Requests Rearrangement of R Kendall Work Assignments in Order to Complete Open Issues Identified in 860103 Memo by 860215.Rearrangement Needed to Support Licensing on Schedule Consistent W/Projected Fuel Load Date
ML20137P503
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/23/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8602050151
Download: ML20137P503 (2)


Text

.

JAN 2 31986 MEMORANDUM FOR: Dennis Crutchfield, Assistant Director DISTRICUTION for Technical Support Docket File Division of PWR Licensing-B NRC PDR Local PDR THRU:

Robert Bernero, Director PDe4 P,eading Division of BWR Licensing BSiegel EHylten FROM:

Walter R. Butler, Director OParr BWR Project Directorate No. 4 RKendall Division of BLR Licensing JCalvo

SUBJECT:

REVIEW ASSIGhhENTS FOR R. KEhDALL RE: RESOLUTION OF CPEN ISSUES FOR CLINTON POWER STATION Consistent with Mr. Denton's November 20, 1985 memorandum, we are relying on Mr. Rick Kendall to complete the reviews for closure of six of the items identified in my January 3,19F6 rremorandum to 0. Parr, Chief of the ICSB Branch, DPWR-A (Enclosure 1). Rick was also on distribution for this memorandum.

These issues were originally scheduled for resolution by the end of August 1985, hcwever, the schedule under the old organization continuously slipped because Mr. Kendall was continually giver, new assignments with more urgent priority (i.e.,

Davis Besse's Loss d Feecuater Event).

Following the reorganization, it was Byron Siegel's, the Clinton Licensing Project Manager's, understanding that Rick would be available to complete the Clinton review in the time frame between late December and early January. This provided the basis for the January 15, 1986 completion date established in the enclosed memorandun. On January 15, 1986, we learned that Rick has aoain been given a special assigtnent (related to the recentRanchSecoevent)andonceagainwillnotbeabletomeetthecurrentcon-pletion date.

Rick performed the ICSB site audit for Clinton in early Scpterrber 1985.

In addition, there are certain features unique to the Clintcn design (i.e., self test system) and issues of long standing that only he can complete in a timely manner to support the Clinten fuel load date in early liarch as projected by Illinois Power.

On this basis, we request that Rick's work assignments be arranged so that he will be in a position to cenplete his reviews on these issues by February 15, 1986, to suppcrt licensing on a schedule consistent with the applicant's projected fuel load date.

Original Signed by 9602050151 860123 ADOCK0500g1 Walter R. Butler, Director PDR A

EUR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated

  • Previously concurred p

PDf4/PM PD#4/D

'D @ D DIR:D

  • BSie el:lb
  • WButle Nieusten RBernero 01/17 86 01/17/86 01/ /86 01/p/86

~%

UNITED STATES E

NUCLEAR REGULATORY COMMISSION L

- p WASHINGTON, D. C. 20555

,/

JAN 2 3 806 l'EM0FANDUM FOR: Dennis Crutchfield, Assistant Director for Technical Support Division of PWR Licensing-C THRU:

Robert Bernero, Director Division of BWR Licensing FR0ft:

Walter R. Gutler, Director BWR Project Directorate No. 4 Divisicn of BWR Licensing Sb5 JECT:

REVIEW ASSIGfiMENTS FOR R. KENDALL RE:

RESOLUTION OF OPEN ISSUES FOR CLINTON POWER STATION Consistent with Mr. Denton's November 20, 1985 memorandum, we are relying en Mr. Rick Kendall to complete the reviews for closure of six of the items identified in my January 3, 1986 memorandum to 0. Parr, Chief of the ICSB Branch, DFWR-A (Enclosure 1). Rick was also on distribution for this memorandum.

These issues were originally scheduled for resolution by the end of August 1985, however, the schedule under the old organization continuou:;1y slipped because Mr. Kendall was continually given new assignments with more urgent priurity (i.e.,

Davis Besse's Loss of Feedwater Event). Following the reorganization, it was Byron Siegel's, the Clinton Licensing Project Manager's, understanding that Rick would be available to complete the Clinton review in the time frame between late Decerrber and early January. This provioed the basis for the January 15, 1986 completion date established in the enclosed memorandum. On January 15, 1986, we learned that Rick has again been given a special assignment (related to the recent Ranch Seco event) and cnce again will not be able to meet the current com-plation date.

