ML20137K507

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/85-27 on 851201-31 & Notices of Violation & Deviation
ML20137K507
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/17/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20137K510 List:
References
NUDOCS 8601240114
Download: ML20137K507 (2)


See also: IR 05000285/1985027

Text

.

.

JAN 171986

In Reply Refer To:

Docket: 50-285/85-27

.

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager -

Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by Mr. P. H. Harrell of this office

during the period December 1-31, 1985, of activities authorized by NRC

Operating License DPR-40 for Fort Calhoun Station, and to the discussion of our

findings with Mr. W. G. Gates at the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

maintenance, surveillance, followup on previously identified items, followup on

licensee event reports, and followup on IE Sulletin 83-07. Within these areas,

the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. These findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

Also during this inspection, it was found that certain of your activities

appeared to deviate from commitments made to the NRC. These items and

references to the ccamitments are identified in the enclosed Notice of

Deviation. You are requested to respond to these deviations in writing. .Your

response should be based on the specifics contained in the Notice of Deviation

enclosed with this letter.

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Two unresolved items are discussed in paragraph 5 of the enclosed inspection

report.

[IV: SRI

RPB/B

RPB

HHarrell/cg[DMHunnicutt plEGagliardo

/ / //]/86

/

f f}/86

//7 /86

0601240114 e60117

PDR

ADOCK 0500

5

'(0

o

-

&1

J *

..

.

,

.

4

'

Omaha Public Power District

-2-

'

,

.

Should you have any questions concerning this inspection, we will. be p] eased to

discuss them with you.

Sincerely,

(julxaf Y' h

x.e. Mad

p J. E._Gagliardo,- Chief

. Reactor Projects Branch

.

Enclosures:

,

1.

' Appendix A - Notice of Violation

2.

Appendix B - Notice of Deviation

3. . Appendix C'- NRC Inspection Report'.

50-285/85-27

cc w/ enclosures:

W. G. Gates, Manager

i

Fort Calhoun Station-

'

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas State Department of Health

Nebraska State Department of Health

bec to DMB (IE01)

.

t

bec distrib. by RIV:

.

R. D. Martin, RA

  • RPB
  • Resident Inspector,
  • EP&RPB
  • Section Chief (RPB/B)
  • D. Weiss,'LFMB (AR-2015)
  • RIV File

DRS&P

  • RSB

'

  • MIS SYSTEM
  • RSTS Operator

'

  • w/766

'

<

-

,

,

%

U