ML20137R008
ML20137R008 | |
Person / Time | |
---|---|
Issue date: | 11/05/1996 |
From: | Linda Watson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Curtis Rapp, West O, York J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML20137Q937 | List: |
References | |
FOIA-96-485 NUDOCS 9704110198 | |
Download: ML20137R008 (1) | |
Text
k II 6 M - , fi l- O .,
From:. Linda Watson / EI -
4//
To:- ATPl.CWR1. ATPl.JWY, ATPl.0BW..JCB. WND2.WNP6. MAS,... C /
Date: 11/5/96 2:21am g %uoe_.Kv2{
Subject:
- RII ENF PANE _** another correction!** 0b T 4R
/
H
'THE ISSUE ON CRYSTAL RIVER FUEL HANDLING WILL BE DELAYED.01 UILL BE ISSUING A REPORT OF INVESTIGATION - DRS WILL PROVIDE 01 A WRITTEN EVALUATION OF 4/7 THEIR REVIEW 0F THE 01 INTERVIEWS.
PLS NOTE NEW STARTING TIMES FOR YOUR ISSUES.
THE REGION II ENFORCEMENT PANEL WILL BE HELD IN THE 30TH FLOOR CONFERENCE ROOM ON WEDNESDAY NOVEMBER 6. 1996. AT 1:00 P.M. THE BRIDGE NUMBER IS 301-415-7605 (PASSCODE 2786687). THE TENTATIVE AGENDA IS AS FOLLOWS:
- 1. 1:00 P.M. - NELSON EXCAVATING - REPANEL - NO RESP TO 30 DAY CH0 ICE LTR.
- 2. 1:15 P.M. - SEQUOYAH 10/11/96 TRIP - MAINTENANCE ISSUES AND FWD ISOL VLV FAILURE ( 2 EAWs ATTACHED - NO OTHER REF MATERIAL) 3, 2:00 P.M. - ST. LUCIE NUCLEAR INSTRUMENTATION INOP (EAW DISTRIBUTED LAST WEEK. E-MAIL ME IF YOU NEED ANOTHER COPY)
& CHRON ATTACHED. - NO OTHER REFERENCE MATERIAL) 01 TO ATTEND
- 5. 3:15 P.M. - CATAWBA 50.59 (EA 96-404)- REPANEL - BREAKER COORDINATION US0 EAW PREVIOUSLY DISTRIBUTED -(ORIGINAL PANEL WAS 10/18)
- 6. 4:00 P.M - HARRIS REPANEL - FAILURE TO SEEK LICENSE AMEND ON LAKE LVL CC: BXU ATB p\
9704110198 970327 DE 485 PDR ,
- - - _ .__u