ML20137N167

From kanterella
Jump to navigation Jump to search

Forwards Amends 206 & 147 to Licenses DPR-57 & NPF-5 & Safety Evaluation.Amends Revise Surveillance Requirements Addressing Reactor Vessel Pressure & Temperature Limits
ML20137N167
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/04/1997
From: Jabbour K
NRC (Affiliation Not Assigned)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20137N171 List:
References
TAC-M96609, TAC-M96610, NUDOCS 9704080274
Download: ML20137N167 (3)


Text

Mr. H. L".'Sumner,.Jr.,

April-4, 1997 Vice PresidInt' 5:uthern Nuclear Operating Company, Inc..

P. O. Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

ISSUANCE OF AMENDMENTS - EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M96609 AND M96610) f

Dear Mr. Sumner:

The Nuclear Regulatory Commission has issued the enclosed Amendment No. 206 to Facility Operating License DPR-57 and Amendment No. 147 to Facility Operating License NPF-5 for the Edwin I. Hatch Nuclear Plant,. Units I and 2.

The amendments consist of changes to the Technical Specifications (TS) in response to your application dated September 19, 1996, as supplemented December 17, 1996,-January 23 and 31, March 21 and April 4, 1997.

The amendments revise the surveillance requirements addressing the reactor vessel pressure and temperature (P/T) limits. The staff has concluded that the P/T limits for heatup, cooldown, hydrotest, and criticality of the reactor coolant system meet the requirements of Appendix G to Section XI of the ASME Code and Appendix G to 10 CFR Part 50, and are, therefore, acceptable.

A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Reaister

notice, Sincerely, j

s I

(

ORIGINAL SIGNED BY:

i i

f Kahtan N. Jabbour, Senior Project Manager Project Directorate II-2 Division of Reactor Projects - I/II m.-

Office of Nuclear Reactor Regulation

~<.

j yDocket Nos. 50-321 and 50-366

'4 J.,*.,

. ft)k

Enclosures:

, 1.

Amendment No.'206"to'DPR-57 i

D'

'2.

. Amendment No. 147<to NPF-5 3.

Safety Eviluation' t

ccwfenc1: See.nextpage['

DISTRIBUTION-Docket File JJohnson,RII i

h k gg'.;

COPY

'"PUBLIC '

G. Hill (4) T-5 C3 PDII-2 Reading '.'"

C. Grimes S.Varga ACRS T-2 E26 P. Skinner, RII OGC' TLH3 e-mai1 SE only DOCUMENT NAME:

G:\\ HATCH \\96609.AMD

  • See previous concurrence dm i porz/LA osca oE:ENCB*

h onicE i

N.'tEW NAME K.

00Ut L.8ERRY CNARC0 SELIOT DATE 4/Y/97 4/ /97 3/18/97 4/1/97 4/h/97 NN EE N 9704080274 970404 PDR ADOCK 05000321 P

PDR

-~

p"'n I

,p

t UNITED STATES g

j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 30ee6-e001

.m.

April 4,1997 Mr. H. L. Sumner, Jr.

'~

Vice President Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

ISSUANCE OF AMENDMENTS - EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M96609 AND M96610)

Dear Mr. Sumner:

The Nuclear Regulatory Commission has issued the enclosed Amendment No. 206 to Facility Operating License DPR-57 and Amendment No. 147 to Facility 0)erating License NPF-5 for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.

T1e amendments consist of changes to the Technical Specifications (TS) in response to your application dated September 19, 1996, as supplemented j

December 17, 1996, January 23 and 31, March 21 and April 4, 1997.

i The amendments revise the surveillance requirements addressing the reactor i

vessel pressure and temperature (P/T) limits.

The staff has concluded that i

the P/T limits for heatup, cooldown, hydrotest, and criticality of the reactor coolant system meet the requirements of Appendix G to Section XI of the ASME Code and Appendix G to 10 CFR Part 50, and are, therefore, acceptable, A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Reaister l

notice.

S e

f[

/

tnN.Jabour/'SeniorProjectManager

/

1

/

K

[

oject Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos'. 50-321 and 50-366 1

Enclosures:

1.

Amendment No. 206 to DPR-57 2.

Amendment No. 147 to NPF-5 3.

Safety Evaluation cc w/ enc 1: See next page e

i I

i Edwin I. Hatch Nuclear Plant j

Units 1 and 2 cc:

Mr. Ernest L. Blake, Jr.

Nr. Thomas P. Mozingo 1

Shaw, Pittman, Potts and Trowbridge Program Manager 2300 N Street, NW.

Nuclear Operations Washington, DC 20037 Oglethorpe Power Corporation j

2100 East Exchange Place Mr. D. M. Crowe P. O. Box 1349 Manager, Licensing Tucker, Georgia 30085-1349 Southern Nuclear Operating Company, Inc.

Charles A. Patrizia, Esquire P. O. Box 1295 Paul, Hastings, Janofsky & Walker i

Birmingham, Alabama 35201-1295 10th Floor i

1299 Pennsylvania Avenue Resident Inspector Washington, DC 20004-9500 U.S. Nuclear Regulatory Commission 11030 Hatch Parkway North Chairman Baxley, Georgia 31513 Appling County Commissioners County Courthouse Regional Administrator, Region 11 Baxley, Georgia 31513 t

U.S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 Mr. W. G. Harriston, III Atlanta, Georgia 30323 President and Chief Executive Officer Mr. Charles H. Badger Southern Nuclear Operating Office of Planning and Budget Company, Inc.

Room 610 P. O. Box 1295 l

270 Washington Street, SW.

Birmingham, Alabama 35201-1295 Atlanta, Georgia 30334 Mr. J. D. Woodard Harold Reheis, Director Executive Vice President Department of Natural Resources Southern Nuclear Operating 205 Butler Street, SE., Suite 1252 Company, Inc.

Atlanta, Georgia 30334 P. O. Box 1295 Birmingham, Alabama 35201-1295 Steven M. Jackson Senior Engineer - Power Supply Mr. P. W. Wells Municipal Electric Authority General Manager, Edwin I. Hatch of Georgia Nuclear Plant 1470 Riveredge Parkway, NW Southern Nuclear Operating Atlanta, Georgia 30328-4684 Company, Inc.

11030 Hatch Parkway North Baxley, Georgia 31513