NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT NAME 50NGS - 2 DATE LAs rysd Jul 15,1985)
COMPLETED BT M. J. Farrell TELEPHONE (714) 492-7700 Ext. 56907 OPERATING STATUS 1.
Unit Name: San Onofre Nuclear Generating Station. Unit 2 2.
Reporting Period:
May 1985 3.
Licensed Thermal Power (MWt):
3390 4.
Nameplate Rating (Gross We):
if~27 5.
Design Electrical Rating (Net We):
lii?0 l
6.
Maximum Dependable Capacity (Gross MWe):
1127 l
7.
Maximum Dependable Capacity (Net We):
fd70
)
8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
J Since Last Report, Give Reasons:
NA
]
9.
Power Level To Which Restricted, If Any (Net MWe):
NA 1
10.
Reasons For Restrictions, If Any:
NA I
i l
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744,00 3,623.00
~~
15,59CT1 672.00
- 12. Number Of Hours Reactor Was Critical 686.2T 960 43 8,
1
- 13. Reactor Reserve Shutdown Hours d~
0 d~
}
- 14. Hours Generator Or-Line 671.11 913.99 836C4~6 1
- 15. Unit Reserve Shutdown Hours 0~~~
0-0 I
- 16. Gross Thermal Energy Generated (MWH)
~
!i3 IEC20~
2 fl0 948 76~ [85(6,78C06~ ~2(6 867 8 TEE j
- 17. Gross Electrical Energy Generated (MWH)a 1
744 227 T6~
8.53d~01750 D67 j
- 18. Net Electrical Energy Generated (MWH) 767iefEdo 710,14CF1-o9 Coo i
- 19. Unit Service Factor 90 10-25 2T 6E64
~
)
- 20. Unit Availability Factor 90720~
2C2T 53 64 1
- 21. Unit Capacity Factor (Using MOC Net) 8E91~
108T 3D 89
- 22. Unit Capacity Factor (Using DER Net) 88 91~
197T 51E89 l
- 23. Unit Forced Outage Rate C8Y-fE55~ __
C85
]
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA l
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
NA j
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NX~~
COMMERCIAL OPERATION RA MAZ 1
2941u 4