Rick perforTaed the ICSB site audit for Clinton in early Septenber 1965.

In addition, there are certain features unique to the Clinton design (i.e., self test system) and issues of long standing that only he can complete in a timely manner to support the Clinton fuel load date in early March as projected by Illinois Power.

Or this basis, we request that Rick's work assignments be arranged so that he will be in a position to complete his reviews ori these issues by February 15, 1986, to support licensing on a schedule consistent with thc applicant's projected fuel load date.

7 Y

t balter R. Butler, Director BWR Project Directorate No. 4 Division of bWh Licensing

Enclosure:

As stattd t

JAN 0 31986 MEMORANDUM FOR: Those on Attached List I

FROM:

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

SUBJECT:

CLINTON POWER STATION: COMPLETION OF LICENSING ACTIVITIES INITIATED PRIOR TO NRR RE0RGANIZATION In Mr. Denton's memorandum, dated November 20, 1985, he provided reorganizational guidelines for reactor licensing activities. To assist you in scheduling work assignments for your staff in accordance with these guidelines, we are providing in the enclosure an identification of the prior comitments of those members of your staff associated with the review of licensing activities related to Clinton Power Station.

The applicant has recently changed its proposed fuel load date from January 3, 1986 to between late February and late March 1986. The completion dates for the reviews of the itens identified in the enclosure support the applicant's earliest proposed fuel load date and includes time for issuance of the SSER.

The infomation in the enclosure in most instances reflects input received from the reviewers.

If you have any questions regarding the schedule contained in the enclosure

~

please contact the Clinton Licensing Project Manager Byron Siegel (x28344).

(

Originsi Sirned LT

~.

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated DISTRIBUTION Docket File SWest NRC PDR NWagner Local POR PHearns PD#4 Reading AMasciantonio BSiegel LRuth EHylton Alee RKendall JLonbardo JLazevnick RPichumani ANotafrancesco MWangler AGarg JLee DYue RLi KParczenski RKirkwood CTan JRajara 1

PD#f/

,b PDe4/D BSteg WButler 1/v7/ 6 1/2./86 l

g-

,f

-,)

-l o a y _u.A p, y 4.f.

4 Addressees - Memorandum dated JAN 0 3 1986

[

G. Lainas, Assistant Director for Technical Support, DBL B. D. Liaw, Chief Engineering Branch, DBL G. Hulman, Chief Plant Systems Branch, DBL H. Srinivasan, Chief Electrical, Instrumentation & Control Systems Branch, DBL W. Hodges, Acting Chief Reactor Systems Branch, DBL 2 '-

D. Vassallo, Chief

~

Facilities Operations Branch, DBL W. Regan, Chief Facility Operations Branch, DBL

0. Parr, Chief Electrical, Instrumentation and Control Systems Branch, DPWR-B

[

F. Rosa, Chief

\\

Electrical, Instrumentation and Control

's Systems Branch, DPWR-A W. Gammill, Chief Plant Systems Branch, PWR-1 s

M. Williams, Chief Technical Assistance Nanagement Branch, PPAS W. Johnston, Chief Engineering Branch, PWR-B R. Bosnak, Chief Engineering Issues Branch, DSR0 e

e

g/'p sac o,

UNITED STATES 3

NUCLEAR REGULATORY COMMISSION t,

waswisoroN. o. c. 20sss

(

\\s, * * " *,l JAN 0 31986 MEMORANDUM FOR: Those on Attached List FROM:

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

SUBJECT:

CLINTON POWER STATION: COMPLETION OF LICENSING ACTIVITIES INITIATED PRIOR TO NRR REORGANIZATION In Mr. Denton's memorandum, dated November 20, 1985, he provided reorganizational guidelines for reactor licensing activities. To assist you in scheduling work assignments for your staff in accordance with these guidelines, we are providing in the enclosure an identification of the prior comitments of those members of your staff associated with the review of licensing activities related to Clinton Power Station.

