgical type 15 indications. That's true with the new technique.

16 There's also some question on the Millstone 17 data, whether or not they knew about it the first go-18 around and whether they should have been called IGSCC 19 cracks the first time.

20 So you know, there are examples, but I 21 wouldn't -- I wouldn't get overboard with them.

22 I think the fact of the matter though is that 23 we're pretty sure that a demonstrated UT method is a lot 24 better for doing piping exams, doing vessel exams, than

) 25 what we're working with today.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASH'.NGTON, D.C. 20005-3701 (202) 234-4433

i 78 '

1 i 1 And the question is that why do we need a j gx 2 generic letter? We think that the generic letter is

( )

3 impo:. tant now, especially in the interim until rulemaking 4 comes out, to emphasis the importance of Appendix VIII, 5 that we get qualified examinations that really do the job.

l 6 I think both the industry and the NRC 7 recognize that performance demonstration is needed.

8 There's a PDI program established to try to implement most 9 of the requirements in Appendix VIII.

i 10 And I don't think it's a question that it's 1

11 needed. A problem that we have now is the rule, if it  ;

1 12 stays on the schedule that we're talking about, is not l

13 expected to become a requirement until July of 1998.

l l \ '

k/ 14 The generic letter, in our view, will show j 15 support for Appendix VIII right now, and it will also l 16 indicate NRC support for the PDI initiative.

17 The program at PDI has been underway for, 18 what, three years is it, Ben?

19 DR. MUSCARA: Five years. -

20 MR. HERMAN: Five years. And what I would 21 guess, $8 million, $10 million, maybe more.

22 DR. MUSCARA: Eleven million.

23 MR. HERMAN Eleven million dollars. It I

24 wasn't a bad guess at the numbers. And what's happening, rN y ) 25 it's running out of gas in terms of industry support l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005 3701 (202) 234 4433

l 79 l 1 because the update to the rulemaking process has been (

,r ms 2 delayed. And there's no requirement on the street. Money (m,)

3 is getting tough, and people are saying "Why do I need to 4 do this if there's no requirement on the street to do it?"

5 The generic letter, excuse me, will encourage 6 licensees to use Appendix VIII for the upcoming augmented 1

1 7 vessel exams.

8 Recently, the rules were changed to require I 9 100 percent of reactor vessel inspections, and within a j 10 time period. That time period is about up. And if people 11 are doing the exams, some vendors are already qualified. l l

12 And we think it wculd be good, especially 1

13 depending on hcs often you're going to do that inspection, j i

/  ;

)

~' 14 to get a good baseline on what's in those reactor vessels.

15 Excuse me.

16 The purpose of the generic letter is to notify 17 licensees of UT enhancements and deficiencies in the 18 current UT qualifications, determine how the industry 19 plans to ensure that flaws in the reactor vessel and 20 piping are reliably detected in size.

21 It's basically figure out what the industry is 22 intending to do and determine the extent to which 23 licensees are using or planning to use performance 24 demonstration to qualify UT. Are they committed to do o

i m,)' 25 this now or when they do their program updates, or where NEAL R. GROSS l COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 l

80 l

1 do they really stand?

l 2 Now, this is the part that Kurt likes the

, ~ss 1

1

\ j l

3 best. It's the regulatory basis for the generic letter.

l 4 In our view, 50. 55 (a) requires conformance with ASME III 5 and XI. I don't think there's any questions on that.

6 One of the things that we're doing is 1

7 gathering information in this letter to see where we are '

8 in terms of requiring augmented inspections. Conceivably 9 if we collected information that the inspections are j 1

10 deficient and people aren't updating their inspections to l

11 current programs, there might be a need -- and I say )

12 "might" -- to come out with augmented inspection l

13 requirements under 50.55 (a) (g) (ii) .

iO) k/ 14 Also, we're looking for a high assurance that 15 there's -- that GDC 14 is met, that we have confidence 16 that the reactor coolant boundary will have a low 17 probability of leakage, and will be free from rapidly 18 propagating failure and gross rupture.

19 Further, Appendix B Criterion 16 requires that 20 measures be established to assure conditions adverse to 21 quality are properly identified and corrected.

22 If you're doing the examinations that you feel 23 are insufficient, it might not meet that Appendix B 24 requirement.

O Appendix B Criterion 2 requires QA programs to

() 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

81 l

l 1 take into account the need for verification of quality by

,s 2 inspection and test. Also a program should provide for i )

4

' ~~/ indoctrination and training of personnel to assure 3

4 suitably -- suitable proficiency is achieved and 5 maintained. And that's another Appendix B requirement.

6 How sloshy are those? We probably don't want 7 to debate it today.

8 The conclusions: experience, such as PISC, 9 BWR pipe inspections, other inspections that have been 10 done on piping. The PDI in Appendix VIII vessel exams 11 indicate that current inspection requirements may not 12 ensure that flaws are reliably detected in size. I don't 13 think anybody will debate that one too much.

lp j

\/ 14 Significant improvement can be made in 15 volumetric and NDE reliability if a system is put into 16 place for performance demonstration procedures, equipment, 17 and personnel.

18 Further, the generic letter will establish to 1

19 the extent to which Appendix VIII is planned or not for 20 reactor vessel and piping exams, the generic letter, I 21 would argue, would encourage the licensees to use Appendix 22 VIII aii perhaps the PDI initiative for implementing i 23 Appendix VIII, which has basically been completed for 24 reactor vessel and piping exams.

(gx.-) 25 And the generic letter in our view will I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l 1323 RHODE ISLAND AVE., N.W.

WASHINGTON, D.C. 20005-3701 (202) 234-4433 (202) 234-4433 l

l

, 82 l

l 1 demonstrate the NRC support for Appendix VIII until l

l fs 2 rulemaking is complete.

~

! i l

\. /

l 3 Maybe I ought to say a little bit about i

4 schedule. The generic letter has been on the street. We 5 have received industry comments. As you might suspect, 6 one of the comments might be, why do you need this thing 7 when you're doing rulemaking? That, and some other issues 8 are under review.

9 This is not our highest priority generic 10 letter. We're reviewing those comments. And if the rule 11 overtakes the ceneric letter, then so be it. If it 12 doesn't, then we'll have to cross that bridge when we come l

13 to it.

l

T o i '/

14 MR. STROSNIDER: This is Jack Strosnider. I'd l 15 like to just add a little comment to the conclusions here, i

16 the summary. You heard the presentation by Dr. Muscara, 17 and also Bob Herman went back through some of the history l 18 on the development of inspection methods to move toward 19 performance based demonstration and the value of it.

20 But all the discussions were in something of a 21 general -- more of a generic nature. But I do want to 22 point out from the regulator's point of view, when you 23 look at the statistics that came out of our audit, PDI, 24 and you look at the number of inspectors who are failing r~~,

(_) 25 those tests, it's very difficult as a regulator not to ask NEAL R. GROSS l COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE , N.W.

(202) 2344433 WASHINGTON, D C. 20005 3701 (202) 2344 433

83 1 yourself the question at least, are people really e,-

2 providing at a level of quality that you expect from these

i i/

3 inspections?

l 4 And you look at the statistics associated with '

5 those rejections in the statistical design of the test, )

6 you look at the failure rates, and you'll say people can l 7 do and probably should be doing better, right? I l

8 And that's the driving force for this letter 9 is to call that to the attention of the industry, and 10 basically make sure that the industry is assessing it and ,

1 1

11 that they're recognizing the importance of performance 12 demonstration qualification. l 13 So, I think you know, when you get away from 1

.\> 14 just the general concept that this is a good thing to do, 15 we're confronted with some statistics that show very 16 clearly that there's people out there who can't pass this 17 kind of test.

18 You have to ask yourself the question: Should 19 they oe doing the inspections? There's a lot of detail 20 that goes around with good day / bad day sort of issues, and 21 how frequently you need to refresh people's memories, et 22 cetera.

l l

23 But that's all part of the issue here and why 24 the industry needs to pay attention. And that's really

(_) 25 the driving force for this letter.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

84 1 And the other comment I'd make is we had a lot ,

l 2 of discussions within the Agency and with this Committee

,\

L~') now about the concept of performance-based regulation.

3 4 And I think this is an example of performance-5 based regulation. Agai:,, we're moving away here from 6 prescriptive methods for inspection and telling the 7 industry we don't cava how you do this inspection. You 8 don't have to do this with ultrasonic testing. You can do 9 this with eddy currents or any method you want to use.

