ML20137L354
| ML20137L354 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/14/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20137L360 | List: |
| References | |
| NUDOCS 8601270420 | |
| Download: ML20137L354 (1) | |
See also: IR 05000413/1985051
Text
r
j(
s
/
M 14 ISD
Duke Power Company
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-413/85-51 AND 50-414/85-59
On November 18-22, 1985, NRC inspected activities authorized by NRC Operating
License No. NPF-35 and Construction Permit No. CPPR-117 for your Catawba
,'
facilities. At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed _ inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
,
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report Nos, 50-413/85-51
and 50-414/85-59
cc w/ encl:
R. L. Dick, Vice President - Construction
J. W. Hampton, Station Manager
bec w/ encl:
K. N. Jabbour, NRR
Document Control Desk
State of South Carolina
NRC Resident Inspector
O '/, )g*
/ /3/
RII
R
RII s
/
RII
TDGibbons:cdg
TFMcElhinney
TEConlon
ARHerdt
12/ /85
12/ 4 /95
W/ /8g
1&L-fe5
w
i
u
)
\\\\4
\\
9601270420 860114
\\
ADOCK 05000413
i
O
f0i
-
-