MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20207G3081999-06-0808 June 1999 Discusses Providing NRC Biological Assessment of Impact to Sea Turtles at Plant.Forwards Comments on Draft Biological Opinion Re Impact to Sea Turtles at Plant ML20195F3071999-06-0404 June 1999 Forwards Insp Rept 50-302/99-02 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206N5511999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Sr Peterson Will Be Section Chief for Crystal River Npp.Organization Chart Encl ML20206P5411999-05-0606 May 1999 Forwards Insp Rept 50-302/99-02 on 990228-0410.No Violations Noted.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206G1971999-05-0404 May 1999 Forwards Summary of 990412 & 14 Telcon with FPC Representatives Re NRC Questions Concerning Util 980729 & 1120 Ltrs Requesting Approval to Adopt NEI 97-03 Draft Final Rev 3, Methodology for Development of Eal ML20206K4461999-04-27027 April 1999 Forwards Notice of Withdrawal in Response to Util 990412 Request for Withdrawal of Application & Suppl by for Amend Re Normal Standby Position of Dh Removal Sys Valves DHV-34 & DHV-35 ML20206B9141999-04-20020 April 1999 Refers to Open Mgt Meeting Conducted at Licensee Request in Atlanta,Ga on 990414 Re Recent Crystal River 3 Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20205S4741999-04-20020 April 1999 Informs That NRC Determined FTI Topical Rept BAW-2342P,Rev 0,entitled OTSG Repair Roll Qualification Rept,Addendum a, Marked as Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20205T3241999-04-0909 April 1999 Informs That on 990402,K Mccall & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Plant for Y2K Initial Exam Dates Are Wks of 000828 & 0911 for Approx Nine Candidates ML20205K6001999-04-0808 April 1999 Forwards Draft Biological Opinion from National Marine Fisheries Service Re Impact on Endangered Sea Turtles of Operation of Crystal River Energy Complex for Review & Comment ML20205K6111999-04-0202 April 1999 Forwards Request for Addl Info Re Util 980416 & Revised 981130 Submittals of Third 10-year Inservice Insp Program for Crystal River Unit 3 ML20205Q4871999-03-29029 March 1999 Forwards Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted ML20205D5101999-03-26026 March 1999 Discusses FPC 961008 & 970228 Responses to NRC RAI Re Postulated Failure of RCP Seal Area Heat Exchanger Which Could Cause Overpressurization of Nuclear Svcs Closed Cycle Cooling Sys.Determined That in-depth Study Not Needed ML20205D3391999-03-22022 March 1999 Advises of NRC Planned Insp Effort Resulting from Plant PPR Completed on 990203,to Develop Integrated Understanding of Safety Performance.Historical Listing of Plant Issues & Details of Insp Plan for Next Eight Months Encl ML20204J5601999-03-22022 March 1999 Confirms 990309 Telcon Between R Mclaughlin of Licensee Staff & Ninh of NRC Re Mgt Meeting to Be Held at Licensee Request & Scheduled for 990313 in Atlanta,Ga to Discuss Recent Crystal River 3 Performance ML20207L3501999-03-0404 March 1999 Forwards Request for Addl Info Re 980730 License Amend Request 222 on Control Room Emergency Ventilation Sys IR 05000302/19982011999-02-16016 February 1999 Forwards Operational Safeguards Insp Rept 50-302/98-201 on 980504-06.No Violations Noted.Briefings,Observations,Drills & Exercises Indicated That Modified Protection Strategy Generally Sound.Without Encl ML20203G4891999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203A4301999-02-0303 February 1999 Forwards SE Re 3 EAL Changes.Nrc Has Concluded That Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 & Therefore Acceptable ML20206S4191999-01-26026 January 1999 Forwards FEMA Final Exercise Rept for 981014,emergency Response Exercise.No Deficiencies or Areas Requiring Corrective Action Were Identified During Exercise ML20199J8701999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Copy of Organization Charts Encl for Info ML20199F4971999-01-11011 January 1999 Confirms FPC Informing That Request for USNRC Review of Topical Rept Boron Dilution by RCS Hot Leg Injection Submitted on 970227 Was Being Withdrawn.Informs That All Remaining Review Effort for Request,Canceled ML20199E3441999-01-11011 January 1999 Confirms Licensee Informing NRC That Request for Exemption from Requirements of 10CFR70.24(a) for Crystal River Unit 3,submitted by Util by Ltr Being Withdrawn ML20199D6071999-01-0404 January 1999 Forwards Insp Rept 50-302/98-10 on 981025-1205 & Notice of Violation.Nrc Concluded That Info Re Reason for Violation, C/A Taken & Plan to Correct Violation & Prevent Recurrence Already Adequately Addressed ML20199E3991998-12-23023 December 1998 Discusses Training Managers Conference Conducted at RB Russell Bldg on 981105.Agenda Used for