10 You come in and show that you've satisfied 11 these statistics, and this is a performance-based 12 regulaticn.

13 And I think there's some meat to it, all

/ \

'w- 14 right? So, I think it's consistent with our philosophy 15 also, and our regulatory philosophy, of moving toward the 16 performance-based arena.

17 MR. HERMAN: I think the UT area what you're 18 really getting away from is something where you go out 19 there and do a cookbook for coming up with a UT p1 udure.

20 And basically, what you do is design a UT procedure that 21 you expect to be able to find the kind of defects that you 22 want to be looking for.

23 And what the Appendix VIII does is demonstrate 24 that the equiptc.ent and the procedures and the people can r~T

(_,) 25 use that procedure to do the job they're supposed to be NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l 1323 RHODE ISLAND AVE., N.W. 1 (202) 234 4 433 WASHINGTON, D C. 20005-3701 (202) 2344433 j 1

85 1 doing.

2 And with that, I'll say adieu unless you have

!n l l

a 3 any further questions. ,

1 4 CHAIRMAN SHACK: Well, I guess, the question j 5 is why it takes so long to get 50.55(a) up there.

6 MR. HERMAN. I'11 defer that to management.

7 (Laugher.)

l 8 MR. STROSNIDER: I guess that's me. This is 9 Jack Strosnider. What I'll tell you at this point is that 10 the 50. 55 (a) package is much broader, of course, than just 11 this issue. And the issue that's been slowing down the 1

12 promulgation or getting that our for public comment is the 13 update portion.

7 t i 14 And that is, how often do licensees need to 15 update their programs in accordance with the Code?

16 We had a cost beneficial licensing proposal 17 from one of th;.li mneeea a couple of years ago. It was 18 probably two and half years or so now, while we were 19 working on this. And you had to go through the assessment 20 of that.

21 And there's been a number of things that have l

l 22 changed. In going through that process, there are a 1

23 number of issues that have -- I can't really say anything 24 has changed, but a number of issues that have come up with V' 25 regard to cost beneficial licensing, which the proposal l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

(202) 234 4433 WASHINGTON, D C. 20005-370, (202) 234-4433

86 1 was basically to update voluntarily subsequent additions g3 2 of the Code. l

() 3 And then we had to go through and decide well, l

4 there are parts of the Code that we feel really need to be l l

5 backfit. Is that the appropriate way to do it? What's l 6 the impact if you go to that method on the ASME Code 7 process? ]

I 8 We've had recent discussions with the l

9 Commission to say, you know, you ought to make optimal, 10 maximum use of the code and industry standards.

11 There's a number of competing considerations 12 with regard to how to do those updates. And quite 13 frankly, it's been bouncing around for some time as to

/

I i/

'- 14 what the most appropriate way to do that is.

15 In the meantime, this issue and some other 16 issues that are in that rule package have -- have not 17 gotten out for public comment. And we've been pushing 18 hard to get this rule package complete and get it out for 19 comment because these are important issues. j l

20 That's about the best explanation I can give 21 you really.

22 CHAIRMAN SHACK: But I take it from Bob's l l 23 statement thac if I was a utility hiring an inspector, you 24 know, I'd certainly want him qualified. I mean, why waste l s% l k ,) 25 my time and money on a guy that hasn't passed chis course?

i i

! NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

l (202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 204-4433 l

87 1

73 2 MR. STROSNIDER: Well, I think that's a good l \

V 3 point. You don't want people out there just going through 4 the motions. You want to know that they are qualified.

5 And I think this letter -- and we've made it clear in this 6 letter and in all our other meetings that we are pursuing 7 implementation of Appendix VIII.

8 You know, it's a Code, industry-developed 9 standard. It makes sense to us. From what we've seen of 10 its implementation at PDI, it looks like it can 11 significantly enhance the quality.

12 And that's the direction we're headed, and I 13 think -- I think, you know, it's only fair to let -- make

,,~

Y 14 sure the industry is aware of that.

15 And one of the concerns -- you know, we do --

16 I want to emphasize, we want to get the rule out as 17 quickly as possible. But recognizing the schedule we're 18 at now -- and another reason for this letter was that we 19 don't want, you know, several more outage seasons to go by l 1 20 before people really take advantage of this qualification 1

21 method.

22 So you know, we're asking licensees in this 23 letter, go look at these data, look at the results of 24 this, and convince yourse]f that you really start a (q ,/ 25 qualification that you ought to have in doing these l NEAL R. GROSS l

COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N W.

l l (202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433

88 1 inspections. l l

,s 2 MR. HERMAN: What I would say right now, I  ;

i \ \

L) l 3 think, to be fair about the thing: times are tough, money 4 is tough. And if it's 150 bucks an hour to get a pipe 5 examiner that's qualified versus not qualified versus a  ;

l 6 hundred bucks an hour to get somebody that is qualified, 7 and I don't have a requirement to do it, money is tough.

8 MR. STROSNIDER: You need to understand the 9 utilities are certainly looking at the economic aspects.

10 I don't know how big of an issue that is here. I'm not 11 sure what rates are being -- but you know, regardless of 12 what the economice are, you know, in regard to having a 13 good Appendix B, a g000 quality inspection, we think this

)

'/ 14 is clearly the sort of thing that people need to be doing.

15 CHAIRMAN SHACK: If there are no further 16 questions, I think that -- Joe, do you have a comment?

17 DR. MUSCARA: Maybe I could make a comment.

l l

18 Bob showed you some data from the PDI program on the ,

l 19 passing rate of the inspectors that went through. Let's l 20 say it was around 40 percent. Well, that means at least l

21 if we use a screening test, we choose only the best 22 inspectors to do our inspections.

23 We have also looked at the capability of 24 inspectors that participated in the PISC exercise on

[]

( ,) 25 pressure vessel steels. And in effect, we chose those NEAL R. GROSS l

COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N W.

(202) 234-4433 WASHINGTON, D C. 20005-3701 (202) 234-4433 i

i

89 1 combinations of inspectors and samples that would have met

, f~s 2 the Appendix VIII requirements with respect to the numbers 3 and sizes of flaws.

4 And what we found was that the inspectors that 5 were using effective procedures for the kind of flaws they 6 were trying to detect, would flunk.

7 But the effective inspectors who had a 8 procedure, for example, for underclad cracking, they would 9 use a procedure that was specifically developed for 10 underclad cracking.

11 So effective inspectors, the procedures did 12 pass. And then especially if he tells us that it's an 13 Appendix VIII requirement is quite a good one, it does do

/_N

, i N/ 14 a good job of screening out poor inspectors whether you're 1

)

15 looking at piping or vessel materials.

]

1 16 And it's been shown by the PDI exercises and I

17 by the PISC exercises in a subsequent evaluation of those j 18 results.

19 CHAIRMAN SHACK: Well, if there are no further 20 comments, I think we can recess for the day.

21 (Whereupon, the meeting was concluded at 3:29 22 p.m.)

23 24 p

() ,

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234 4433 WASH;NGTON, D.C. 20005-3701 (202) 234-4433 l

l

lO j' CERTIFICATE ,

l This is to certify that the attached ,

l proceedings before the United States Nuclear l

l Regulatory Commission in the matter of:  !

Name of Proceeding: MATERIALS AND METALLURGY I Docket Number: N/A l

i-Place of Proceeding: ROCKVILLE, MARYLAND

! i l

i were held as herein-appears, and that this is the original .

l-  !

l- transcript thereof for the file of the United States Nuclear  ;

Regulatory Commission taken by me and, therealter reduced to i lO l-typewriting by me or under the direction of the court  ;

i reporting company, and that the transcript is a true and .!

1 l l '

accurate record of the foregoing proceedings.

I

~

4fL4 YORBETF NINER  ;

official Reporter l Neal R. Gross an.i Co., Inc. l l

l e

r

?

O l

NEAL R. GROSS ,

COURT REPORTERS AND TRANSCRiflERS 1323 RilODEISLAND AVENUE,NW 1 (202)234-4433 WASlilNOTON, D C, 2000$ (202)2344 433

INTRODUCTORY STATEMENT BY THE CHAIRMAN OF THE i MATERIALS & METALLURGY SUBCOMMITTEE p 11545 ROCKVILLE PIKE, ROOM T-2B3  !

