_ _ _ _ _ _
DOCKET N0.
50-397 UllT IW1E WNP-2 DATE 12-2-85 LNIT SIUIDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REf1 TIT PERIOD NOV 19 85 TELEPil0NE (509)377-2486
- month, yHr D' ATE TITE LOURS HEASON METHOD LER nut 0ER SYS101 CO.tPUNENT CAUSE & CORRECTIVE ACTION TO HIEVENT RECUfWlENCE A
NO.- -
85-02P 7/1/85 F 0
A 5
CB PUMPXX POWER OUTPUT LIMITED TO 73% DUE T0'IN0PERABILITY OF "B" RRC PUMP 85-17 11/13/85 F 112.37 A 3
later EG INSTRU-P TURBINE TRIP AND REACTOR SCRAM AT 51% POWER.
RPV HIGH WATER LEVEL WHICH RESULTED IN THE TURBINE TRIP WAS CAUSED BY FAILURE OF AN INVERTER WHICH CAUSED A TRANSIENT OF THE INSTRUMENT POWER SUPPLY AND BLEW A FUSE IN THE FEEDWATER CONTROL CIRCUITRY. THE INVERTER WAS REPAIRED AND A DESIGN CHANGE INITIATED TO REVISE THE POWER SUPPLY CIRCUITRY FOR THE FEEDWATER CONTROL SYSTEll.
j.
l 8602180535 e51130
^
l Sul(ARY l R
DR TYPE RF_ASON METil0D SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Schcx1 D-Maint or Test G-Oper Error 24tanual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of H
D-Regulatory Restriction 4-Continued Data Entry Sheet
- _ {
E-Operator Training 5-ReciJced Load Licensee Event Report A License Examination 9-Other (LER) File (NUREG-0161)
bPERATING DATA REPORT ~
WNP-2 02-Dec-85 i
DOCKET: 50-397
.~
REPORTING PERIOD:
Nov-85 OUTAGE +0N-LINE HOURS 720 UTILITY CONTACT:
LEONARD HUTCHISON (509) 377-2486 3323
.~ LICENSED THERMAL POWER (MWt):
1200.1 NAMEPLATE RATING (GROSS MWe):
1100 DESIGN ELECTRICAL RATING (NET MWe):
1140 MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1095 IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
O. POWER TO WHICH RESTRICTED, IF ANY (NET MWe) 8.90.)fWe E I
- 1. REASONS FOR RESTRICTIONS, IF ANY:. "B"._RRg,P, UMP It[0PERABLE_ _ _ _ _ _ _ _ _ _
MONTH
' YEAR CUMULATIVE
'2.
REPORT PERIOD HOURS 720 80'16 8.456.2
- 3. HOURS REACTOR CRITICAL-619.6 6155.6 6572.1
- 4. RX RESERVE SHTDWN HRS 0.0 0.0 0.0 5.-HRS GENERATOR ON LINE 607.6 5097.6 6296.1 0.0
- 6. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 3
- 7. GROSS THERMAL ENERGY (MWH) 1406640 14639527 15053155
- 0.. GROSS ELECTRICAL ENERGY (MWH) 461080 4839230 5266160
- 9. NET ELECTRICAL ENERGY (MWH) 443543 4640078 5050464 O. UNIT SERVICE FACTOR 84.4%
- 73. 6Y.
74.5%
- 1. UNIT AVAILABILITY FACTOR G4.4%
73.6%
,74.5%
- 2. UNIT CAPACITY FACTOR (MDC NET) 56.3%
52.9%
$4.5%
- 3. UNIT. CAPACITY FACTOR (DER NET) 56.0%
52.6%
.54.3%
- 4. UNIT FORCED OUTAGE RATE 15.6%
11.2%
- 11.1%
- 5. FORCED OUTAGE HOURS 112.4 743.3 785.0 6.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):
_ _.!LE[QE_LJM 1_MMN_T.fl@.C_E_ DuTAGE_4]_15/M 198.#.0_ DMS_ _ _ __,. _ _ _ _ _ _
~
7.
IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
4 d
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-397 UNrr WNP-2 DATE 12-2-85 COMPLETED BY LB Hutchison TELEPfiONE (509)377-2486 NOVEMBER 1985 MONTri DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PO%TR LEVEL (MWe-Net)
(MWe-Net) 1 74 9 2
37 747 2
399 s
3 762 19 678 4
751 20 761 3
751 g
6 752 22 7
765 755 23 766 746 2,
759 g
746 3
757 10 742 26 745 g
737 g
756 12 739 3
124 33 737 29 0
737 14 g
0 15 31 0
16 INSTRUCTIONS On this form, list the average daHy unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures wi!! be used to plot a paph for each reporong month. Note that when maximum dependable capacity:s used for the net electrical rating of thc. unit, there may be occasions when the daily average power Icvel exceeds the 100% line (or the restricted power level line). In such cases, the average da:ly urut power output sheet should be footnoted to explain the apparent ancmaly.
e a
- Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372 5000 December 6, 1985 Docket No.
50-397 Director Office of Resource Management U.S.' Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for November 1985.as required by our Technical Specifications 6.9.1.6.
Very truly yours, hhlkMa4-C. M. Powers (M/D 927M)
WNP-2 Plant Manager CMP /lc Enclosure cc: Mr. John B. Martin -
NRC, Region V WNP-2 Site Mr. A. D. Toth Ms. Dottie Sherman -
ANI, Fannington CT Mr. J. T. Wheelock -
INP0
' I
-