Corrected Monthly Operating Rept for May 1985
ML20137K270
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/31/1985
From: Farrell M
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20137K234 List:
References
NUDOCS 8509120111
Download: ML20137K270 (1)


Text

.

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT NAME 50NGS - 2 DATE LAs rysd Jul 15,1985)

COMPLETED BT M. J. Farrell TELEPHONE (714) 492-7700 Ext. 56907 OPERATING STATUS 1.

Unit Name: San Onofre Nuclear Generating Station. Unit 2 2.

Reporting Period:

May 1985 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross We):

if~27 5.

Design Electrical Rating (Net We):

lii?0 l

6.

Maximum Dependable Capacity (Gross MWe):

1127 l

7.

Maximum Dependable Capacity (Net We):

fd70

)

8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

J Since Last Report, Give Reasons:

NA

]

9.

Power Level To Which Restricted, If Any (Net MWe):

NA 1

10.

Reasons For Restrictions, If Any:

NA I

i l

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744,00 3,623.00

~~

15,59CT1 672.00

12. Number Of Hours Reactor Was Critical 686.2T 960 43 8,

1

13. Reactor Reserve Shutdown Hours d~

0 d~

}

14. Hours Generator Or-Line 671.11 913.99 836C4~6 1
15. Unit Reserve Shutdown Hours 0~~~

0-0 I

16. Gross Thermal Energy Generated (MWH)

~

!i3 IEC20~

2 fl0 948 76~ [85(6,78C06~ ~2(6 867 8 TEE j

17. Gross Electrical Energy Generated (MWH)a 1

744 227 T6~

8.53d~01750 D67 j

18. Net Electrical Energy Generated (MWH) 767iefEdo 710,14CF1-o9 Coo i
19. Unit Service Factor 90 10-25 2T 6E64

~

)

20. Unit Availability Factor 90720~

2C2T 53 64 1

21. Unit Capacity Factor (Using MOC Net) 8E91~

108T 3D 89

22. Unit Capacity Factor (Using DER Net) 88 91~

197T 51E89 l

23. Unit Forced Outage Rate C8Y-fE55~ __

C85

]

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA l

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

NA j

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NX~~

COMMERCIAL OPERATION RA MAZ 1

2941u 4

J l

1

--