Q ROCKVILLE, MARYLAND i APRIL 15-16, 1997 The meeting will now come to order. This is the first day of the meeting of the ACRS Subcommittee on Materials & Metallurgy. I am i William Shack, Chairman of the Subcommittee. I have a :onflict of interest with some topics of today's meeting. During the i discussion of those topics, Dr. Robert Chairman.

Seale will serve as t

l The ACRS Members in attendance are:

l I

Thomas Kress and Robert Seale.  !

l The purpose of this meeting is to hold discussions with representatives of the NRC staff and Consumers Power Company concerning generic letters associated with steam generator tube inspection techniques, effective use of ultrasonic testing l techniques in inservice inspection programs, degradation of steam l generator internals, and degradation of reactor vessel head 1 penetrations.

I We will also discuss the status of issues related to l

reactor pressure vessel integrity. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions as appropriate, for deliberation by the full Committee.

l l

Noel Dudley is'the Ccgnizant ACRS Staff Engineer for this meeting.

The rules for participation in today's meeting have been announced as part of the notice of this meeting previously published in the Federal Register on Anril 4. 1997 .

l A transcript of the meeting is being kept and will be made available as stated in the Federal Register Notice. It is requested that the speakers first identify themselves and speak with sufficient clarity and volume so that they can be readily heard.

We have received no written comments or requests for time to make oral statements from members of the public.

! (Chairman's Comments, if any)

{

4 We will proceed with the meeting and I call upon Steohanie Coffin of NRR to begin.

I l -

NRC STAFF PRESENTATION TO THE ACRS

SUBJECT:

GENERIC LETTER

" Degradation of Steam Generator Internals" l DATE: April 15,1997 PRESENTER: Stephanie M. Coffin Materials Engineer Materials and Chemical Engineering Branch Division of Engineering 415-2778 .

SUBCOMMITTEE: Materials and Metallurgy

PURPOSE OF GENERIC LETTER

  • Request information to verify acceptable condition of steam generator internals 4

2 l

2

o o o y:

DAMAGE TO STEAM GENERATOR INTERNALS AT FOREIGN PWR FACILITIES Plants similar to Westinghouse Mod'el 51 Steam Generators

1) Wastage of the uppermost support plate--  !

Misapplication of a chemical cleaning process

~

2) Broken tube support plate ligaments at uppermost TSP--

Excessive stress during final thermal treatment j

3) Wastage of tube support plates at various elevations-- t Cause is undetermined; not associated with chemical cleaning
4) Tube bundle wrapper drop and cracking of the wrapper--  ;

Excessive stress during cooling transient, poor welds; ,

cause of cracking unknown j i

i 3

O O O ~;

SIGNIFICANCE OF EVENTS e Degradation of the tube support plates and the tube bundle wrapper could affect the integrity of the steam generator tubes e Tube support plates prevent lateral displacement, vibration, and minimize bending moments in the tubes j e Fall of the tube bundle wrapper can lead to a loss of feedwater, damage to steam generator tubes I

l 4

i l

O O O

~

~l FOREIGN RESPONSE TO STEAM GENERATOR INTERNALS DEGRADATION To detect wastage and cracking of tube support plates:

  • Visual and video camera inspections of the secondary side Response: ,
  • Tubes without adequate lateral support are stabilized and plugged 5

O -

O O

~

FOREIGN RESPONSE TO STEAM GENERATOR INTERNALS DEGRADATION To detect tube bundle wrapper drop:

  • Visual and video camera inspections of the secondary side
  • Online instrumentation of the bundle wrapper

~

Response

  • Repairs completed on damaged bundle wrappers 6

O O O DOMESTIC EXPERIENCE i Cracked or deformed tube support plates found at dented intersections in U.S. steam generators (Surry 1&2, Turkey Point 3&4, San Onofre 1, Indian Point 2, Millstone 2)* *

  • t EDF experience indicates there may be other mechanisms  ;

which lead to support plate damage t

e Eddy current indications will be visually inspected this spring outage at Diablo Canyon

~

  • Eddy current and visual inspections performed at Braidwood Unit 1 and Byron. Unit 1 found no evidence t of tube support plate or tube bundle wrapper degradation
* * *Except for IP-2, all SGs replaced or plant was shutdown
7 i

O O O

~

APPENDIX B CRITERIA i CRITERION XI, " TEST CONTROL" Program shall be established to assure that all testing required

to demonstrate that SSCs will perform satisfactorily in service

! is identified and performed CRITERlON XVI, " CORRECTIVE ACTION" Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies,

deviations, defective material and equipment and nonconformances are promptly identified and corrected 8

i

O O O

~

t

REQUESTED INFORMATION i

! i i

Request the following information:

  • Discuss program to detect degradation of internals, if such a program exists  !

Reviews of past eddy current data 4

Secondary side visual / video camera inspection I results l Description of degradation, how assessed and dispositioned i

l e Discuss plans for establishing a program or justification as to why no such program is needed j i

i 9

o O O PUBLIC COMMENTS NUBARG

  • .GL implies licensees should perform inspections of SG internals
  • Complete a backfit analysis, justify the need for the information f and any new positions on inspection requirements i

NRC POSITION

  • Appendix B Criteria XI and XVI, " Test Control" and " Corrective i Action" apply l

l

  • GL does not promulgate new or revised staff position or l requirements 1

( i

  • GL requests information to assess the applicability of the foreign experience to U.S. SGs l  !

10 i

O O O '

PUBLIC COMMENTS, continued NEl

  • GL imposes actions for licensees to perform inspections of SG internals e industry task force formed which will address GL concerns; no need for GL NRC POSITION
  • GL requests information on actions taken in accordance with Appendix B criteria GL needed to obtain and document information from !icensees-11

_ - - _ _ - - _ - - _ _ _ - - - - - _ - - - - - - - _ - - - - - _ - - _ _ _ - - - - - --_ --__-I

O O .

O .:

t STATUS OF GENERIC LETTER i Public comment period expired March 15th

NRC staff addressing comments t

i Expect coordinated industry response to GL through NSSS vendors and NEl/EPRI '

t I

i i

i 12

~'

O O O BACKGROUND ON ULTRASONIC INSPECTION RELIABILITY AND PERFORMANCE DEMONSTRATION ACRS SUBCOMMITTEE MEETING MATERIALS & METALLURGY ROCKVILLE, MARYLAND pa "'%

s.

+++++

April 15,1997 J. Muscara, Senior Metallurgical Engineer Electrical, Materials, and Mechanical Engineering Branch Division of Engineering Technology Office of Nuclear Regulatory Research (301) 415-5844

O O O

~!

RESEARCH EFFORTS PROGRAM TITLE:

Evaluation and improvements it: Nondestructive Examination (NDE)

Reliability for Inservice inspecti)n of Light Water Reactors Program initiated in Fis al year 1977

, Program O_bjectives:

Determine the reliability of ultrasonic inservice inspections (ISI) performed on commercial, light water reactor pressure vessels and piping.

Recommend Code changes to the inspection procedures to improve the reliability of ISI.

l Based on the importance of components to safety, material properties, .

service conditions and NDE uncertainties, formulate improved inservice inspection criteria (including sampling plan, location, l frequency and reliability of inspection) to achieve suitably low failure probabilities for the inspected components.

1 l

i BACKGROUND l

l t

Cold leg break study - need for NDE reliability data (POD & sizing). '

Concerned about the quality, frequency and extent of the ISI being performed.

Inability to detect intergranular stress corrosion cracking in the primary piping of BWRs in the early 1970s.

J PVRC and PISC 1 programs identified need for improvements in ASME Code procedures for inspecting pressure vessel steels.

i i

l i

o o o ~

EVALUATION OF NDE RELIABILITY ~j i

Conducted extensive parametric studies on important inspection variables - 6000 measurements i

Developed recommendations for improvements in procedures i

i RIL #113 in 1981  :

ASME Code Case N-335 in 1982 Conducted two round robin tests to quantify POD as a function of  ;

crack size, false call rate, and sizing accuracy.

Piping inspection Round Robin in 1982 i

i 6 ISI teams that conducted 1500 inspections.

i t

- Mini Round Robin in 1985 12 individuals and 3 automated inspection teams.

t 3

O O

~

O  :

EVALUATION OF NDE RELIABILITY (Cont.) i

, i PIRR (NUREG/CR-5068)

Clad Ferritic Material - 32" diameter, 2-3/8" wall thickness.

