C$

Rgi Power Generation Group

Petry Nuclear Power Plant

' Mail Address:

216-2846915 Law W. Myers 10 corder Road RO. Box 97 FAX: 216-280-8029 Vice President Perry. ONo 44081 Perry. OH 44081 e

P April 14,1997 PY-CEl/NRR-2158L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Gentlemen:

Attached is the March 1997 Monthly Operating Report for Perry Unit 1. Page 1 is the Average Daily Unit Power Level, page 2 is the Operation Data Report, and page 3 is the Unit Shutdowns and Power Reductions Chart. This report is submitted in accordance with Technical Specification 5.6.4.

y If you have questions or require additional information, please contact Mr. llenry L. Hegrat, Manager - Regulatory Affairs at (216) 280-5606.

Very truly yours, I

&O ff

/

HMC:s Attachment

. cc: NRC Region 111 Administrator NRC Project Manager i

NRC Resident inspector w

'9704180163 970331

= ^=" ""S*Ji appupppppp5 j

[

i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-440 UNIT Pernt One DATE 4/14/97 CONTACT H. M. Coon TELEPHONE (216) 280-5434

+

MONTH Merch 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne0 1

1181 17 1191 2

1190 18 1195 3

1193 19 1197 4

1192 20 1195 5

11.92 21 1188 9

6 1194 22 1195 7

1195 23 1197 8

1193 24 1196 s

9 903 25 1188 i

10 11gg 26 1192 11 1192 27 1?!I 12 1194 28 1183 13 11Q5 29 1186 14 1190 30 1187 15 1195 31 1194 16 11QQ page1 i

,. [

. OPERATING DATA REPORT UNIT: Perry One DATE:

4/14/97

' 1.

Docket: 50-440 2.

Reporting Period:J!ard 1997

'3.

Utility

Contact:

H M. Coon 4

Licensed Thermal Power (MWt): 3179 5.

Nameplate Rating (Gross MWe): j.210 6.

Design Electrical Rating (Net MWe):

1191 7.

. Maximum Dependable Capacity (Gross MWe):

12j.2

8..

Maximum Dependable Capacity (Net MWe):jj.QQ 9.

If Changes Occur in Capacity Ratings (item Numbers 4 through 8) Since Last Report, Give Reasons:

- d!B 10.

Power Level to Which Restricted, if any (Net MWe): 100 %

11.

Reasons for Restrictions, if Any:

Operatina License This Month Yr-to-Date Cumulative 12.

Hours in Repo'rting Period 744 0 2.160.0 82.116 0 13.

Hours Reactor was Critical 744 0 2.104 2 59.193.5 14.

Reactor Reserve Shutdown Hours 00 00 0.0 15.

Hours Generator On-Line 744 0 2.068.7 57.207.0 16.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 17.

Gross Thermal Energy (MWtH) 2.640.943 7.247.353 195.290.322 18.

Gross Electrical Energy (MWeH) 922.395 2.515.520 66.967.297 5

19.

Net Electrical Energy (MWeH) 879.695 2.396.038 63.665.639 20.

Unit Service Factor 100.0 %

95 8%

69.7 %

21.

Unit Availability Factor 100.0 %

95.8%

69.7 %

22.

. Unit Capacity Factor (Using MDC Net) 101.9 %

95.6 %

67.0 %

23.

Unit Capacity Factor (Using DER Net) 99 3 %

93.1 %

65.1 %

24.

. Unit Forced Outage Rate 00%

42%

98%

25.-

Forced Outage Hours 0.0 91.3 6.193.0 26.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): Refueling Outage, i

starting September 12,1997 for 37 days.

. 27.

If Shutdown at end of Report Period, Estimated Date Of Startup: N/%

i

}

page 2

]

p

~i

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - MARCH 1997 DOCKET NO. 50-440 UNIT one NAME Perry One DATE 4/14/97 CONTACT H. M. Coon TELEPHONE C216) 280-5434 NO.

DATE TYPE DURATION REASON METHOD LER SYSTEM COMP.

CAUSE & CORRECTIVE ACTION TO PREVENT 1

HOURS 2

3 8

4 5

RECURRENCE 97-03 3/9/97 S

B 5

PLANNED: Rod Sequence Exchange

SUMMARY

Perry Unit One remained on-line the entire month of March,1997
1. TYPE:
2. REASON:
3. METHOD:
4. EXHIBIT G-Instructens F: Forced A-Equiprnent Failure (explain) 1 - Manual for preparation of data S: Scheduled B - Maintenance or Test 2-Manual Scram entry sheets for Licensee C - Refueling 3 - Automatic Scram Event Report (LER) file D - Regulatory Restriction 4 - ContryJed (NUREG 1022)

E - Operating Training &

5-Reduced Load License Examinaton 9 - Other

5. EXHIBIT 1 - Same Source F-Administative G - Operational Error (explain)

H-Other (explain) page 3

- -