Discusses Regional Staff Completion of Semiannual PPR of Plant on 970311.Review Provides Regional Mgt W/Current Summary of Licensee Performance & Serve as Inputs to NRC SALP & SMM Reviews
ML20137V275
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/03/1997
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard Anderson
FLORIDA POWER CORP.
References
NUDOCS 9704170253
Download: ML20137V275 (7)


Text

'

April 3, 1997 Florida Power Corporation Crystal River Energy Complex Mr. Roy A. Anderson (SA2C)

Senior Vice President. Nuclear Operations ATTN: Mgr.. Nuclear Licensing 15760 West Power Line Street Crystal River. FL 34428-6708

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - CRYSTAL RIVER 3

Dear Mr. Anderson:

On March 11, 1997 the regional staff completed the semiannual Plant Performance Review (PPR) of Crystal River 3. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Crystal River 3 involved the participation of all technical divisions in l

evaluating inspection results and safety performance information for the period September 1996 through February 1997. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

1 On October 4.1996. you notified the NRC that you would remain shut down for

an extended period of time in order to make modifications to several safety  ;

systems in order to obtain additional safety margin for accident conditions.

A Confirmatory Action Letter was issued on March 4.1997, requiring NRC concurrence for the restart of Crystal River 3 prior to entering Mode 2. The Enclosure provides our plan to assess the adequacy of your corrective actions i for the issues on our restart list (issued separately as Restart Panel Meeting l Minutes) and your readiness for restart.

This letter advises you of our planned inspection effort resulting from the Crystal River 3 PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to ,

be resolved in advance of inspector arrival onsite. The enclosure details our ins)ection plan for the remainder of the year. The rationale or basis for l eac1 inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas. Resident l Inspector planned inspection dates are not listed due to their ongoing and continuous nature. ,

i During each NRC inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments. Applicable portion (s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, proceduresand/or parameters. The goal is to determine the accuracy of the UFSAR regarding existing plant practices and )i

, conditions by providing specific attention to the UFSAR when performing /

9704170253 95 403 PDR ADOCK 050003o2 0FFICIAL COPY gippupppppg Mo/

FPC 2 various reactor inspections. Inspectors will not be judging the overall completeness of the UFSAR: rather. the inspections will focus on identifying differences between the UFSAR description and the plant.

We will inferm you of any changes to the inspection plan. If you have any questions, please contact Kerry Landis at 404-331-5509.

Sincerely.

Orig signed by Kerry D. Landis Kerry D. Landis. Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No. 50-302 License No. DPR-72

Enclosure:

Inspection Plan cc w/ encl:

l John P. Cowan. Vice President Nuclear Production (SA2C)

Florida Power Corporation Crystal River Energy Complex 15760 West Power Line Street Crystal River. FL 34428-6708  ;

l B. J. Hickle. Director i Nuclear Plant Operations (NA2C)

Florida Power Corporation l Crystal River Energy Complex

! 15760 West Power Line Street l Crystal River. FL 34428-6708 David F. Kunsemiller. Director (SA2A)

Nuclear Operations Site Support Florida Power Corporation Crystal River Energy Complex 15760 West Power Line Street Crystal River. FL 34428-6708 -

l l

R. Alexander Glenn. Corporate Counsel FPC MAC - ASA P. O. Box 14042 St. Petersburg, FL 33733-4042 I cc w/ enc 1: See page 3 i

e FPC 3 .

cc w/ encl: Continued Attorney General  !

Department of Legal Affairs The Capitol I Tallahassee, FL 32304-Bill Passetti l Office of Radiation Control  !

De)artment of Health and lehabilitative Services 1317 Winewood Boulevard Tallahassee FL 32399-0700 Joe Myers. Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee. FL 32399-2100 Chairman Board of County Commissioners Citrus County i 110 N. Apopka Avenue l Inverness. FL 34450-4245 I Robert B. Borsum Framatome Technologies i 1700 Rockville Pike. Suite 525  !

Rockville MD 20852-16b1 i Distribution w/ enc 1:

G. Ho)per RII l B. Sclin. RII l PUBLIC NRC Resident Inspector i U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River. FL 34428  ;

A _

SEND TO PURtit 00CtJMENT ROOM? I VES l NO OFFICE \ /) n . , O

. i N.