Conference,List of Attendees,Slide Presentation & Preliminary Schedule for FY99 & FY00 Encl ML20198N9051998-12-16016 December 1998 Forwards Insp Rept 50-302/98-13 on 981116-20.No Violations Noted.Insp Consisted of Selective Exams of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20196H2511998-12-0101 December 1998 Forwards Insp Rept 50-302/98-12 on 981013-16.No Violations Noted.Insp Team Observed Selected Portions of Emergency Organizations Response in Key Facilities During EP Plume Exposure Exercise ML20196C2931998-11-24024 November 1998 Forwards Notice of Withdrawal of 971031 Application for Amend to License ML20196A5321998-11-23023 November 1998 Ack Receipt of That Informed of Clarifications Needed Re Time Necessary to Start Control Complex Chillers at Plant,After Loss of Offsite Power.Changes to Start Times Do Not Alter Conclusion in SE Supporting Amend 163 to TSs ML20196C6291998-11-20020 November 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting Held on 981102.Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix, Encl ML20195G4461998-11-17017 November 1998 Discusses FPC 980518 Submittal of Operational Assessment of Once Through SG Tube Degradation at CR-3 in Accordance with License Commitment Submitted on 971207 1999-09-03
[Table view] |
Text
'
April 3, 1997 Florida Power Corporation Crystal River Energy Complex Mr. Roy A. Anderson (SA2C)
Senior Vice President. Nuclear Operations ATTN: Mgr.. Nuclear Licensing 15760 West Power Line Street Crystal River. FL 34428-6708
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - CRYSTAL RIVER 3
Dear Mr. Anderson:
On March 11, 1997 the regional staff completed the semiannual Plant Performance Review (PPR) of Crystal River 3. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Crystal River 3 involved the participation of all technical divisions in l
evaluating inspection results and safety performance information for the period September 1996 through February 1997. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
1 On October 4.1996. you notified the NRC that you would remain shut down for
- an extended period of time in order to make modifications to several safety ;
systems in order to obtain additional safety margin for accident conditions.
A Confirmatory Action Letter was issued on March 4.1997, requiring NRC concurrence for the restart of Crystal River 3 prior to entering Mode 2. The Enclosure provides our plan to assess the adequacy of your corrective actions i for the issues on our restart list (issued separately as Restart Panel Meeting l Minutes) and your readiness for restart.
This letter advises you of our planned inspection effort resulting from the Crystal River 3 PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to ,
be resolved in advance of inspector arrival onsite. The enclosure details our ins)ection plan for the remainder of the year. The rationale or basis for l eac1 inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas. Resident l Inspector planned inspection dates are not listed due to their ongoing and continuous nature. ,
i During each NRC inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments. Applicable portion (s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, proceduresand/or parameters. The goal is to determine the accuracy of the UFSAR regarding existing plant practices and )i
, conditions by providing specific attention to the UFSAR when performing /
9704170253 95 403 PDR ADOCK 050003o2 0FFICIAL COPY gippupppppg Mo/
FPC 2 various reactor inspections. Inspectors will not be judging the overall completeness of the UFSAR: rather. the inspections will focus on identifying differences between the UFSAR description and the plant.
We will inferm you of any changes to the inspection plan. If you have any questions, please contact Kerry Landis at 404-331-5509.
Sincerely.
Orig signed by Kerry D. Landis Kerry D. Landis. Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No. 50-302 License No. DPR-72
Enclosure:
Inspection Plan cc w/ encl:
l John P. Cowan. Vice President Nuclear Production (SA2C)
Florida Power Corporation Crystal River Energy Complex 15760 West Power Line Street Crystal River. FL 34428-6708 ;
l B. J. Hickle. Director i Nuclear Plant Operations (NA2C)
Florida Power Corporation l Crystal River Energy Complex
! 15760 West Power Line Street l Crystal River. FL 34428-6708 David F. Kunsemiller. Director (SA2A)
Nuclear Operations Site Support Florida Power Corporation Crystal River Energy Complex 15760 West Power Line Street Crystal River. FL 34428-6708 -
l l
R. Alexander Glenn. Corporate Counsel FPC MAC - ASA P. O. Box 14042 St. Petersburg, FL 33733-4042 I cc w/ enc 1: See page 3 i
e FPC 3 .
cc w/ encl: Continued Attorney General !