4 -

16 Thermal Fatigue Cracks

. Length from 1.25" to 3.1"

. Depth from 0.3" to 1.1" -

CCSS - 33" diameter, 2-3/8" wall thickness i

19 Thermal Fatigue Cracks

. Length from 1" to 4" {

. Depth from 0.3" to 1.25" i t

Wrought Stainless Steel - 10" diameter, 0.5" or 0.6" wall thickness 23 IGSCC and 28 Thermal Fatigue Cracks Length from 0.16" to 2.3" for IGSCC and 0.33" to 2.4" for TFC Depth from 0.1" to 0.21" for IGSCC and 0.12" to 0.33" for TFC i 4

f

O

~

O O EVALUATION OF NDE RELIABILITY (Cont.) -!

l  :

f i

MRR (NUREG/CR-4908)

Wrought Stainless Steel - 10"and 12" diameter, 0.6" to 0.85" wall thickness I

Total number of 1GSCC w as 28 Flaw length varied from less than 1" to 40" Flaw depth varied from 0.033" to 0.45" t

t i

i I

5 i

. -- . ..~. -.- -.. . - . .~.- .-- - .-.. - . = . ..

(-

) .

NUREG/CR-1696 i

\

10 - - . . - - -

,;_y I

.g. ,

6 ._ .

_._..j]' ,p .9~ 3wA J:E- t c-

.,.- >q,:: 7 --+

o \

~

.e E 7 ;<g '. , . - -

3.

O o ,i t

j "

1

-- -- " _s _

Transducers o '

s' ,/ ,i.

,M 4 -6 / j,f G ,

/ /

114 in. diam eter

/ /

% /

e / l' I' '

/

/

-l l - 1/2 in. diameter '

] -10

=

g- j

- ,f.-

M - 1/2 in. x 110 in.

R / /,

E -15 / G .

e 1.o in. diameter g .  ; --

u 11 /,'. '

3 20 a.

// .

// j

//

  • 25 f

/ '

A I

-30 1 -

1 I

0 0.04 0.08 0.12 0.16 0.2 0.24 0.28 0.32 y I'

Saw Cut Depth (inches) t 4  :

Ultrasonic response from vertical saw cuts for a % V path at an inspection angle of 45* for transducer elements of different sizes I

6 I

6 I .. _ - _ . . . - - - _ - - . _ . - _ - - - - - - - - - - . - . - - - . - - - - -- - - - - - - - - - - - --------------------!

. _ _ . _ _ _ _ _ . . _ . _ . _ . _ . _ _ _ . . _ _ . . _ . _ . _ . . _ _ _ _ _ _ _. . ~ . . _ . . _ .

p -

I4UREG/CR'-

1 l

4 Plot of POD Versus Crack Depth for Clad Ferritic, Wrought Austenitic and Cast Austenitic Pipe l

1.00 -

Clad Ferritic  !

N 33" Diameter '

2 3/8" Wall Thickness ,

1 g 0.80 -

o e

5 i O O.60 - '

>. \ 10" Austenitic Pipe-(lGSCC) 0.6" Wall Thickness 5m 0.40 -

i

.O .l 4 O

O.20 -

M Cast Austenitic Pipe  ;

33" Diameter,2 3/8" Wall Thickness O l , l  ; l

! O 10 20 30 40 50 I Through-Wall Crack Depth,% j t

' [

7 '

p .

NUREG/C - 8 .

., l . . -

a e f * * *

  • O

,s k

  • g**

^

- [.cwv l 3

<2  ; _; ,,

u

  • 0 - -

0 5 10 is m a m s se ao as se as se 45 s.

3 e e m . is y

mo m%. .i (a) (b)

K

  • a m

. 7. .  :

8" . rc

.s "

h n - = .

u

.. a , ,. .

. . _ _ is _ a. as a u .s se em o n ==-e.-=>

(c)

PIF, R detection performance conducted in early 1980s for POD versus crack depth in a) centnfugaty cast stainless steel, b) clad ferntic, and c) urought stainless steel with IGSCC and thermal fatgue cracks 8

_ _ __ . - . _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ - - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ = _ _ _ - _ - _ _ -_ - - - . - - . . .. . . . . - - . . . - - . . .

f

~

O O veee,ceO

-Near Side vs Far Side inspection Results 100 _

1 Material 10 in. (250 mm) 304S i with IGSCC '

Schedule 80 (0.6")

._ 80 _ Average of Six Tet ns 3 Procedure - ASME Jode T/R <

'b

_ '- . ~ .

N 3 _~

- Near Side \:~i- ~-

60 ,

g j -

\

a f Near Side Access

~

7 40 -

i$ ..

x 20 _

T/R

- - - Far Side ... ,

O I I I I I

O 10 20 30 40 50 Far Side Access Through-Wall Crack Depth (%)

9

NUREG 08 Probability of Detection Performance for PIRR -

Thermal Fatigue Cracks,304 ss 10 Schedule 80 -

o. -

__________- , _ _ _ _ , _ __-__;==_--_-__: =_-____

,, s' p s

i

' ,' s s s' G, ,' ' '

a'

,si , ,

/, ' p' ,

s ,

00, __

, 'r ,' ,' , ,

o sr ,' ,

,' s' ,

,i r ,'

i i

s f' / . /

i g' / / ,

i f f '

' /

,/ / ' / \

i w q,,yerage Near ,

, Side ,' ,

t f r s o - ,,oi ,

- - 7 i'

o ,' ,'

O , '1, , ' ,'

, e ,

o ',' - ,'

r i

,' i D. , ,' ,

s ,' i

,, ,' s j

f Side Avera  !

y, ,' f

,i ,'

/ ge ar

, <  ?

  1. .a # ,

' l

,,' /

s' \

C\J ,'  ;

O ~ ' , ' '/, ,

/i ,' '

s' *

- y,,'

+,

/  !

ar -

i 9_ i o  !

. t

' I i l l 0.0 0.5 1.0 1.5 2.0 i i

i Depth (cm) i L

10  ;

-. .- , , ~ - , _ , . - ~ . - - , ~ . . . , . . _ , . , . , . ,m. , , , _ _ , , - - .----..-.-..~,,2---4 . . ,-

O O O 09 i NUREG/CR-4908 08 -

w -_... _ _ . ._

07 .... I_ __ ._ - _ - - -

06 . . _ . _ .__... . _ _ .. _ . _ _ . _ _ - . _ _ _ _ . . _ . . _ _ . _ . - . _ _ _..__ _

05 _.__ . , _ . .. _ _ _ _ __ _ - -

04 * -, _ __. . _ _ _ . . _ _ . _ . ._ _

0.3 -_

02 s . .. e _ ... . _ _ _ . . _ . _ . . . _ . -. - - _ - .- - _ _. . . _ -

P1 . _ _ .

0 0 2 4 6 8 10 12 14 16 18 Flow Depth (mm)

(a) 1.0 .. ___ _ __ _ _ _ - - ---

0.8 o

0.6 Y / //// Chance Une 2 ls's / / #' /

0.4 -

/

/

o2 i/ ___ __ e8, 7 -. - m 1

I 8 04,9 g, g, g,6 0 1.0 FCP (b)

MF R detection performance results of the mid 1980s a) POD versus IGSCC depth in wrought stainless steel and b) POD versus false calls showing 3 best, 3 worst and median performance 11

l l

MRR DETECTION PERFORMANCE FOR IGSCC l Summary of Individual Near-Side inspector Performance for Both Manual and Advanced Techniques h

Lower Upper Lower Upper 3 Insoector 10 % ET RQ% 20% EQQ RQ% l 1 0.12 0.33 0.61 0.59 0.85 0.97 2 0.05 0.19 0.42 0.08 0.27 0.56 3 0.00 0.00 0.21 0.51 0.77 0.93 4 0.00 0.08 0.32 0.22 0.46 0.71 5 0.00 0.00 0.21 0.51 0.77 0.93 6 0.03 0.15 0.41 0.59 0.85 0.97 7 0.07 0.23 0.49 0.11 0.31 0.57 I 8 0.17 0.38 0.65 0.35 0.62 0.83 9 0.03 0.15 0.41 0.59 0.85 0.97 10 0.17 0.38 0.65 0.43 0.69 0.89 11 0.03 0.14 0.39 0.15 0.36 0.61 12 0.17 0.38 0.65 0.51 0.77 0.93 13 0.03 0.15 0.41 0.51 0.77 0.93 14 0.29 0.54 0.78 0.43 0.69 0.89 15 0.00 0.08 0.32 0.79 1.00 1.00 t

