Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-528/85-26
ML20137R764
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/22/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8512060077
Download: ML20137R764 (1)


See also: IR 05000528/1985026

Text

.

'

.

HOV 221986

Docket No. 50-528

Arizona Nuclear Power Project

P. O. Box 52034

Phoenix, Arizona 85072-2034

Attention:

Mr. E. E. Van Brunt, Jr.

Executive Vice President

Project Director

Gentlemen:

Thank you for your letter dated November 1, 1985, informing us of the steps

you have taken to correct the items which we brought to your attention in our

letter dated October 4, 1985. Your corrective actions will be verified

during a future inspection.

Your cooperation with us is appreciated.

Sincerely,

Orprt! Oc-J -

E J. L. .

D. F. Kirsch, Acting Director

Division of Reactor Safety & Projects

bec w/ copy letter dated 11/1/85:

Mr. Martin, RV

RSB/ Document Control Desk (RIDS)

REGION V/ dot

,,

l

KIRSCll

/) 4

j

h,Y '/k 36 " 4

,

11/2f/85

0512060077 851122

PDR

ADOCK 05000528

0

PDR

reol

--

-

-

-. -

-

-

-

-

-

-

-

.

-

-

- - - - -

. -

.

.

o

e

CEEIVEb

a

o

Arizona Nuclear Power Project

~

p

P o BOX 52034 * PHOENIX. ARI2oN A 85072-2034

ANPP-33897-EEVBf gl{,,; y p .

November 1,1985

,

U. S. Nuclear Regulatory Commission

Region V

1450 Maria lane, Suite 210

,

Walnut Creek, CA 94596-5368

Mr. D. F. Kirsch, Acting Director

Attention:

Division of Reactor Safety and Projects

Palo Verde Nuclear Generating Station (PVNGS)

Subject:

Unit 1

Docket No. STN 50-528 (License No. NPF-41)

Notice of Violation 50-528/85-26/01

File: 85-019-026;D.4.33.2

50-528/85-26, 50-529/85-27 Letter from

NRC Inspection Report

D. F. Kirsch to E. E. Van Brunt, Jr. , dated October 4,1985

Reference:

Dear Sir:

This letter refers to the inspection conducted by Messrs.

R.

Zimmerman,

Based upon the

C. Bosted, and G. Fiore111 from August 1 - September 8,1985

electrical supervision are closed, was issued to

unlocked fire doors without

ANPP as described in the referenced letter.

Our response is provided

as

Attachment A.

Very truly yours,

-

-

hk

O LLk

E. E. Van Brunt, Jr.

Executive Vice President

Project Director

EEVB/FJH/ dim

Attachment

ces

A. C. Gehr

E. A. Licitra

R. P. Zimme man

'b

.N b &

TG-ol

.

-

_

.

<

a

.

.

.

.

ANPP-33897-EEVB/FJH

APPENDIX A

.

NOTICE OF VIOLATION

n

Docket No. 50-528

l

License No. NPF-41

Arizona Nuclear Power Project

P. O. Box 52034

'

1 through

the period August

er

during

inspection conducted

nt Policy,10 CFR Part

September 8,1985, and in accordance with NRC Enforceme

As a result of the

d

2, Appendix C, the following violation was identifie :

aus .

3.7.12 requires that each unlocked fire door

-

located

in

fire

rated

assembly

.

Technical Specification

electrical

supervision

ce per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

penetrations shall be verified closed at least on1985, three unlock

without

During the period April 17 through August 11,d J-126) located in

doors without electrical supervision (J-111, A-336 and to be closed, a

fire rated assembly penetrations, were not verifie day cycle rather tha

fourth door (A-203) was verified closed on a seven

once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, as required.

l

nt 1).

This is a repeat Severity Level IV Violation (Supp eme

..

4

4

a

t'

4-

l

- _ . - _ .

_

_ . _

_ _ , _ - _ - _ . , , , . _ , _ _ _ _ _ _ _ - - _ - _ _ _ _ - , _ _ - - - _ _ . . .

. _ _ . - . _ - - . _ - _ . _ . - . . _ _

.

'

.

,

-

. .

ANPP-33897-EEV3/FJM

,

,

RESPONSE TO NOTICE OF VIOLATION (50-528/85-26

.

^

'

-

Corrective Steps Taken and Results Achieved _

addressed in LER No.

I.

_

as stated in the violation were

l

this

and the following corrective actions were taken to reso ve

The conditions

85-059-00

ired by

,

issue:

A comprehensive review and walkdown of all fire doors requcomplet

1985;

1.

Technical Specifications wasidentification of five unlocked fire

the

the review resulted in

required by Surveillance

the

.

doors that were not being surveilled as

Requirement 4.7.1.2.2d.

^

lts from

As a result of the comprehensive review, and walkdown resu

b r 4, 1985 to

above, a procedure change was incorporated on Septem e

2.

s procedure

include all locked fire doors in the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillanc

This will

" Unlocked Fire Door Position Verification" (14ST-

ensure any fire doors thought

as required.

3.

A review of the station " Procedure Review and Approval P

conducted

to

identify

measures

necessary to preclude the omission of Procedure Change Noti

administrative

controls

was

The

(PCN's) from subsequent revisions of associated procedures.

f Station

review indicated that the procedure " Review an

ht

incorporated into revisions to the

were not considered to have

all PCN's outstanding were

However, the procedures

d

this is

explicit control and are in the process of being revise ;

procedure.

scheduled to be completed prior to January 1, 1986.

Corrective Steps Taken to Prevent Recurrence

II.

fire doors in the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance

(14ST-12224) will

locked

The inclusion of all

Door Position Verification"to be locked

Fire

procedure " Unlocked

ensure any fire doors thought

required.

t ls for

The station procedure changes in progress, on administrative con roex

will more

the procedure review and approval process,

responsibilities in the area of PCN's being included in proced

Is.

revisions.

III. Date When Full Compliance Will Be Achieved _

h

b

stated

Full compliance was achieved on September 4,1985 with t e a ove

i

Door Position

change to the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance procedure " Unlocked F re

Verification" (14ST-12Z24).

i

l

for the

The changes to the station procedures on tJainistrative contro s

procedure review and approval process will be completed p

January 1, 1986.

..

-

.-

- . -

-