MME . ellen lHChrstencen 8 Holland \fredrC KB r Pe les ,

DATE 04 / } / 97 QL/_ $ / 97 04_/ ) / 97 04 / h / 97 04 / ) / 97 04/hf/97 COPY? YES NO /[ YES l NO [YES) NO YES NO D NO YES- l /Nk UtiILIAL Rt. LORD COPY MUMt.NI NAM:. E \PPR-LTR.497 g b

. i CRYSTAL RIVER INSPECTION PLAN April 3. 1997 '

INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS LNSPECTION TEMPORARY DATES  ;

INSTRUCTION j OPERATIONS IP 71707 PLANT OPERATIONS 3 MONTHLY CORE INSPECTION PROGRAM - RESIDENT INSPECTORS IP 92901 FOLLOWUP - OPERATIONS 3 MONTHLY REGIONAL INITIATIVE INSPECTION OF THE RESTART ISSUES - RESIDENT IP 92720 CORRECTIVE ACTIONS INSPECTORS IP 42001 EMERGENCY OPERATING PROCEDURES 1 06/02/97 INSPECT SIGNIFICANT E0P REVISIONS ,

DUE TO SAFETY SYSTEM MODIFICATIONS 3 12/01/97 DURING EXTENDED SHUTDOWN  !

OPERATOR - INITIAL EXAM 3 06/02/97 LICENSEE REQUESTED INITIAL EXAMS  ;

FOR 4 SRO UPGRADES AND TWO R0s  !

3 06/16/97 IP 71001 LICENSED OPERATOR 1 11/10/97 CORE INSPECTION PROGRAM REQUALIFICATION PROGRAM EVALUATION IP 93806 OPERATIONAL READINESS 6 12/08/97 EVALUATE READINESS FOR RESTART ASSESSMENT TEAM INSPECTION FOLLOWING EXTENDED SHUTDOWN (ORAT) '

IP 71715 SUSTAINED CONTROL ROOM AND 6 TBD 24 HOUR SUSTAINED CONTROL ROOM PLANT OBSERVATION OBSERVATION OF UNIT RESTART FOLLOWING EXTENDED SHUTDOWN fncinenro

2 -

INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS INSPECTION TEMPORARY DATES INSTRUCTION MAINTENANCE IP 61726 SURVEILLANCE OBSERVATIONS 1 BIMONTHLY CORE INSPECTION PROGRAM - RESIDENT MAINTENANCE OBSERVATIONS INSPECTORS IP 62703 MONTHLY IP 62700 MAINTENANCE PROGRAM 1 05/19/97 REACTOR BUILDING COATINGS IMPLEMENTATION INSPECTION IP 73753 INSERVICE INSPECTION CORE INSPECTION PROGRAM IP 62700 MAINTENANCE PROGRAM 1 06/16/97 MAINTENANCE PROCEDURES. PM IMPLEMENTATION BACKLOG. MT&E, AND ENGINEERING INTERFACE ENGINEERING IP 37550 ENGINEERING 2 03/31/97 CORE AND REGIONAL INITIATIVE 2 04/14/97 INSPECTIONS WITH FOCUS ON QUALITY IP 37551 ONSITE ENGINEERING 2 06/02/97 0F ENGINEERING CORRECTIVE ACTIONS.

2 06/16/97 LERS. OPERABILITY. REPORTABILITY IP 40500 EFFECTIVENESS OF LICENSEE 2 07/14/97 50.59 EVALUATIONS. ENGINEERING CONTROLS IN IDENTIFYING. 2 08/25/97 SUPPORT TO OPERATIONS AND RESOLVING. AND PREVENTING 2 09/29/97 MAINTENANCE. SELF ASSESSMENT.

PROBLEMS DESIGN CONTROL. AND RELATED OTHER WEEKS RESTART ISSUES IP 92903 FOLLOWUP - ENGINEERING AS REQUIRED IP 40500 EFFECTIVENESS OF LICENSEE 4 05/05/97 MANAGEMENT OVERSIGHT OF THE CONTROLS IN IDENTIFYING. PROBLEM IDENTIFICATION AND RESOLVING. AND PREVENTING RESOLUTION PROCESS. ROOT CAUSE PROBLEMS EVALUATIONS. AND RELATED RESTART ISSUES t

cori nc. .rn

3 i

INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS INSPECTION TEMPORARY DATES ,

INSTRUCTION i IP 37001 10 CFR 50.59 SAFETY EVALUATION 3 07/07/97 MANAGEMENT OVERSIGHT OF 50.59 PROGRAM EVALUATIONS. REPORTABILITY.