Summary of Individual Far-Side inspector Performance for Both Manual and Advanced Techniques Lower Upper Lower Upper Insoector 20 % ET EQ% EQ% ERR E0%

1 0.00 0.00 0.22 0.00 0.00 0.31 2 0.09 0.25 0.48 0.23 0.57 0.87 3 0.11 0.31 0.57 0.00 0.00 0.31 4 0.00 0.00 0.21 0.01 0.13 0.47 5 0.00 0.00 0.21 0.01 0.13 0.47 6 0.11 0.31 0.57 0.05 0.25 0.60 7 0.29 0.54 0.78 0.40 0.75 0.95

8 0.00 0.08 0.32 0.01 0.13 0.47 9 0.43 0.69 0.89 0.19 0.50 0.81 10 0.17 0.38 0.65 0.19 0.50 0.81 11 0.33 0.57 0.79 0.01 0.17 0.58 12 0.11 0.31 0.57 0.05 0.25 0.60 13 0.00 0.08 0.32 0.01 0.13 0.47

! 14 0.00 0.08 0.32 0.00 0.00 0.31 15 0.00 0.08 0.32 0.00 0.00 0.31 12 '

l

- _ - - _ _ - . .-~_-_ - - __- _ _ - __---__--__--------- -_-----_----- - - --____---__ - --_- -___--_-

O PISC 111 Report No. 33 l ~ h I

1 . . . I O.9 * . _ .

+ ._., __ _

o 0.8 + # ._ _ _ . . _._ _ _._._ __ _

+ +

0.7 ._ __ _ . - _ -

1 0.6 _

i

+  !'

EL o 0.5 + +  ;

_ o IL

+ & __. }, ,

t 0.4 t ,

, 0.3 , .

t i

0.2 _

0.1

+  !

0  ;

0 '

2 4 6 8 10 12 14 16 Flaw Depth (mm)  !

h PI:;C 111 Action 4 international round robin study on flaw detection probatulity (FDP) versus flaw depth in wrought stainless steel conducted in late 19 :Os L

4 t

13  ;

s n .

1 NUREG/CR 5C58 40 35

  • _

E *~ Ideal Performance s

E 25

\-

-t-

i.
  • C
  • zu ,

+ /

s'

  • 15 e e ,s e + 4

'f , ++ ef e + 9 I

F 10 e 1> d $

l p .# og 3

, +

5

  1. . l ,l .f s .

9 0 - #  ! e >

0' 5 10 15 20 25 30 True Depth (mm)

PIRR UT depth measurements on thermal fatigue cracks in clad ferritic piping conducted in the early 1980s 14

x

(

NURE W 908 18 .

r- --

- - _ - - - - - - - _.-- _ - -.- - - - --- - . I

  • l

. /

16 -

1- _ _ -. _ - - - . - - - - - -

/  :

,
  • p 14 l

_ _ _ - _p_ - -

  • ~

/ '

~

i Best Team ~

/ '

g2 l -

j. _~- _ $ _ f __. _ - _ _ - - --

S 1

+ ,

p e .

go 0l+- ,.- ,__-

i

.  !.. .. /

,al ,

. /_ _. . .__ __ _ _ _ _ . __ _ _ . _

l- .- ..

  • 3 . */

Es -

  • I .-
  • / . ' _NIdaal Performance
) + i

+/p+

4  % . + ,,-M g $ _ _ . ._ __. . _ _ _ . . _ . _ _ _ . . _ __. - -.

  • tf .

% /,

  • I - ...- i

+ .,

2 */ .,

A .. ..

, N O f F ~*],, - -

+~- - -

' Worst Team 0 2 4 6 8 10 12 14 16 18 True Depth (mm)

MRR UT depth sizing performance for IGSCC in wrought stainless steel piping conducted in mid-1980s showing best and worst teams 15

.- i t

PlSC lli Report 9o.33 #

PISC IN Action 4 Ases.t>bes 31-34 as _

~ -. ... _ .__ ,,_

L t

t I

E I

/

n e' i

- <e (

E

[

E e' 1

a. em.c. . . . J ,-

t ,** - - - . . . .

f 88 \. . .[

3

! ' '\ .=M'*

a \ Meaf I w e,

.-5' 't '. Perfor.ence i , , ,

' ., gC' " . m i.!

m.

. ,. G .- .-

,. -- - t-

. ,=

l c ,

u

.p- .%

= o .. . .; - i., .. ,

1 v o.* -J * **

P

? '* -*'r . , t i 4. o

- . o .-j-'. o  :: :: "

i

. -;.-. ^

,- .,_ ... ,.], ,p e.g. ; p . .a,_ . .

g. _ . . _ .. . . . ,

- u . ,

, . . . a u o.o u ., ,

. . . - ... 1

=- u o L:.. ..;- t +

  • o u  ::H ti :i we,,,

! *  ;# 2

..g

" * " u o emesa.a

. .; : , u .a e

u -_.

e

, , =

, = = .. .. ,, ,, ,,

j tr.e o., 5. 3 PILC 111 Action 4 UT depth sizing performance for flaws in wrought stainless steel conducted in late 1980s showing best and worst procedures 3

t 16

% ~

PISC 1 EUh371 d

a n..e 2o. cio

  • i.e.

+ Acceptable Selects G Unseceptahee defects (vertical csacksi O set et deoects I

_g'

" /

{ [')

W .

43 o .- . .., ..

,/

/@/ ,._ i sU ' '

c < t O

..- l s ' .e '

.s ,  ; ,.'

a s. > r #

y ,/ / ,

o +

r~ "/ ' ' ,

/ -

-# /<g o _4- o /'

j '

3 i

e + b _ '_i e / -

i

- -- M i f o -- ,.-

0-9 ,/ g A

.- -- +

1 3 10 40 100 200 300 i

az - 2. immi Defect size : dimensione of the M ~ t in the through wall section Thickness of the plates : from 200 mm to 250 mm Pl5 01 detection results for defect detection probability versus defect depth using 1974 ASME Section XI Code type procedures ei sensitwity of  ;

50* > DAC L

17

O O "" -

" "" ' "*O PISC 11 RRT Results for Selected Procedures for Plate No. 3 10 Special

'- n p - Procedures ,

5 - (European) /

c /

3 -

/ Marshall Committee 8 -

,/ /

w .

/

s - /

2 /

/

3m /

/ V o.5 E - / ASME 20 or 10% DAC 3e _

/ (New Proposal)  ;

i E -

I a -

l o

- I X .

5 - ASME 50% DAC j _

(industrial; j _

a. _ l o.o -l 1  ;  ; y l 0 10 20 30 40 so 60 70 t

Defect Through Wall Size (mm) i i

18

,x y (\ ,

t

)  : s f s

'd PISC 11 FINAL R cubT 1 *--  ::  :

09 _ _ . _ . __ _ _ . _ _ _ ___ ._ _ _ . . . - _ . .

08 - -- -- ._ _

07 - __ _

+ <> +

U6 - - . . _

a 05 - . ._ _ . . _ _ _ . _ . _ _ - . _ _ _ . _ _ _ _ . . _ _ _ _ . . _ . _ . _ . _ _ . _ _

04 _ - _ _ _ __.. ._ . _ . _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _

03 ._".._. * ..

02 -- -

01 - _

0 -+,+ e  : :  :: :

( 10 20 30 40 50 60 70 80 90 100 Raw Depth (mm)

PISO 11 Plate 3 performarice for defect detection probability (DDP) versus flaw depth for procedures working at a sensitivity of 50% DAC 19

~s

  • PISC 11 FINAL REPORT 1-=  ;; :: : ;;

0.9

% <> i'

  • 08 *-:e

+

07 *

+ +

06 ==  :

05 ;4 gg 1 "

04 -

4 < >

03._*

eo <> < >. <>

32

  • 01 =

0  ;

O 10 20 30 40 50 60 70 80 90 100 Flaw Depth (rm)

PI C ll Plate 3 per forme si e for defect detection probability versus flaw depth for procedures working at a sensitivity of 20% and 10% DAC 20

$ (

\

)^

1 PISC ll FINAL R RT _

1 = ==0  :: 0  : I 0.9 -

i O.8 > +_ + oo- __

n _ - _ _ _ _ - _ _ _ _ . _ _ _ _ .

