1 + h ,,
March 24, 1997
. Florida Power Corporation
. Crystal River Energy Complex'
Mr. Roy A. Anderson.(SA2C)
Senior Vice: President. Nuclear Operations
ATTN:' Hgr.. Nuclear Licensing
-
15760 West Power Line Street-
Crystal-River. FL 34428-6708
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-302/97-01
Dear Mr.. Anderson:
'On February 22. 1997, the NRC completed an inspection at your Crystal River 3
reactor facility. .The en_ closed report presents the results of that
inspection.
During the six week period covered by this inspection period, your conduct of
activities at your Crystal River facility was generally characterized as
adequate.- We are concerned, however, about five violations of NRC
requirements that were identified.
In the area of Operations, two violations
were identified: one violation for clearance tagging requirements, which were
- inadequate to preclude personnel and equipment hazards and resulted in a valve
i
being repositioned while under a red tag clearance, and one violation for
failure to follow procedures, resulting in an inadvertent emergency diesel
generator start.
In the area of Maintenance, one violation was cited for
,
failure to perform a surveillance for the spent fuel pool level.
In the area
j
of, Engineering, two violations were cited: one violation for instrument
!
setpoint calculation assumptions not being translated into procedures and one
violation for inadequate corrective actions related to cable ampacity,
i
These violations are cited in the enclosed Notice of Violation, and the
circumstances surrounding the violations are described in detail in the
enclosed report.
Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
' determine whether further enforcement action is necessary to ensure compliance
I
with regulatory requirements.
In addition, the enclosed Inspection Report identifies activities that
j
violated NRC requirements that will not be subject to enforcement ation
l
because the licensee's efforts in identifying and/or correcting tt violations
!
meet the riteria specified in Section VII.B. of the Enforcement Policy.
-!
Thereforo, no response with respect to these matters is required.
l
i
0FFICIAL COPY
9704150288 970324
$
ADOCK 05000302
M
G
Md
' @. h
h
\\
.
fm
-
.
.
. .
-. .
-
.
.
.
.
.-
_
. _ .
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR),
Sincerely.
Orig signed by Jon R. Johnson
Johns P. Jaudon, Director
Division of Reactor Safety
L
Docket No. 50-302
License No. DPR-72
Enclosures: 1. Notice of Violation
2. Inspection Report 50-302/97-01
,
l
cc w/encls:
John P. Cowan, Vice President
Nuclear Production (SA2C)
i
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
-l
Crystal River, FL 34428-6708
B. J. Hickle. Director
Nuclear Plant Operations (NA2C)
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
David F. Kunsemiller Director (SA2A)
i
Nuclear Operations Site Support
i
'
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
Crystal River. FL 34428-6708
R. Alexander Glenn, Corporate Counsel
FPC MAC - ASA
'
P. O. Box 14042
St. Petersburg. FL 33733-4042
Attorney General
Department of Legal Affairs
The Capitol
. Tallahassee, FL 32304
cc w/encls: See page 3
.
- -
j
'
i
FPc
,
3
j
,
cc w/encls:
Continued
Bill Passetti
Office of Radiation Control
De)artment of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee. FL 32399-0700
Joe Myers. Director
'
Division of Emergency Preparedness
'
Department of Community Affairs
2740 Centerview Drive
Tallahassee. FL 32399-2100
Chairman
Board of County Commissioners
Citrus County
110 N. Apopka Avenue
i
Inverness. FL 34450-4245
)
,
Robert B. Borsum
)
Framatome Technologies
1700 Rockville Pike. Suite 525
Rockville. MD 20852-1631
Distribution w/ enc 1:
.
G. Ho)per. RII
B. Sc11n. RII
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
i
6745 N.-Tallahassee Road
Crystal River. FL 34428
i
- FOR PREVIOUS CONCURRENCE SEE ATTACHED
OrFitt
S!GNATURE
NAME
LMe11en*
Klandis*
Stah111*
TCooper*
BCrowley*
PFillion*
DATE
03 /
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
.. . :.
.:-.. ..
- - : - :. .
- . : : .:.
- - - -
Orritt
SIGNATURE
NAME
R5 chin *
LRaghavan*
MThomas*
DATE
03 /
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
03 /
/ 97
COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
VES
NO
OfflCIAL RtLUK0 COPY
DOCUMtNI HAM-.
6; \\CRf M AL\\ktPunisW7-016.itB
i
.,
03-20-1997 21 50AM
FROM 09RC CRYSTfL RIVER FL.
TO
1-404 331 57EO
E02
7
.
4-
i
Distrinutien w/ enc 1:
G. Hopper. Rll
PUBLIC
NRC Resident Inspect.or
)
U.S. Nuclear Regulatory Concission
5745 N. Tallahassee Road
Crystal River, FL 34428
l
i
i
i
1
l
4
d
_.
.
./
0
S
.
,
arrro
- N'
f
fd,j: ' - fQh f(f pn
113Not I.
/
--
7
i
PF1
umt
W1109
RL
AJCaM 1
TCooper
Keevity
b / 97 k.i
63/ $/9?
03 s W / 97
03 / 1 0 / 97
03[fO/97_
DAit
03 / 1 0 / 97
C3.!
undhuusiliumus
vrMr
$1CNATLWtt
[ )*
NAME
h.n
LRagsaven
MT>eas
MTT
03 /td / 57
03 t h / 97
03 /ADr et
es t
1 97
c3 r
e 97
e3 /
r of
!
vts
no
ves
no
(
coer7
vts
se
vts
no
ves
no
us
no
l
GFilsLN. KL4VNU C0FY
PUC M N) IW ;; G:\\G4YbiMF,LVAlb wi.01F . FEE
TOTAL P 02
--
-
.
.
. - - -.