OPERABILITY EVALUATIONS. AND IP 40500 EFFECTIVENESS OF LICENSEE RELATED RESTART ISSUES CONTROLS IN IDENTIFYING.

RESOLVING. AND PREVENTING PROBLEMS IP 37700 DESIGN CHANGES AND 4 07/28/97 MANAGEMENT OVERSIGHT OF THE DESIGN MODIFICATIONS  : CONTROL PROCESS AND RELATED

): RESTART ISSUES IP 37702 DESIGN CHANGES AND MODIFICATIONS PROGRAM IP 40500 EFFECTIVENESS OF LICENSEE 4 08/11/97 EVALUATE CORRECTIVE ACTION PROCESS CONTROLS IN IDENTIFYING.

RESOLVING. AND PREVENTING PROBLEMS 5

IP 92720 CORRECTIVE ACTIONS IP 92702 FOLLOWUP ON CORRECTIVE ACTIONS 1 TBD EVALUATE IMPLEMENTATION OF THE FOR VIOLATIONS AND DEVIATIONS SETPOINT PROGRAM IP 40500 EFFECTIVENESS OF LICENSEE 4 09/15/97 MCAP EVALUATION CONTROLS IN IDENTIFYING.

RESOLVING. AND PREVENTING PROBLEMS IP 92720 CORRECTIVE ACTIONS IP 93801 SAFETY SYSTEM FUNCTIONAL 1 09/08/97 TWO SAFETY SYSTEMS SELECTED DUE TO INSPECTION (SSFI) 5 09/22/97 EXTENSIVE DESIGN BASIS REVIEW AND 5 10/06/97 SYSTEM MODIFICATIONS IP 40500 EFFECTIVENESS OF LICENSEE 3 10/97 MANAGEMENT OVERSIGHT OF FSAR SELF

, CONTROLS IN IDENTIFYING. ASSESSMENT. RESOLUTION PROCESS.

RESOLVING. AND PREVENTING AND RELATED RESTART ISSUES PROBLEMS cm-i ne. .rn

4 -

~.

INSPECTION NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS PROCEDURE / TITLE / PROGRAM AREA INSPECTORS INSPECTION TEMPORARY DATES INSTRUCTION PLANT SUPPORT ,

IP 71750 PLANT SUPPORT ACTIVITIES 3 MONTHLY CORE INSPECTION PROGRAM - RESIDENT INSPECTORS IP 64704 FIRE PROTECTION PROGRAM 1 08/04/97 APPENDIX R - FIRE PROTECTION i SYSTEM. AND MECATISS INSTALLATION IP 81700 PHYSICAL SECURITY PROGRAM FOR 1 03/17/97 SAFEGUARDS - CORE AND REGIONAL POWER REACTORS INITIATIVE INSPECTION OF SECURITY 4 08/04/97 MANAGEMENT OVERSIGHT OF SECURITY SYSTEM UPGRADE AND SECURITY PLAN 2 09/22/97 REVISION IP 84750 RADIOACTIVE WASTE TREATMENT. 1 06/16/97 CORE INSPECTION PROGRAM AND EFFLUENT AND ENVIRONMENTAL MONITORING 1 06/23/97 SOLID RADI0 ACTIVE WASTE IP 86750 MANAGEMENT AND TRANSPORTATION OF RADI0 ACTIVE MATERIALS IMPLEMENTATION OF REVISED 49 CFR PARTS 100-179 AND 10 CFR i TI 2515/133 PART 71 IP 83750 OCCUPATIONAL RADIATION EXPOSURE 1 07/14/97 CORE INSPECTION PROGRAM 08/25/97 IP 82701 OPERATIONAL STATUS OF THE 1 09/15/97 CORE INSPECTION PROGRAM EMERGENCY PREPAREDNESS (EP)

PROGRAM IP 64704 FIRE PROTECTION PROGRAM 1 10/06/97 CORE INSPECTION PROGRAM c- 1----.

_ _