0.7 - - . - - _ _ _ _ _ _ . . _ _ _ _ _ . __ ____

++

0.6 --

a.

Q 0.5 -+- - -

0.4 w_ o___ __ _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ - - -- -

0.3 - _ -

0.2 -+ -_ _ _ _ . _ __. -

0.1 . - _ - . _ _ _ - _ _ _ - . . __ _ _ _ _ _ _ _ .. _ . _ _ _ _ _ _ _ _ . -

0 0 10 20 30 40 50 60 70 80 90 100 Flaw Depth (mm)

PISC 11 Plate 3 performance for dal ct detection probability versus flaw depth for special procedures t

D F

t I

21 i

i

( ..

(> PISC 11 FINAL REPORT g .

140 m

120 - _ _ _ _ . . m E

100 , ~ ~ - . .

E s E

~ p >

/

j 80 _..

- ,/

u) 3 - ' =

5%

S '

s s

- l 3 ,/ ,

3 40

  1. [ - sq ideal Normance .

20 m alr1 0- #

a 20 30 40 50 60 70 80 90 100 Real Size (mm)

PISC 111 Action 2 on Full Scale Vessel of teams using speciali ,cocedures for UT flaw sizing 22

o o o -

1

-t PERFORMANCE DEMONSTRATION i

Results of these studies showed that the ASME Code prescriptive UT procedures were not providing adequate reliability.

i

. A novel approach was needed to address improved inspection reliability.

. Performance demonstration would provide the solution to achievmg improvement in NDE reliability.

. PNNL and NRC staff began working in 1981 to develop the basis for NDE system qualification criteria for the NRC to use in the preparation of a regulatory guide. Several documents were developed.

. Two industry meetings were held in 1983 and 1984 to discuss concepts, discuss the documents developed, and obtain input on NDE qualification criteria. j

. Consensus from the second public meeting in 1984 was that ASME Code should develop requirements using the PNNIJNRC document as the basis.

23

1 PERFORMANCE DEMONSTRATION (Cont.)

During the next 5 years, over 100 participants were involved in the  ;

evolution of these requirements.

Key Concepts of ASME Section XI Code Appendices Vil and Vill Prerequisite training and qualification Statistically based performance demonstration tests  !

Personnel / equipment / procedures as a whole are tested and this combination is what passes / fails.

Culminated in a major change in Code philosophy from prescriptive procedures to requiring that teams demonstrate acceptable capability before being pennitted to perform field inspections.

f l

24

O O O PERFORMANCE DEMONSTRATION (Cont.) '!

Performance _ Demonstration Detection Test:

. Blind Test

. Statistically based ~

. Screening test

- Designed such that the probability of passing the test are as follows:

Piping 50% POD and 20% FCP less than a 1% probability of passing.

90% POD and 20% FCP preater than an 85% probability of passing.

Reactor Pressure Vessel i

70% POD and 20% FCP less than a 1% probability of passing.

95% POD and 20% FCP greater than an 85% probability of passing.

Test does not quantify POD for any flaw size.

25

O O O ~i PERFORMANCE DEMONSTRATION (Cont.)  :

i Eerformanc.e__D.emonstration Crack Sizing Test: i i

Test Criteria based on engineering judgement of:  !

Round robin trials >

IGSCC sizing testing in progress at EPRI NDE Center  !;

' t Passing Criteria for Piping Lengfth sizing within 1" Depth sizing 5 0.125" RMSE .

j

. Passing Criteria for RPV l l',

Length sizing 5 0.75" RMSE [

Depth sizmg  :

-- Slope not less than 0.7 i'

-- Mean deviation less than 0.25"

-- Correlatio.n coefficient not less than 0.70 26 l

O O O

~

PERFORMANCE DEMONSTRATION (Cont.) ~!,

Supplements for Performance Demonstration Contain:

9

. Size of specimens

. Minimum number of specimens

. Fabrication conditions t

crown size '

geometric conditions ,

Defect conditions types of flaws location and orientation of flaws

. Detection specimens number of flawed and unflawed grading units

. Sizing specimens number and sizes of flaws

. A cceptance criteria detection test, and sizing test

, 27

TABLE Vlli-S2-1 FROM ASME SEC XI APPENDIX Vill PERFORMANCE DEMONSTRATION DETECTION TEST ACCEPTANCE CRITERIA FOR WROUGHT AUSTENITIC PIPING Detection Test False Call Test l Acceptance Criteria Acceptance Criteria No. of Flawed Minimum No. of Maximum Grading Units Detection Unflawed Number of Criteria Grading Units False Calls 5 5 10 0 I 6 6 12 1 7 6 14 1 8 7 16 2 1

9 7 18 2 g<

l 10 8 20 3 11 9 22 3 12 9 24 3 13 10 26 4 l 14 10 28 5 15 11 30 5 16 12 32 6 i 17 12 34 6 18 13 36 7 19 13 38 7 20 14 40 8 g

1 l 28 -

1 l

Porformanco D3monotration Hictory YEAR 1977 ACTION NRC funds NDE reliability program at Pacific Northwest National Laboratory g

(PNNL).

1981 NRC Research Information Letter (RIL) #113 (based on PNNL research results) made a number of recommendations including performance demonstration (PD) for austenitic and dissimilar metal welds.

, 1982 Recommendations from RIL #113 were incorporated into ASME Code Case -

N-335.

I 1982 NRC program at PNNL began addressing issues of PD criteria 1982-83 IE Bulletins 82-03 (see Reference 3) and 83-02 (see Reference 4) mandated intergranular Stress Corrosion Cracking (IGSCC) detection qualifications on cracked piping. Testing started at Battelle Columbus and then moved to EPRI NDE Center (NDEC) .

1983 - Code Case N-375, " Rules for Ultrasonic Examination of Bolts and l Studs."

l - IGSCC sizing qualifications at NDEC.

I 1983 NRC/PNNL workshop in Seattle, Washington, on Draft #1, " Qualification of

, UT for Nuclear IS! Applications" to discuss and obtain input on methods, criteria and var. bus aspects of PD.  ;

1984 i

1984 Triparty agreement between NRC/EPRl/BWROG on IGSCC certification.

NRC Technical Review Group meeting to achieve consensus and finalize hf .

draft regulatory guide on PD criteria in preparation for public meeting.

, 1984 - NRC public (international) meeting in Rockville, Maryland on the draft PD regulatory guide to obtain input and comment. ASME l

representatives recommended that the ASME should developed PD requirements based on the draft regulatory guide. -

- Section XI authorized three task groups (personnel, PD, and implementation) to develop the necessary qualification requirements and criteria.

1988 - ASME Code Case N-409-2, " Piping UT Performance Demonstration."  !

- ASME Appendix Vil," Qualification of NDE Persoanel for Ultrasonic l Examination,"in Winter 1988 Addenda. 8 1989 ASME Appendix Vill, "Derformance Demonstration for Ultrasonic Examination Systems,"in 19@ Addenda.

1993 1993 Addenda adds Supplemen s 10 and 11 to Appendix Vill covering ,

dissimilar metal welds and clad overlay repairs.

1994-96 Code changes and Cases on Appendix Vill based on ' lessons learned' <

from Performance Demonstration initiative (PDl) Steering Committee activity.

g 29

O O O  :

SUMMARY

AND CONCLUSIONS

. Research results, round robin tests, and experience since the 1970s 'have shown the poor reliability of many prescriptive inservice inspection techniques.

Even as improvements have been made to techniques and procedures, there still is a large variability in the performance of NDE systems for similar procedures and equipment used by different inspectors.

. There is a need to qualify NDE systems, through performance demonstrations, to screen poor performers from the qualified pool of NDE systems that are used for inservice inspections.

. The acceptability of missing deep flaws in a passing detection test should be addressed.

The inclusion of a criterion to the sizing qualification test for the maximum acceptable undersizing of deep flaws, in addition to the RMSE requirement, should be considered.

30 E

l I

REPORTS FROM THE NDE RELIABILITY PROGRAM (B-2289) AT PNNL Hu6ala, F. G., S. R. Doctor. I 996. Piping inspection Round Robin. NUREGICR-50GS, FNNL- i 0475. Pacific Northwest National Laboratory, Richland, Washington.

