ML20137V860

From kanterella
Jump to navigation Jump to search
Forwards Diesel Engine 2A Component Revalidation Insps & Results Per Insp Plan Submitted on 850430.Defective Weld Heads Replaced.Diesel Engine 2B Insp in Progress.Insp Rept Will Not Be Submitted Based on Prior Insps
Date released: 05/30/2020 Download: ML20137V860


Diesel Engine 2A Component Revalidation Insp.
ML20137V914
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 09/25/1985
From:
DUKE POWER CO.
To:
References
Download: ML20137V914 (122)
Forwards Diesel Engine 2A Component Revalidation Insps & Results Per Insp Plan Submitted on 850430.Defective Weld Heads Replaced.Diesel Engine 2B Insp in Progress.Insp Rept Will Not Be Submitted Based on Prior Insps
ML20137V854
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/02/1985
From: Tucker H
DUKE POWER CO.
To: ADENSAM E G, DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML20137V854 (2)