, NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT NAME 50NGS - 2 DATE LAs rysd Jul 15,1985)

COMPLETED BT M. J. Farrell TELEPHONE (714) 492-7700 Ext. 56907 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station. Unit 2
2. Reporting Period: May 1985
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross We): if~27

! 5. Design Electrical Rating (Net We): lii?0 l 6. Maximum Dependable Capacity (Gross MWe): 1127 l 7. Maximum Dependable Capacity (Net We): fd70

) 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

J Since Last Report, Give Reasons:

NA

] 9. Power Level To Which Restricted, If Any (Net MWe): NA 1 10. Reasons For Restrictions, If Any: NA I

i l

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744,00 3,623.00 672.00
12. Number Of Hours Reactor Was Critical 686.2T

~~

960 43 15,59CT1 8,

1

13. Reactor Reserve Shutdown Hours d~ 0 d~

} 14. Hours Generator Or-Line 671.11 913.99 836C4~6 1 15. Unit Reserve Shutdown Hours ~

0~~~

0- 0 I 16. Gross Thermal Energy Generated (MWH) !i3 IEC20~

j 17. Gross Electrical Energy Generated (MWH)a fl0 1948 2 744 227 T6~ 76~ [85(6,78C06~2(6 ~ D67867 8 TEE j 18. Net Electrical Energy Generated (MWH) 767iefEdo 710,14CF1- 8.53d~01750 o9 Coo

19. Unit Service Factor

~

i 90 10- 25 2T 6E64

) 20. Unit Availability Factor 90720~ 2C2T 53 64 1

21. Unit Capacity Factor (Using MOC Net) 8E91~

108T 3D 89

22. Unit Capacity Factor (Using DER Net) -

88 91~ 197T 51E89 l 23. Unit Forced Outage Rate C8Y- fE55~ __ C85

] 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

! NA l -

! 25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA j 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA

INITIAL ELECTRICITY NA NX~~

COMMERCIAL OPERATION RA MAZ 1

4 2941u J

l 1