Vo, T. V., B. W. Smith, F. A. Simonen, B. F. Gore.1994. Feasibility of Developing Risk,-Based Rankings of Pressure Boundary Systems forinservice Inspection. NUREGICR-6151, PNNL-8912. Pacific Northwest Laboratory, Richland, Washington.

Vo. T. V., B. F. Gore, F. A. Simonen, S. R. Doctor.1994. A Pilot Application of Risk Based

Mcthods to Establish Insewicc Inspcction Prioritics for Nucicar Componcnts at Surry Unit l l Nuclear Power Station. NUREG-CR-6181, PNNL-9020, Pacific Northwest Laboratory, Richland, Washington.

Heasier, P. G., T. T. Taylor, S. R. Doctor.1993. Statistically Based Reevaluation of PISC-Il Round Robin Test Data.

NUREGICR-5410, PNNL-8577. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., A. A. Diaz, J. R. Friley, M. S. Greenwood, P. G. Heasier, R. J. Kurtz, F. A. Simonen, J. C. Spanner, T. V. Vo.1993. Nondestructive Exammation (NDE) Reliability forinservice Inspection of Light Water Reactors. NUREGICR 4469, PNNL-571 1, Vol.16. Pacific Northwest laboratory, Richland, Washington.

Doctor, S. R., A. A. Diaz, J. R. Friley, M. S. Good, M. S. Greenwood, P. G. Heasier, R. L. Hockey, R. J. Kurtz, F. A. Simonen, J. C. Spanner, T. T. Taylor, and T. V. Vo.1993. Nondestructive Examination (NDE) Reliability forInsewice Inspection of Light Water Reactors. NUREGICR-4469, PNNL-5711, Vol.15. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., A. A. Diaz, J. R. Friley, M. S. Good, M. S. Greenwood, P. G. Heasier, R. L. Hockey,  ;

R. J. Kurtz, F. A. Simonen, J. C. Spanner, T.'T. Taylor, and T. V. Vo.1992. Nondestructive

{

Examination (NDE) Reliability forInsewice Inspection of Light Water Reactors. NUREGICR-4469, PNNL-5711, Vol.14. Pacific Northwest Laboratory, Richland, Washington, j Green, E. R., S. R. Doctor, R. L. Hockey, and A. A. Diaz.1902. Development of Equipment l Parameter Tolerances for the Ultrasonic Inspection cf Steel Components: Application to l Components up to 3 Inches nick. NUREGICR-5817, Vol 1. Pacific Northwest Laboratory, Richland, Washington.

l Doctor, S. R., M. S. Good, P. G. Heasier, R. L. Hockey, F. A. Simonen, J. C. Spanner, T. T. Taylor, and T. V. Vo.1992. Nondestructive Examination (NDE) Reliability forInservice Inspection of Light Water Reactors. NUREGICR-4469, PNNL-5711, Vol.13. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., M. S. Good, P. G. Heasier, R. L. Hockey, F. A. Simonen, J. C. Spanner, T. T. Taylor, and T. V. Vo.1992. Nondestructive Examination (NDE) Reliability for Insewice inspection of Light Water Reactors. NUREGICR-4469, PNNL-5711, Vol.12. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., M. S. Good, E. R. Green, P. G. Heasier, F. A. Simonen, J. C. Spanner, T. T. Taylor, and T. V. Vo.1991. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. NUREG/CR-4469, PNNL-5711, Vol.11. Pacific Northwest Laboratory,

[ Richland, Washington.

31 ' "

  • i

4 I

REPORTS FROM THE NDE RELIABILITY PROGRAM (B-2289) AT PNNL '

Heasier, P. G., T. T. Taylor, J. C. Spanner, S. R. Doctor, and J. D. Deffenbaugh.1990. Ultrasonic Inspection Reliability forIntergranular Stress Corrosion Cracks: A Round Robin Study of the Effects of Personnel, Procedures, Equipment and Crack Characteristics. NUREGICR-4908.

Pacific Northwest Laboratory, Richland, Washington.

Spanner, J. C., S. R. Doctor, T. T. Taylor /PNNL and ' Muscara/NRC.1990. Qualification  !

Process for Ultrasonic Testing in Nuclear Inservice Inspection Applications. NUREGICR-4882.

PNNL-6179. Pacific Northwest Laboratory, Richland, Washington.

l Doctor, S. R., J. D. Deffenbaugh, M. S. Good, E. R. Green, P. G. Heasier, F. A. Simonen, J. C. I Spanner, T. T. Taylor, and T. V. Vo.1990. Nondestructive Examination (NDE) Reliability for l Inservice Inspection of Light Water Reactors. NUREGICR-4469, PNNL-5711, Vol.10. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., J. D. Deffenbaugh, M. S. Good, E. R. Green, P. G. Heasier, F. A. Simonen, J. C.

Spanner, and T. T. Taylor.1989. Nondestructive Examination (NDE) Reliability forInservicc Inspection of Light Water Reactors. NUREGICR-4469, PNNL-5711, Vo'. 9. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., J. D. Deffenbaugh, M. S. Good, E. K. Green. P. G. Heasier, T. T. Taylor.1989.

Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors.

NUREG/CR-4469, PNNL 5711, Vol. 8. Pacific Northwest Laboratory, Richland, Washington.

J. C. Spanner, and Doctor, S. R., J. D. Deffenbaugh, M. S. Good, E. R. Green, P. G. Heasier, F. A.

Simonen, J C. Spanner, and T. T. Taylor i988. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. NUREGICR 4469, PNNL-5711, Vol. 7. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., J. D. Deffenbaugh, M. S. Good, E. R. Green, P. G. Heasier, G. A. Mart, F. A.

Simonen, J. C. Spanner, T. T. Taylor, and L. G. Van Fleet.1987. Nondestructive Examination (ND:) Reliability forInservice Inspection of Light Water Reactors. NUREGICR-4469, PNNL-5711, Vol. 6. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., D. J. Bates, J. D. Deffenbaugh, M. S. Good, P. G. Heasier, G. A. Mart, F. A.

Simonen, J. C. Spanner, T. T. Taylor, and L. G. Van Fleet.1987. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. NUREG ICR-4469, PNNL-5711, Vol. 5. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., D. J. Bates, J. D. Deffenbaugh, M. S. Good, P. G. Heasler, G. A. Mart, F. A Simonen, J. C. Spanner, A. S. Tabatabal, T. T. Taylor, and L. G. Van Fleet.1987. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. NUREGICR-4469, PNNL-571 1, Vol. 4. Pacific Northwest Laboratory, Richland, Washington.

Collins, H. D. and R. P. Gribble.1986. Siamese Imaging Technique for Quasi-Vertical Type (QVT) Defects in Nuclear Reactor Piping. NUREGICR-4472, PNNL-5717. Pacific Northwest Laboratory, Richland, Washington.

" ~

32

REPORTS FROM THE NDE RELIABILITY PROGRAM (B-2289) AT PNNL pnce ne co oJ.A+e o i mickfnere i a Chriot. J D Deffenbaugh, M. S. Good, p G .

Heasier, G. A. Mart. F. A. Simonen, J. C. Spanner, A. S. Tabatabal, T. T. Taylor, and L. G. Van Fleet.198G. Ncndestructive Examination (NDE) Reliability forInservice Inspection of Light Water Reactors. NUREG/CR-4469, PNNL-5711, Vol. 3. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., D. J. Bates, L. A. Charlot, M. S. Good, H. R. Hartzog, P. G. Heasier, G. A. Mart, F.

A. Simonen, J. C. Spanner, A. S. Tabatabai, and T. T. Taylor.1986. Evaluation and /mprovement of NDE Reliability forInservice Inspection of Light Water Reactors. NUREGICR-4469. PNNL-5711, Vol. 2. Pacific Northwest Laboratory, Richland, Washington.

Doctor, S. R., D. J. Bates, L. A. Charlot, H. D. Collins, M. S. Good, H. R. Hartzog, P. G. Heasier, G. A. Mart, F. A. Simonen, J. C. Spanner, and T. T. Taylor.1986. Integration of Nondestructive Examination (NDE) Reliability and Fracture Mechanics, Semi-Annual Report, April 1984 -

September 1984. NUREG/CR-4469, PNNL-5711, Vol.1. Pacific Northwast Laboratory, Richland, Washington.

