Requests That Design Packages Re Control Room Design Improvements,Listed in Encl,Be Reviewed on High Priority Basis & Results Be Provided as Soon as Possible.Notification Requested If Review Not Needed
ML20137L893
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/17/1986
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Berkow H
Office of Nuclear Reactor Regulation
References
P-86005, TAC-56125, NUDOCS 8601280128
Download: ML20137L893 (3)


Text

-

gPublic Service ~

=g;;',L.

16805 WCR 19 1/2, Platteville, Colorado 80651 January 17, 1986 Fort St. Vrain Unit No. 1 P-86005 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. H.N. Berkow, Project Director Standardization and Special Projects Directorate Docket No. 50-267

SUBJECT:

Staff Review of the Fort St. Vrain Control Room Design Review Summary Report

REFERENCE:

1) NRC Letter (G-85363)

Hunter to Lee Dated 8/27/85

2) PSC Letter (P-85384)

Warembourg to Butcher Dated 10/29/85

3) PSC Letter (P-85454)

Warembourg to Berkow Dated 12/3/85

Dear Mr. Berkow:

Public Service Company is evaluating the feasibility of implementing four of the control room design improvements during the second calendar quarter of 1986.

These changes were submitted for staff review under cover of references 2 & 3 in response to reference

1. to this letter lists these four changes by the design package submittal title and attachment number.

The purpose of this letter is to request that these particular design packages be reviewed on a relatively high priority basis and that the results of these reviews be provided is soon as possible. This ir. formation is needed in order to make a final determination relative to the amount and nature of work to be scheduled.

S O

8601280129 860117 AD

  • D. CNUTCMr n AO PDR ADOCK 05000267 t s v., mas to,, " ' "" "'" 8 1}[

t-F PDR asajt 4

Fog (w an,4yy

t.

This request is based on our understanding that NRC review and.

approval.of these changes is required prior to PSC implementation.

If this is not the case and 'we can proceed with our-proposed modifications under'10CFR50.59, we would like to be so advised.

If you have any questions, please contact'M. H. Holmes at (303) 480-6960.

Very truly~yours, LO 7?. W m f )

D. W. Warembourg Manager, Nuclear Engineering Division DW:DJG/sid Attachments i

i 1

1

.i r

e i

l

)

P-86005 Page 1 of 1 3

j ITEM TRANSMITTAL ATTACHMENT TITLE LETTER TO THE

SUMMARY

REPORT 1

P-85384 6b-2 Summary of the Control Room Improvement Design Process as

~

applicable to I-02.

2 P-85384 6b-3 Summary of the Control Room i

l Improvement Design Process as 4

applicable to the Brake & Seal Indication Changes (CN-1984).

3 P-85454 6b-9 Summary of the Control Room Improvement Design Process as applicable to Control Room Furnishings and Arrangement.

1 4

P-85454 6b-10 Summary of the Control Room Improvement Design Process as applicable to Control Room Lighting.

i i