SAFEGUARDS INFORMATION-JAN 2 41986 Florida Power Corporation SAIECUARDS INf0RMUD;f smyg ATTN:
Mr. Walter S. Wilgus, Vice President Nuclear Operations P. O. Box 14042, M.A.C. H-2 St. Petersburg, FL 33733 Gentlemen:
SUBJECT:
DOCKET NO. 50-302 This acknowledges the receipt of your letter of November 1, 1985, which transmitted Revision 4 to the Crystal River Unit 3 Physical Security Plan.
Our review of the changes has found portions of the changes to be consistent with the provisions of 10 CFR 50.54(p).
Sone of the changes lack sufficient detail for a review of consistency with the provisions of 10 CFR 50.54(p).
Therefore it is necessary that additional information be provided as delineated in the enclosure to this letter.
Four of the changes have been referred to the Commission's Office of Nuclear Reactor Regulation for review.
These are outlined in the enclosure to this letter.
Other portions are not consistent with the provisions of 10 CFR 50.54(p) as delineated in the enclosure to this letter.
These changes were discussed between Mr. J. Buckner of your staff and Ms. O. Masnyk of the Region II staff on January 13, 1986.
To preclude a violation of regulatory requirements, you must not continue to implement those changes deemed inconsistent.
Please revert to the commitments in your previously approved plan or, if desired, modify your plan to accommodate the enclosed comments and resubmit corrected plan pages as necessary to maintain plan continuity.
Should you want to pursue those changes deemed inconsistent, you must submit a request to the Commission's Office of Nuclear Reactor Regulation, under the provisions of 50.90 for amendment to your license.
The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.
Tne material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the enclosure will not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, 9602050534e6h02 Odginal Signed h PDR ADOCK 05 Roger D. Walker PDR F
Roger D. Walker, Director Division of Reactor Projects l
Enclosure:
(See page 2)
E*: CLOSURE ccitrAyNs
& EGUARDS y-UPCN SEPARAT1, 4(,o\\q SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION-
~
Florida Power Corporation 2
JAN 2 4198(i
Enclosure:
Inconsistent Changes (Safeguards Information) cc w/ encl:
Mr. E. M. Howard, Director Site Nuclear Operations Florida Power Corporation P. O. Box 219 Crystal River, Florida 32629 Mr. P. F. McKee, Nuclear Plant Manager.
Florida Power Corporation P. O. Box 219 Crystal River, Florida 32629 Mr. G. R. Westafer, Manager Nuclear Licensing and Fuel Management Florida Power Corporation P. O. Box 14042, M.A.C. H-2 Jt. Petersburg, Florida. 33733 Mr. S. A. Brandimore, Vice President and General Counsel Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733 cc w/o encl:
Regional Radiation Representative Region IV U.S. Environmental Protection Agency 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Attorney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32304 Mr. Ulray Clark, Administrator Radiological Health Services Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32301 cc w/o enc 1:
(Continued see page 3)
ENCLOSURE CONTAIN3 j
EAFEGUARDS IN" '!?ATION UPON EPPARATI
- HIS SAFEGUARDS INFORMATION5""
"5-
I SAFEGUARDS INFORMATION Florida Power Corporation 3
J A N 2 41986' cc w/o encl:
Continued Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32304 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Board of Country Commissioners ATTN:
Mr. Wilbur Langely, Chairman Citrus County Iverness, Florida 36250 Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee, Florida 32304 Babcock and Wilcox Company ATTN: Mr. Robert B. Borsum Nuclear Power Generation Division Suite 200, 1910 Woodmont Avenue Bethesda, Maryland 20814 bec w/ encl:
Chief, Safeguards Power Reactor Licensing Branch, NMSS, 881-S5 Chief, Standardization and Special Projects Branch, NRR, 340-P Region II Licensing File (50-302),
(04VA), TAB 2 bcc w/o encl:
Document Control Desk (RG01), 42-P NRC Resident Inspector W. Tobin State of Florida RII H
II RII RII Id RII CPerf' K arr JStohr VPs iciera Vr niee Q
Churn OMasnyk:lb cG i.re 01/f/86 01/ftf86 Old/86N01Ag/86 01g86 1/
/86 0/
86 ENCLOSURE CONTAINS SAFrCUARD*
SAFEGUARDS INFORMATION won sem;.I?ORMATION on2nIs nos rs excournou.ro.