Good, M. S. and L. G. Van Fleet.1986. Status of Act.'vities forInspecting Weld Overlaid Pipe Joints. NUREGICR-4484, PN"".-5729. Pacific Northwest Laboratory, Richland, Washington.

j Heasier, P. G., D. J. Bates, T. T. Taylor, and S. R. Doctor.1986. Performance Demonstration

Tests for Detection ofIntergranular Stress Corrosion Cracking. NUREGICR-4464, PNNL-5705, Pacific Northwest Laboratory, Richland, Washington.

Simonen, F. A.1984. The Impact of Nondestructive Examination Unreliability on Pressure Vessel Fracture Predictions. NUREG/CR-3743, PNNL-5062. Pacific Northwest Laboratory, Richland, Washington.

Simonen, F. A. and H. H. Woc.1984. Analyses of the Impact ofInservice Inspection Using Piping Reliability Model. NUREGICR-3869, PNNL-5140. Pacific Nurthwest Laboratory, Richland, Washington.

Taylor, T. T.1984. An Evaluation of Manual Ultrasonic Inspection of Cast Stainless Steel Piping. NUREGICR-3753, PNNL-5070. Pacific Northwest Laboratory, Richland, Washington.

Bush . S. H.,1983, Reliability of Nondestructive Examination, Volumes 1, II, and III. NUREGICR-3110-1, 2, and -3; PNNL-4584. Pacific Northwest Laboratory, Richland, Washington.

Simonen, F. A. and C. W. Goodrich.1983. Parametric Calculations of Fatigue Crack Growth in {

Piping. NUREGICR-3059, PNNL-4537. Pacific Nort'1 west Laboratory, Richland, Washington. I Simonen, F. A., M. E. Mayfield, T. P. Forte, and D. Jones.1983. Crack Growth Evaluation for Small Cracks in Reactor-Coolant Piping. NUREGICR-3176, PNNL-4642. Pacific Northwest Laboratory, Richland, Washington.

l Taylor, T. T., S. L. Crawford, S. R. Doctor, and G. J. Posakony.1983. Detection of Small Sized Near Surface UnJer Clad Cracks for Reactor Pressure Vessels. NUREGICR-2878, PNNL-4373.

Pacific Northwest Laboratory, Richland, Washingten.

33

l l

REPORTS FROM THE NDE RELIABILITY PROGRAM (B 2289) AT PNNL l

2 Rossa L J.. F. L Reckar. R. E. Bowey, S. R. Doctor, R. P. Gribble. and G. J. Posakony 1982.

Characterization Methods for Ultrasonic Test Systems. NUREGICR 2264, PNNL-4215. Pacific \

Northwest Laboratory, Richland, Washington. '

Morris, C. J. and F. L. Becker.1982. State-of Practice Review of Ultrasonic In service Inspection of Class I System Piping in Commercial Nuclear Power Plants. NUREGICR-2468, l PNNL-4026. Pacific Northwest Laboratory, Richland, Washington.

Becker, F. L., 'R. R. Doctor, P. G. Heasier. C. J. Morris, S. G. Pitman, G. P. Selby, and F. A.

Simonen.1981. Integration of NDE Reliability and Fracture Mechanics, Phase I Report. ,

NUREG/CR- 16961, PNNL-3469. Pacific Northwest Laboratory, Richland, Washington. l Taylor, T. T. and G. P. Selby.1981. Evaluation of ASME Section XI Reference Level Sensitivity forInitiation of l'ftrasonic Inspection Examination. NUREGICR-1957, PNNL 3692. Pacific Northwest Laboratory, Richland, Washington.

O l

9 34

'~

O O O

-l NRC STAFF PRESENTATION TO THE. ACRS

SUBJECT:

USE OF ULTRASONIC TESTING IN~ INSERVICE INSPECTION PROGRAMS l l

DATE: APRIL 16,1997 i

PRESENTER: ROBERT HERMANN SENIOR LEVEL ADVISOR MATERIALS & CHEMICAL ENGINEERING BRANCH i DIVISION OF ENGINEERING 415-2768 SUBCOMMITTEE: MATERIALS AND. METALLURGY i

j

O O O -

BACKGROUND e 1970's USNRC observed UT needed improvement to detect and size flaws

- BWR Pipe Cracks '

- BWR Feedwater Nozzle Thermal Fatigue Cracks

- Reactor Vessel Examinations ,

t

e O O O ~

BACKGROUND, CONT'D e Regulatory Actions

- NUREG-0313 and revisions . recommended formal program for UT  ;

examiner performance demonstration

- IGSCC Coordination Plan, NRC, BWROG,~EPRI

- NUREG-0619 Recognized improved UT in lieu of surface exams

- RG 1.159, Rev.1, " UT of Rx Vessels Welds for PSI and ISI" into TSs 3

P h

b t

_ _ _ . _ _ _ _ _ _ _ - - _ _ _ - _ - _ - _ - _ _ - - _ . _ - - _ _ _ _ - - _ _ - - _ _ _ _ _ - _ _ - _ - - - _ - _ - - - - _- N

o o I

~

Q 1 REGULATORY REQUIREMENTS FOR CODES AND STANDARDS

  • Currently, UT examination methods are required to meet minimum 4 mspection standards (amplitude-based)
  • Appendix VIII was incorporated into the 1989 Addenda to ASME Section XI*
  • Current rulemaking will reference ASME Section XI up to and includmg the 1995 Edition i

e Final rulemaking (expected in July 1998) will make Appendix VIII a requirement for all hcensees Performance Demonstration Initiative (PDI) was established to manage implementation of Appendix VIII criteria 4

O O O WHAT IS APPENDIX VIII?  !

e Mandatory appendix in ASME Boiler and Pressure Vessel Code,Section XI(1989 Addenda) .

e Performance demonstration method to qualify ultrasonic examination systems (equipment, procedures, and. personnel) e Tests ability of equipment, procedure, and personnel to detect and size flaws Pass-fail rate using Appendix VIII: -

22% failed to qualify for flaw detection 41% failed to qualify for length sizing 67% failed to qualify for depth measurement i 49% failed to qualify for IGSCC detection e Highly effective method to qualify UT systems i

5

O- O O

~

1 WHY DO WE NEED APPENDIX VIH?

  • Existing requirements might not be adequate to ensure flaws can be reliably detected and sized Browns Ferry Unit 3 RPV Shell Examination 15 flaws required analytical evaluation using Appendix VIII i 2 flaws required analytical evaluation using current Section XI e Improves ability of examiner's disposition to indications Millstone Unit 1 IGSCC detection in piping 35 cracks identified 14 cracks previously identified as geometry or non-metallurgical 6

O O O I

WHY DO WE NEED A GENERIC LETTER?

e To emphasize the importance of Appendi'x VIII -

e Industry and NRC recognize need for Appendix VIII '

1 e Appendix VIII is not expected to become a requirement until July 1998 e GL will show NRC support for Appendix VIII now e To indicate NRC support for PDI initiative e GL will encourage licensees to use Appendix VIII for upcoming augmented vessel examinations 7

O O O PURPOSE OF GENERIC LErrER

  • Notify licensees of UT enhancements and deficiencies in current UT qualifications
  • Determine how the industry plans to ensure that flaws in the reactor vessel and piping are reliably detected and sized  !
  • Determine extent to which licensees are using or plan to use performance demonstration to qualify UT (Appendix VIII to ASME Section XI) 8 .

O-O O

~

t

, REGULATORY BASIS FOR GENERIC LEITER

  • 10 CFR 50.55a(g)(ii) Commission may require augmented inspections if needed for added assurarice of structural integrity

Also program provide for indoctrination and training of personnel ... to assure suitable proficiency is achieved and maintained 9

l O O O l CONCLUSIONS

  • Experience such as PISC, BWR pipe inspections, PDI and Appendix VIII Vessel exams indicate that current inspection requirements may not ensure flaws are reliably detected and sized
  • Significant improvement can be made in volumetric NDE reliability if performance demonstration of procedures, equipment and personnel is

. utilized

  • GL will establish the extent to which Appendix VIII is or is planned to be used for reactor vessel and piping inspections j
  • GL will encourage licensees to use Appendix VIII for reactor vessel and piping examinations
  • GL will demonstrate NRC's support for Appendix VIII until rulemaking is complete .

10