Department of Legal Affairs The Capitol I Tallahassee, FL 32304-Bill Passetti l Office of Radiation Control !
De)artment of Health and lehabilitative Services 1317 Winewood Boulevard Tallahassee FL 32399-0700 Joe Myers. Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee. FL 32399-2100 Chairman Board of County Commissioners Citrus County i 110 N. Apopka Avenue l Inverness. FL 34450-4245 I Robert B. Borsum Framatome Technologies i 1700 Rockville Pike. Suite 525 !
Rockville MD 20852-16b1 i Distribution w/ enc 1:
G. Ho)per RII l B. Sclin. RII l PUBLIC NRC Resident Inspector i U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River. FL 34428 ;
A _
SEND TO PURtit 00CtJMENT ROOM? I VES l NO OFFICE \ /) n . , O
. i N.
MME . ellen lHChrstencen 8 Holland \fredrC KB r Pe les ,
DATE 04 / } / 97 QL/_ $ / 97 04_/ ) / 97 04 / h / 97 04 / ) / 97 04/hf/97 COPY? YES NO /[ YES l NO [YES) NO YES NO D NO YES- l /Nk UtiILIAL Rt. LORD COPY MUMt.NI NAM:. E \PPR-LTR.497 g b
. i CRYSTAL RIVER INSPECTION PLAN April 3. 1997 '
INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS LNSPECTION TEMPORARY DATES ;
INSTRUCTION j OPERATIONS IP 71707 PLANT OPERATIONS 3 MONTHLY CORE INSPECTION PROGRAM - RESIDENT INSPECTORS IP 92901 FOLLOWUP - OPERATIONS 3 MONTHLY REGIONAL INITIATIVE INSPECTION OF THE RESTART ISSUES - RESIDENT IP 92720 CORRECTIVE ACTIONS INSPECTORS IP 42001 EMERGENCY OPERATING PROCEDURES 1 06/02/97 INSPECT SIGNIFICANT E0P REVISIONS ,
DUE TO SAFETY SYSTEM MODIFICATIONS 3 12/01/97 DURING EXTENDED SHUTDOWN !
OPERATOR - INITIAL EXAM 3 06/02/97 LICENSEE REQUESTED INITIAL EXAMS ;
FOR 4 SRO UPGRADES AND TWO R0s !
3 06/16/97 IP 71001 LICENSED OPERATOR 1 11/10/97 CORE INSPECTION PROGRAM REQUALIFICATION PROGRAM EVALUATION IP 93806 OPERATIONAL READINESS 6 12/08/97 EVALUATE READINESS FOR RESTART ASSESSMENT TEAM INSPECTION FOLLOWING EXTENDED SHUTDOWN (ORAT) '
IP 71715 SUSTAINED CONTROL ROOM AND 6 TBD 24 HOUR SUSTAINED CONTROL ROOM PLANT OBSERVATION OBSERVATION OF UNIT RESTART FOLLOWING EXTENDED SHUTDOWN fncinenro
2 -
INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS INSPECTION TEMPORARY DATES INSTRUCTION MAINTENANCE IP 61726 SURVEILLANCE OBSERVATIONS 1 BIMONTHLY CORE INSPECTION PROGRAM - RESIDENT MAINTENANCE OBSERVATIONS INSPECTORS IP 62703 MONTHLY IP 62700 MAINTENANCE PROGRAM 1 05/19/97 REACTOR BUILDING COATINGS IMPLEMENTATION INSPECTION IP 73753 INSERVICE INSPECTION CORE INSPECTION PROGRAM IP 62700 MAINTENANCE PROGRAM 1 06/16/97 MAINTENANCE PROCEDURES. PM IMPLEMENTATION BACKLOG. MT&E, AND ENGINEERING INTERFACE ENGINEERING IP 37550 ENGINEERING 2 03/31/97 CORE AND REGIONAL INITIATIVE 2 04/14/97 INSPECTIONS WITH FOCUS ON QUALITY IP 37551 ONSITE ENGINEERING 2 06/02/97 0F ENGINEERING CORRECTIVE ACTIONS.
2 06/16/97 LERS. OPERABILITY. REPORTABILITY IP 40500 EFFECTIVENESS OF LICENSEE 2 07/14/97 50.59 EVALUATIONS. ENGINEERING CONTROLS IN IDENTIFYING. 2 08/25/97 SUPPORT TO OPERATIONS AND RESOLVING. AND PREVENTING 2 09/29/97 MAINTENANCE. SELF ASSESSMENT.
