Forwards Insp Rept 50-424/85-56 on 851216-20.No Violations or Deviations Noted
ML20137N420
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/22/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20137N425 List:
References
NUDOCS 8602030203
Download: ML20137N420 (3)


See also: IR 05000424/1985056

Text

.

.

JAN 2 21986

G9 ergia Power Company

JUTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NO. 50-424/85-56

On December 16-20, 1985, NRC inspected activities authorized by NRC Construction

Permit No. CPPR-108 for your Vogtle facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-424/85-56

jcw/ancl:

R. E. Conway, Senior Vice President

/ Nuclear Power

VD. O. Foster, Vice President

/ and General Manager Vogtle Project

J. H. Gregory, III, General

Manager, Vogtle Nuclear Construction

(cc w/enci cont'd - see page 2)

%20ggj h { [

.

'

Georgia Power Company 2

(cc w/ enc 1 cont'd)

G. Bockhold, Jr. , Vogtle

Plant Manager

L. T. Gucwa, Chief

Nuclear Engineer

Ruble A. Thomas,

Vice President-Licensing Vogtle

Project

Ed Groover, Quality

Assurance Site Manager

C. W. Hayes, QA Manager

J. T. Beckham, Vice President

& General Manager - Operations

J. A. Bailey, Project Licensing

Manager

George F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge

Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

Ernest L. Blake, Jr. , Esq.

Shaw, Pittman, Potts and Trowbridge

James E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

James G. Ledbetter, Commissioner

Department of Human Resources

Charles H. Badger, Office of

Planning and Budget, Management

Review Division

Deppish Kirkland, III, Counsel

Office of the Consumer's Utility

Council

Douglas C. Teper, Georgians Against

Nuclear Energy

Laurie Fowler, Esq., Legal Environmental

Assistance Foundation

Tim Johnson, Executive Director

Campaign for a Prosperous Georgia

Morton B. Margulies, Esq., Chairman

Administrative Judge, Atomic Safety

and Licensing Board Panel

Dr. Oscar H. Paris, Administrative Judge

Atomic Safety and Licensing Board Panel

Gustave A. Linenberger, Jr. , Administrative

Judge, Atomic Safety and Licensing Board

Panel

Billie Pirner Garde, Citizens

Clinic Director, Government

Accountability Project

(bcc w/ encl - see page 3)

.

.

.

Georgia Power Company 3

tyc w/ enc 1:

W . Reis, ELD

B. Sinkule, RII

WRC Resident Inspector

Document Control Desk

State of Georgia

,

. . - .

RI ,

RI RII RII RII 4

A 18

ACunn gham:Jw Decker DCollins 'Rankin MSinkule

/// 85 12/ /85 1$/8/85 12/9/85 12/g;/85

8/9r '/2/sr