Requests Regions Cooperation in Responding to Encl Survey. Survey Intended for DRS & DRP Inspectors Who Will Perform Inspections at Power Reactors
ML20137R914
Person / Time
Issue date: 06/18/1996
From:
NRC
To:
NRC
Shared Package
ML20137Q937 List:
References
FOIA-96-485 NUDOCS 9704140290
Download: ML20137R914 (5)


Text

_.

A

&U 5 ton.TKi~

f

. June 18. 1996 j

T0i

. Selected Regional and Resident Inspectors FROM:

Millstone Lessons Learned Task Group l

SUBJECT:

INSPECTOR SURVEY There are a number of groups developing lessons' learned from the issues raised by Hillstone (e.g., the SFP licensing basis survey, on-site inspection team).

Bill Russell. DONRR. established a task group, the Millstone Lessons Learned Task Group, to assess all the lessons learned from these other activities for

- their implications to NRC's oversight processes and overall agency programs, i

To accomplish its objectives. the task force needs to better understand certain agency processes that are not well documented and learn, among other i

things. how inspectors and project managers are using the.UFSAR for their activities and the extent of reviews performed by inspectors and project managers on the reports submitted by licensees pursuant to'10 CFR 50.59 and 50.71(e).

The task force'is requesting each region's cooperation in responding to the attached survey. which is similar to one the task group recently sent to all po r reactor PMs. This survey is intended for DRS and DRP inspectors who i

perform inspections at power reactors in operations, engineering and maintenance areas. i.e.. not security, health physics, emergency planning and training / operator licensing. This is not limited to full time inspectors but should include, for example. DRP project engineers who may participate in

' inspections from time to time. Likewise, operator license examiners who also perform operations. engineering, and maintenance inspections should be included.

The survey should only take about 10 minutes to complete and we would like as many inspectors as possible (even those assigned to the same site) to complete the questionnaire. We ask each region's assistance to identify the inspectors

-meeting the above description and to distribute this message and the attached survey to them.

The task group is not interested in associating responses to individuals or plants, therefore the survey does not ask for any information that would identify the inspector or plant. However, we are on a tight schedule and would like responses submitted via email for timeliness. Access to the.email

~,

address will be restricted and the emails will not be retained after we retrieve the survey response. Any individual who wishes to remain absolutely anonymous may send'a paper copy via interoffice mail, but the group cannot guarantee it will arrive in time to be considered. Feel free to expand on any of your responses.

For each inspector identified by the region, please respond by Wednesday June 26.- either by emailing your answers to SURVEY or sending a hard copy to Steven

. Stein NRR/ DISP. M/S 0-12E4.

Ouestions concerning this-request may be directed to Steve Stein at 301-415-1296.;email SRS.;or Dave Nelson. 301-415-1281. email DJN.

_Th6nk you for your assistance. We plan on communicating the results of the survey to the regions upon completion of this project.

/

9704140290 970327 PDR FOIA

-BINDER 96-485 PDR 4,

y f.

Inspector Survey 1.a.

What inspector assignment do you currently occupy?

i Resident Region based other. - (specify)

b..How long have you been an NRC inspector in all assignments?

years Resident years Region based years other. (specify) 2.a..What are the sources of information you. relied upon in order to learn how to perform the non-technical aspects of your job? Estimate the

. percent _ contribution of each source.

Examples of non-technical aspects are licensing, report writing, conduct of inspections, inspection program requirements.. enforcement. interface with licensees, etc

% formal education

% formal.NRC provided training

% on-the-job training

% general engineering experience

% previous job experience

% other, explain:

TW%

i b.

What are the sources of information you relied upon in order to learn how to perform the technical aspects of your job? Estimate the percent contribution of each source.

E>amples of technical aspects are plant operation, maintenance, engine'. ring, modifications, welding. NDE.

i.

radiological controls, etc.

% formal education

_% formal NRC provided training

% on-the-job training

% general engineering experience

% previous job experience

% other, explain.

TOF%

t 3.

.How often do you corisult Ir.spection Procedures or the Inspection Manual?

always prior to or during an inspection frequently sometimes

' ' ' ~)nfrecurntly riever 4.a.

Have you ever been tasked to verify assumptions or licensee actions related to a license amendment or other licensing action?

yes no i

2

?,

Inspector Survey

-b.

If yes, for the._most recent occurrence 'how was this assigned?

informal request:

-written request from NRR--

Region,
program requirement other. (specify)

N/A c.

How were the results of your actions documented?

informal reply written reply (e.g. memo) inspection report other. (specify)

N/A 5.' a. During the closecut process for LERs and NOVs that'you close, what is the usual status of associated long term (not immediate) corrective actions?

LERs NOVs always fully complete fully complete except for rare circumstances initiated, but not necessarily fully complete planned and scheduled, but not necessarily initiated other, explain b.

What is your understanding of program / management expectations for the status of LER and NOV long term corrective actions necessary for closure?

LERs.

NOVs always fully complete fully complete except for rare circumstances initiated, but not necessarily fully complete planned and scheduled, but not necessarily initiated other, explain

c. 'For items that you have closed with outstanding corrective actions, what was the basis for the closure? (If more than one applies., estimate

. percentage of occurrence.)

inspection program / procedure allowed incom)lete corrective actions low regulatory significance relative to otler inspection demands age of the open item other. (specify) j N/A c,

What percentage of all long term corrective actions considered complete by the licensee do you independently verify prior to closure?

I l

?:

0

_ I

o i.

Inspector Survey.

r l

Do you feel inordinate' pressure to keep the open items backlog small?

6.a.

yes ~

no-b.

If yes._ are there reasonable accommodations for older issues remaining open when necessary?

~.yes no l

N/A 7.

For recent instances in which NRR was consulted regarding a specific plant-(non generic)-issue (s):

.a.

What was the method of communication?

informal request formal ~ request-(e.g. TIA) other. (specify) b.

Were the response times appropriate for the issue (s)?

yes no c.

Was a technically defensible solution obtained?

yes no d.

Overall, is NRR providing good support for inspection related issues?

yes no PTsase explain any negative responses.

8.

Prior to the recent specific guidance on the FSAR as it relates to inspection activities how often did you consult / review the plant specific FSAR?

routinely frequently rarely The following two questions are limited to SRIs in order to get only one response per site.

9.

For Senior Residents: Prior to the recent increased emphasis regarding 50.59 and the FSAR_did you or another resident at your site routinely

' review the licensee's 50.59(b)(2) report? FSAR 50.71(e) update?

50.59(b)(2) 50.71(e) yes yes no no N/A N/A 4

J.,

1+

g Inspector-Survey

)

11.a For Senior Residents: Who performed the most.recent IP 37001 inspection (50.59 review):at your site?

you or another-resident at your site rgion based inspector NRR Project Manager other. (specify)

N/A 6

b. -If the IP 37001 inspection was performed hy the Project Manager. how was the inspection documented?

feeder to resident or. region inspection. report memo from PM.

CTother, (specify) i f

~

l 1

i I

A l

5

\\

H 4

l 1

.z...

,,..