PROBLEMS DESIGN CONTROL. AND RELATED OTHER WEEKS RESTART ISSUES IP 92903 FOLLOWUP - ENGINEERING AS REQUIRED IP 40500 EFFECTIVENESS OF LICENSEE 4 05/05/97 MANAGEMENT OVERSIGHT OF THE CONTROLS IN IDENTIFYING. PROBLEM IDENTIFICATION AND RESOLVING. AND PREVENTING RESOLUTION PROCESS. ROOT CAUSE PROBLEMS EVALUATIONS. AND RELATED RESTART ISSUES t
cori nc. .rn
3 i
INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS INSPECTION TEMPORARY DATES ,
INSTRUCTION i IP 37001 10 CFR 50.59 SAFETY EVALUATION 3 07/07/97 MANAGEMENT OVERSIGHT OF 50.59 PROGRAM EVALUATIONS. REPORTABILITY.
OPERABILITY EVALUATIONS. AND IP 40500 EFFECTIVENESS OF LICENSEE RELATED RESTART ISSUES CONTROLS IN IDENTIFYING.
RESOLVING. AND PREVENTING PROBLEMS IP 37700 DESIGN CHANGES AND 4 07/28/97 MANAGEMENT OVERSIGHT OF THE DESIGN MODIFICATIONS : CONTROL PROCESS AND RELATED
): RESTART ISSUES IP 37702 DESIGN CHANGES AND MODIFICATIONS PROGRAM IP 40500 EFFECTIVENESS OF LICENSEE 4 08/11/97 EVALUATE CORRECTIVE ACTION PROCESS CONTROLS IN IDENTIFYING.
RESOLVING. AND PREVENTING PROBLEMS 5
IP 92720 CORRECTIVE ACTIONS IP 92702 FOLLOWUP ON CORRECTIVE ACTIONS 1 TBD EVALUATE IMPLEMENTATION OF THE FOR VIOLATIONS AND DEVIATIONS SETPOINT PROGRAM IP 40500 EFFECTIVENESS OF LICENSEE 4 09/15/97 MCAP EVALUATION CONTROLS IN IDENTIFYING.
RESOLVING. AND PREVENTING PROBLEMS IP 92720 CORRECTIVE ACTIONS IP 93801 SAFETY SYSTEM FUNCTIONAL 1 09/08/97 TWO SAFETY SYSTEMS SELECTED DUE TO INSPECTION (SSFI) 5 09/22/97 EXTENSIVE DESIGN BASIS REVIEW AND 5 10/06/97 SYSTEM MODIFICATIONS IP 40500 EFFECTIVENESS OF LICENSEE 3 10/97 MANAGEMENT OVERSIGHT OF FSAR SELF
, CONTROLS IN IDENTIFYING. ASSESSMENT. RESOLUTION PROCESS.
RESOLVING. AND PREVENTING AND RELATED RESTART ISSUES PROBLEMS cm-i ne. .rn
4 -
~.
INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS INSPECTION TEMPORARY DATES INSTRUCTION PLANT SUPPORT ,
IP 71750 PLANT SUPPORT ACTIVITIES 3 MONTHLY CORE INSPECTION PROGRAM - RESIDENT INSPECTORS IP 64704 FIRE PROTECTION PROGRAM 1 08/04/97 APPENDIX R - FIRE PROTECTION i SYSTEM. AND MECATISS INSTALLATION IP 81700 PHYSICAL SECURITY PROGRAM FOR 1 03/17/97 SAFEGUARDS - CORE AND REGIONAL POWER REACTORS INITIATIVE INSPECTION OF SECURITY 4 08/04/97 MANAGEMENT OVERSIGHT OF SECURITY SYSTEM UPGRADE AND SECURITY PLAN 2 09/22/97 REVISION IP 84750 RADIOACTIVE WASTE TREATMENT. 1 06/16/97 CORE INSPECTION PROGRAM AND EFFLUENT AND ENVIRONMENTAL MONITORING 1 06/23/97 SOLID RADI0 ACTIVE WASTE IP 86750 MANAGEMENT AND TRANSPORTATION OF RADI0 ACTIVE MATERIALS IMPLEMENTATION OF REVISED 49 CFR PARTS 100-179 AND 10 CFR i TI 2515/133 PART 71 IP 83750 OCCUPATIONAL RADIATION EXPOSURE 1 07/14/97 CORE INSPECTION PROGRAM 08/25/97 IP 82701 OPERATIONAL STATUS OF THE 1 09/15/97 CORE INSPECTION PROGRAM EMERGENCY PREPAREDNESS (EP)
PROGRAM IP 64704 FIRE PROTECTION PROGRAM 1 10/06/97 CORE INSPECTION PROGRAM c- 1----.
_ _