ML20137R348

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-369/85-37 & 50-370/85-38 on 851021-25.No Violations or Deviations Noted
ML20137R348
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/14/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20137R351 List:
References
NUDOCS 8512050478
Download: ML20137R348 (1)


See also: IR 05000369/1985037

Text

,

-

'

.

..

.

NOV 14 985

1

Quke Power Company

g/ ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422~ South Church Street

Charlotte,.NC '28242

Gentlemen:

SUBJECT:

REPORT NOS. 50-369/85-37 AND 50-370/85-38

On October 21-25, 1985, NRC inspected activities authorized by NRC Operating

License Nos. -NPF-9 and NPF-17 for your McGuire facility. At the conclusion of

the inspection, the findings were discussed with _those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

. areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Repor Nos. 50-369/85-37

and 50-370/85-38

cc w/ encl:

g L. McConnell, Station Manager

b)cw/ encl:

vflRC Resident Inspector

f. Hood,NRR

Document Control Desk

State'of North Carolina

f

Js0

-

c H1om (3w

ake

lL

rdt.

Ib

11//f/85

1/C/85

3/85

8512050478 851114

PDR

ADOCK 05000369

G

pop

,y

gg

__