The applicant has recently changed its proposed fuel load date from January 3, 1986 to between late February and. late March 1986. The completion dates for k

thereviewsoftheitemsidentifiedintheenclosuresupporttheapplicant's earliest proposed fuel load date and includes time for issuance of the SSER.

e The information in the enclosure in most instances reflects input received from the reviewers.

If you have any questions regarding the schedule contained in the enclosure

'please contact the Clinton Licensing Project Manager Byron Siegel (x28344).

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated t

e

g p

G T

CLINTON SER OR MAME SSER SECTION SUBJECT MAN HR$

REQ'O 1 C(MPLETE TO COMPLETE COMPLETION DATI A. Lee SER 3.10 MST 90 16 1/31/86 SSER l-22

, Equipment Seismic Assessment Program 60 30 1/15/86 J. Lombardo SER 3.10 PVORT 85 60 1/31/86 R. Pichumani,

SER 3.6.2 Jet leipingement & Pipe Rupture Analysis 80 60 1/15/86 SER 3.9.2 Review Results of Testing Program (Vibr.,

Thermal. Dynamic) 0 M. Idangisr 00CM 85 10 1/15/86 J. Lee Review Revised FSAR Section 11.4 10 80 2/15/86 SER 11.4.1 PCP and Compliance Program (10 CFR 61) 10 80 2/15/86 SER 12.3.1 Provide initial Leak Rate Test Results 0

R. Li SER 3.9.6. 5.2.4 IST 0

2/15/86 R. Kirkwood Instrument Tubing - Code Relief Request 85 12 1/15/86 J. Rajam SSER l-22 Equipment Seismic Assessment Program 0

40 1/15/85 C. P. Tan SSER 6.2.1.8 Survey Gram Gulf Inplant Tests of SRV's 90 1/15/85

  • 30 D2ys free Receipt uf Information from Applicant
    • Af t:r Fuel Load E2 U'

'ie

I e

,.m A

e LICENSING ACTIVITIES INITIATED PRIOR TO NRR RECRGAN!7AT10N CLINTGN SER OR MAN HRS REQ'D NAME SSER SECTION SUBJECT

COMPLE1E TO COMPLETE COMPLETION DATE R. Kendall Compliance with 10 CFR 50.62 (ATWS) 5 7

2/15/E6 SSER 2-7.2.3.3 Self Test System 90 8

1/15/86 SER 7.4.3.1 Remote Shutdown, Compliance GDC 19 70 15 1/15/86 SER 7.7.3.1 Centrol Systems Failures From HEL8 5

60 2/15/86 SER 15.2.1 & 7.2.3.1 ATWS Recirculation Pump Trip 95 2

1/15/86 SSER 2-7.3.3.7 Design Changes to 80P Valves for LOCA 85 2

1/15/86 SER 7.3.2.3 Vacuum Breaker Position Indication Concerns 90 2

1/15/86 J. Lanynick CAT Inspection - Cable Separation 85 32 1/31/86 Issues Resulting From Site Review 20 30 Change in Scope in Voltage Verification Test 85 30 1/31/86 A. Notafrancesco SER 6.2.7 H Control - Preliminary Analysis Review 40 100 1/31/86 2

A. Garg (Total) 1/15/86 D. Yue 1/15/86 K. Parczenski 1/15/86 C. Taa 1/15/86 S. West EER 3-9.5.14 Auto. Fire Detection in Safety Releated Areas 85 20 1/15/86 SER 9.5.1 Safe Shutdown Anal / Fire Protection Eval. Rpt 75 120 1/31/86 Use of Other Than Rigid Steel Conducts 50 5

1/15/86 N. Wagner SER 3.6.1 HEL8/MEL8 Flooding 60 10 1/15/86 SER 3.6.1 HELB Containment Spray 60 10 1/15/86 CAT Inspection - Floor Grating 25 30 1/31/86 P. He:rns Analysis of Piping Failures Outside Containment 10 1/31/86 A. Nasciantonio SER 3.11 Equipment Qualification of Elect.8 Mechanical Equip. 95 40 L. Ruth SER 6.2.1.8 Suppression Pool Hydrodynamic Loads 90 16 1/31/86 SER 6.2.1.9 Humphrey Containment Issues 90 16 1/31/86