ML20137M649

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Re Verification of Adequate Flow Path from Discharge of Sodium Hydroxide Addition Pump to Containment Spray Pump Discharge.Flow Requirement Changed to 13 Gpm
ML20137M649
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/30/1985
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20137M623 List:
References
NUDOCS 8509130291
Download: ML20137M649 (1)


Text

-_

~ CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) d.

At least once per 18 months, during shutdown, by:

1.

Verifying that each automatic valve in the flow path actuates to its correct position on a CSAS test signal.

2.

Verifying that each sodium hydroxide addition pump starts automatically on CSAS test signal.

e.

At least once per 5 years by verifying a flow rate of at least 13 gpm through each sodium hydroxide injection path from the sodium hydroxide pump discharge to the containment spray pump discharge.

ARKANSAS - UNIT 2 3/4 6-13 8509130291 e50830 PDR ADOCK 05000 M p

PDR L.

- - - - - -