Forwards Insp Repts 50-317/85-30 & 50-318/85-32 on 851105-1210.Weaknesses in Maint Area Identified.Mgt Should Assess Condition of Emergency Diesel Generators Re Good Maint Practices.Response Requested
ML20137K589
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/14/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20137K596 List:
References
NUDOCS 8601240140
Download: ML20137K589 (2)


See also: IR 05000317/1985030

Text

. . . . _ . .. . __

, .. .

4

.

'

JAn 141986

DOCKET / LICENSE: 50-317/DPR-53

50-318/DPR-69

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

j Baltimore, Maryland 21203

Gentlemen:

Subject: NRC:RI Inspection 50-317/85-30, 50-318/85-32

'

This transmits the November 5 - December 10, 1985 resident inspection findings by

<

Messrs. T. Foley and D. Trimble at the Calvert Cliffs Nuclear Power Plant, Lusby,

Maryland. Those findings were based on observation of activities, interviews,

independent measurements, and document reviews, and have been discussed with

Mr. Russell of your staff.

This report identifies weaknesses in the maintenance area. Persistent air, water,

j

lubricating and fuel oil leaks have been observed associated with your Emergency

Diesel Generators (EDG). Also, oil soaked rags and lagging as well as volatile

solvents have been found in the EDG rooms. Inspection Report 317/85-26, 318/85-24

also identified general poor EDG appearance and similar conditions which present

j a potential fire hazard.

4

Management should assess the condition of the Emergency Diesel Generators relative

to good maintenance practices and take appropriate action. You are requested to

respond to this letter and discuss what actions will be taken to improve EDG con-

ditions. Performance in the maintenance area does not appear to be consistent with

your previous high standards as identified during the last Systematic Assessment

of Licensee performance. Your attention is warranted to reverse this trend.

Your cooperation with us is appreciated.

Sincerely,

i

Ort.1:_; S10ned 37 :

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

l

8601240140 860114

i PDR ADOCK050g7

>

G

M -01 3

I

i i t

.

- - . . , _ . . , . - _ - - . _ _ _ - , - _ - - _ - _ _ _ - , - _ - _ _ ,

_ . . - - _ .

- _

- _ _ - , _

. . . . - _ _ . - _ - - - - _ _ _ . - - _ . .. - _ __ . _ _ . - - _ . .-. ,

....L . "'

,

Baltimore Gas and Electric Company 2

.

JAN 141996

Enclosure: NRC:RI Report 50-317/85-30, 50-318/85-32

'

cc w/ enc 1:

R. M. Douglass, Manager, Quality Assurance

, L. B. Russell, Plant Superintendent

T. Magette, Administrator, Nuclear Evaluations

,

R. C. L. Olson, Principal Engineer, Nuclear Licensing & Analysis Unit

!

J. A. Tiernan, Manager, Nuclear Power Department

R. E. Denton, General Supervisor, Training and Technical Services

Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

bec w/ encl:

l . Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enclosure)

Director, DRS

Director, DRSS

'

DRP Section Chief

D. Jaffe, LPM, NRR

M. McBride, RI, Pilgrim

i

i

> ,

>

-

.

i

!

!

i

i

r

l

t

!

j i

i- --

RI:D RI: P R.

f I' s

4 4<' Foley imble/ss Els sser e z'r'ger

12/20/85 i g4 /

j OFFICI L RECORD COPY

4

,,-. ,- ,. c . , - , . - . . _ - , --_-.a ,- - __.....,, ,,... -- -.,, , --- ,-,---